East Croydon you can turn round in Platform 5 and use the Reversible slow to keep completely clear of Up Slow traffic, if you wanted to. Although I agree it's slightly mad not to continue all the way to London Bridge.East Croydon seems a crazy place to turn around - must be very difficult to do it without conflict, and if you're going all the way there you may as well carry on another 15 mins to London Bridge. Oxted as a terminus I could understand off peak, that's what they always did in the days of electric stock to East Grinstead and Thumpers to Uckfield.
That may have been so, but they didn't and now we're left with what we've got.I'd have thought the natural time to have electrified Uckfield was around the time when the Thumpers finished their service and the 377s came in. They could just then have ordered more 377s. Doing it in 1987 on the other hand with East Grinstead was presumably difficult as there were insufficient CIGs and VEPs to cover both branches. (Incidentally, and admittedly OT, where did they get the CIGs and VEPs from to cover the 1987 East Grinstead electrification? Some were released in 1988 with the introduction of Thameslink, but that leaves the Sep 87 - May 88 period unaccounted for).
Personally, a short extension of 3rd rail to allow units to get round the corner at Hurst Green and battery units would be the optimum solution, even if it requires a rapid charge at Uckfield. I believe this has been suggested by other posters more knowledgeable than I as well. As mentioned in the general 3rd rail extension thread, Batteries under every EMU would have a wide range of benefits on the 3rd rail network generally.