Basingstoke and the branches are flatter and probably more suitable shorter term. And if wired, along with Didcot to Oxford, they could spend most of their lives on ac electric until more class 387sbeccome available. Whilst conductor rails along the Wokingham to Reigate stretch should sort that too!!
mods note - split from here.

If only - the principle of no more significant 3rd rail has scuppered that to give us this half-baked non-solution!
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,272
Location
Churn (closed)
If only - the principle of no more significant 3rd rail has scuppered that to give us this half-baked non-solution!
Not correct, the ORR, RSSB and Network Rail has agreed to reverse this ruling to enable 3rd rail extensions - ref RAIL issue 956 - 4th May 2022
 

RPI

Established Member
Joined
6 Dec 2010
Messages
3,346
Not correct, the ORR, RSSB and Network Rail has agreed to reverse this ruling to enable 3rd rail extensions - ref RAIL issue 956 - 4th May 2022
Horray! Basingstoke to Exeter....
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,471
Location
Gomshall, Surrey
Not correct, the ORR, RSSB and Network Rail has agreed to reverse this ruling to enable 3rd rail extensions - ref RAIL issue 956 - 4th May 2022
Excellent - will that, I wonder, bear fruit for the stretch in question. I was only one day out of date, though!
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,272
Location
Churn (closed)
Excellent - will that, I wonder, bear fruit for the stretch in question. I was only one day out of date, though!
I think the idea of 3rd rail extensions has been brewing for a while due to the need to decarbonise the railway.

I actually got my copy of RAIL on 30th, so you were 5 days out of date!

== Doublepost prevention - post automatically merged: ==

Horray! Basingstoke to Exeter....
Funny enough, the article mentions Uckfield, Rye, North Downs, and Exeter! Also Merseyside extensions too.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,471
Location
Gomshall, Surrey
I think the idea of 3rd rail extensions has been brewing for a while due to the need to decarbonise the railway.

I actually got my copy of RAIL on 30th, so you were 5 days out of date!

== Doublepost prevention - post automatically merged: ==


Funny enough, the article mentions Uckfield, Rye, North Downs, and Exeter! Also Merseyside extensions too.
Well, who would have thought - it's taken them long enough to realise this!
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,328
Location
Reading
Not correct, the ORR, RSSB and Network Rail has agreed to reverse this ruling to enable 3rd rail extensions - ref RAIL issue 956 - 4th May 2022
The article itself isn't quite so definite as this interpretation. It states (p68):
Reports that Network Rail and the Office of Rail and Road are working with the Rail Safety and Standards Board to create standards for new third rail electrification are most welcome.
No more and no less.

Anything else is supposition. This is not to say that the standards which are apparently being worked on will not emerge but writing and approving standards takes time. Also any electrification schemes have to be planned, costed and the money found before any capital works can start so basically what I am saying is — don't hold your breath.
 
Last edited:

supervc-10

Member
Joined
4 Mar 2012
Messages
763
Agreed- don't hold your breath- but this is still definitely welcome news. Infill for the Basingstoke-Salisbury-Exeter, Uckfield, Marshlink, and North Downs would eliminate a lot of diesel over 3rd rail running and be a huge step for decarbonisation, and likewise expansion of the MerseyRail network out to places like Preston. Simply the news that NR and ORR are even *talking* about setting standards for expansion of 3rd rail is a big leap forwards!

This does also continue the advantage of bi-modes - you can use the existing electrification more efficiently, and progressively get cleaner over time as more electrification is built.

If- and this is a big if - the 769s eventually settle down into being actually reliable trains, they could be sent elsewhere on the network to operate as bi-modes and the North Downs go over to 387s.
 

Snow1964

Established Member
Joined
7 Oct 2019
Messages
11,113
Location
West Wiltshire
The article itself isn't quite so definite as this interpretation. It states (p68):

No more and no less.

Anything else is supposition. This is not to say that the standards which are apparently being worked on will not emerge but writing and approving standards takes time. Also any electrification schemes have to be planned, costed and the money found before any capital works can start so basically what I am saying is — don't hold your breath.

Short third rail extensions can be relatively cheap and quick. In many cases the feeder cables had provision made for, or were partly installed years ago. Generally all the concrete sleeper already have holes with plugs ready to have the third rail pots installed.

There is also some secondhand equipment, or more specifically equipment where a mainline had its power upgraded. Some of this would be ok for some lightly used lines where not going to get thousands of amps drawn multiple times an hour which risks substations getting hot.

I would not be surprised if at least one like could be done for a capital cost of zero (excluding the third rail), using parts already paid for laying around in storage.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
Agreed- don't hold your breath- but this is still definitely welcome news. Infill for the Basingstoke-Salisbury-Exeter, Uckfield, Marshlink, and North Downs would eliminate a lot of diesel over 3rd rail running and be a huge step for decarbonisation, and likewise expansion of the MerseyRail network out to places like Preston. Simply the news that NR and ORR are even *talking* about setting standards for expansion of 3rd rail is a big leap forwards!

This does also continue the advantage of bi-modes - you can use the existing electrification more efficiently, and progressively get cleaner over time as more electrification is built.

If- and this is a big if - the 769s eventually settle down into being actually reliable trains, they could be sent elsewhere on the network to operate as bi-modes and the North Downs go over to 387s.
By any stretch of the imagination, Basingstoke to Exeter is not an 'infill', (primarily because there are no electrified routes within 75 miles of the western end of that route). Secondly, at 123 miles, it's stretching credibility saying that increasing a 3rd rail route by over 2.5 times it's existing length is an 'extension', especially if justifying it to reduce diesel running, - just 1 train per hour each way beyond yeovil and only two per hour each way as far as Salisbury, hardly a convincing case for building and running miles of lossy 3rd rail and substations. I doubt that NR and ORR would see that as relevant to their discussions.
 

Cowley

Forum Staff
Staff Member
Global Moderator
Joined
15 Apr 2016
Messages
18,910
Location
Devon
Does anyone have a news story that we can link to this thread please?
 

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
Very welcoming news.

While Marshlink, Uckfield and the North Downs lines are the most obvious candidates for conversion, I wonder if the Wessex area would still be better off with OHLE. While Basingstoke - Exeter (with a possible switchover at Pinhoe unless you want to make the Exmouth branch 3rd rail too) makes sense as an extension of the southern third rail system, the Bristol to Weymouth and Portsmouth routes have equal amounts of route in both 3rd rail and OHLE territory. Maybe these could become bi-modal with switchovers at Yeovil and Salisbury respectively.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,270
By any stretch of the imagination, Basingstoke to Exeter is not an 'infill', (primarily because there are no electrified routes within 75 miles of the western end of that route). Secondly, at 123 miles, it's stretching credibility saying that increasing a 3rd rail route by over 2.5 times it's existing length is an 'extension', especially if justifying it to reduce diesel running, - just 1 train per hour each way beyond yeovil and only two per hour each way as far as Salisbury, hardly a convincing case for building and running miles of lossy 3rd rail and substations. I doubt that NR and ORR would see that as relevant to their discussions.
I’m sure the 2009 electrification route strategy suggested it would likely AC for that route. The Romsey area and towards Salisbury was shown as either way, but not the main route.
 

PTR 444

Established Member
Joined
22 Aug 2019
Messages
2,647
Location
Wimborne
I’m sure the 2009 electrification route strategy suggested it would likely AC for that route. The Romsey area and towards Salisbury was shown as either way, but not the main route.
Thinking about it, Yeovil to Exeter is often used by GWR IET diverts, therefore that stretch would need to be OHLE unless you wanted to add a shoegear to the 800s and 802s.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,029
Location
St Albans
I’m sure the 2009 electrification route strategy suggested it would likely AC for that route. The Romsey area and towards Salisbury was shown as either way, but not the main route.
I thought that as well, but I didn't want to inflame the 3rd rail acolytes any more than saying that 3rd rail wasn't a clever idea for that line. The key thing is that OLE, - even as far as Salisbury might help to restart the the electric spine project.
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,272
Location
Churn (closed)
Does anyone have a news story that we can link to this thread please?
It's in RAIL 956 under the Industry Insider on page 68.
Luckily not everything is online :rolleyes:

1651855372946.png

This is the top of the page, I will not share the whole copyrighted page as you should buy the mag
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Your claim in post #2 is gross exaggeration of what the RAIL article says.

I had already read the article and thought it didn't say anything much that was new. In fact I had torn out the page, put it in the paper recycling, and forgotten about it! It's mainly a history of the growth of third rail in the UK.
 
Last edited:

supervc-10

Member
Joined
4 Mar 2012
Messages
763
By any stretch of the imagination, Basingstoke to Exeter is not an 'infill', (primarily because there are no electrified routes within 75 miles of the western end of that route). Secondly, at 123 miles, it's stretching credibility saying that increasing a 3rd rail route by over 2.5 times it's existing length is an 'extension', especially if justifying it to reduce diesel running, - just 1 train per hour each way beyond yeovil and only two per hour each way as far as Salisbury, hardly a convincing case for building and running miles of lossy 3rd rail and substations. I doubt that NR and ORR would see that as relevant to their discussions.
I agree- infill is not the best word for Basingstoke to Exeter, but I was more thinking about how to remove the remaining diesel services around the SE and in particular, into central London. Currently Uckfield and the WoE line are the only non-open access diesel services into London that don't depart from Marylebone. The Chiltern line would not be ideal to electrify with 3rd rail (although dual voltage units which can make use of the underground's electrification on the Amersham line would make sense, if the line was electrified, just like the Watford DC lines), and Grand Central would be better off getting 802s or something like that to replace their 180s (money notwithstanding).

I think Uckfield and Marshlink are probably the priority for 3rd rail electrification, being relatively short and eliminating not only some diesel running right into central London, but also removing a fleet type from Southern and allowing for the modern 171s to be converted to 170s and used elsewhere displacing older Sprinter stock. 25kV though might well be better for the WoE line, and could also link up with electrifying Basingstoke-Reading.

As so many have said- a rolling program of electrification would be a huge benefit to the network and decarbonisation, and likely be cheaper per km of track than the piecemeal approach that has always been taken.
 

Sir Felix Pole

Established Member
Joined
21 Oct 2012
Messages
2,168
Location
Wilmslow
The 'RAIL' article rather implausibly advocates third-rail for Barnstaple, Exmouth and Okehampton as well! Something is afoot, however, for 'Modern Railways' carried a story regarding third-rail electrification for Uckfield in the April edition - the unelectrified section is too long apparently for battery operation. Mitigation would include switching the power off in stations when trains are not present. Marshlink, however, is suitable for battery operation.
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,991
Location
UK
What's the betting some very sensible infill projects will be announced/completed and more DC stock needed just in time for the industry to have finished scrapping all the surplus DC units...
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,272
Location
Churn (closed)
Your claim in post #2 is gross exaggeration of what the RAIL article says.

I had already read the article and thought it didn't say anything much that was new. In fact I had torn out the page, put it in the paper recycling, and forgotten about it! It's mainly a history of the growth of third rail in the UK.
I have used the Daily Mail as fire lighting paper without reading it but cannot say that I have ever been angry enough to rip pages out of RAIL!! :(
 

fgwrich

Established Member
Joined
15 Apr 2009
Messages
10,632
Location
Hampshire
What's the betting some very sensible infill projects will be announced/completed and more DC stock needed just in time for the industry to have finished scrapping all the surplus DC units...
With the exclusion of perhaps the now departed 365s, there is little else from the 3rd Rail EMU Staple really worth saving in all honesty - it's either old and tired, or hardly going to live long enough (either in service or in storage) until the time comes when they could be used on any of the proposed infill schemes.

Perhaps potentially, with the exception of the GW 769s, which if they can prove themselves for a few years in service in Diesel mode, could simply drop the diesels and return back to being 319s. I don't hold much hope!
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I have used the Daily Mail as fire lighting paper without reading it but cannot say that I have ever been angry enough to rip pages out of RAIL!! :(
I wasn't angry. I have a lot of half-read old magazines lying around, and when I'm sure I won't need a page any more, I tear it out and throw it away, so I won't waste time reading it again in six months' time.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,334
Location
Yorks
What's the betting some very sensible infill projects will be announced/completed and more DC stock needed just in time for the industry to have finished scrapping all the surplus DC units...

Highly likely :lol:
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,368
Location
Hertfordshire / Teesdale
Highly likely :lol:

There isn’t really that much surplus DC.

319s - can’t really see these doing much more now they’ve gained rather a reputation for poor reliability

365 - gone, and unlikely to have ever worked on DC again without significant work

442 - gone

458 - mainly spoken for (for time being, at least)

465/2 - only a handful, and could yet return to SE

379 (by way of releasing 387) - probably required to maintain capacity on GN and/or SN

350/2 - well possibly.

313/507/508 - well over book life now, can’t reasonably expect further use from these now.

455/456 - okay these could probably do a bit more, especially the retractioned ones.

Have I missed anything?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,334
Location
Yorks
There isn’t really that much surplus DC.

319s - can’t really see these doing much more now they’ve gained rather a reputation for poor reliability

365 - gone, and unlikely to have ever worked on DC again without significant work

442 - gone

458 - mainly spoken for (for time being, at least)

465/2 - only a handful, and could yet return to SE

379 (by way of releasing 387) - probably required to maintain capacity on GN and/or SN

350/2 - well possibly.

313/507/508 - well over book life now, can’t reasonably expect further use from these now.

455/456 - okay these could probably do a bit more, especially the retractioned ones.

Have I missed anything?

I admit, I do find it difficult to keep up with the rate at which stuff goes to the torch these days !
 

A0

On Moderation
Joined
19 Jan 2008
Messages
7,751
There isn’t really that much surplus DC.

319s - can’t really see these doing much more now they’ve gained rather a reputation for poor reliability

365 - gone, and unlikely to have ever worked on DC again without significant work

442 - gone

458 - mainly spoken for (for time being, at least)

465/2 - only a handful, and could yet return to SE

379 (by way of releasing 387) - probably required to maintain capacity on GN and/or SN

350/2 - well possibly.

313/507/508 - well over book life now, can’t reasonably expect further use from these now.

455/456 - okay these could probably do a bit more, especially the retractioned ones.

Have I missed anything?

The 350/2s have never run on 3rd rail either and were never delivered with 3 rd rail shoes - it's not even clear whether they are dual voltage enabled.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
20,368
Location
Hertfordshire / Teesdale
The 350/2s have never run on 3rd rail either and were never delivered with 3 rd rail shoes - it's not even clear whether they are dual voltage enabled.

Yes we never seem to have had a definitive answer on that one. It probably is do-able from a technical point of view, but at what cost.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
Yes we never seem to have had a definitive answer on that one. It probably is do-able from a technical point of view, but at what cost.
Lower cost than procuring another new fleet of DC EMUs, with the advantage of compatibility with existing Class 450 and 444 EMUs.
 