Trainbike46
Established Member
installing waterless urinals would be a way to reduce how quickly the train runs out of water / how quickly the retention tanks fill up. But ideally you would just fit each toilet with everything it has now, and then a urinal as well, so that urinal use (and therefore water savings) would be maximised, without reducing toilet availability for anyone.
NS in the Netherlands trialled them by installing them on the VIRMm, the logic being that it would keep the mess caused by some men away from the regular toilet, so it would stay cleaner for everyone who had to or wanted to sit down. (I think only on the VIRMm-1?), but apparently a problem was found with people mistaking the urinal for a sink (do not ask me how someone could do that, or how NS found out about it, I don't know and I don't think I want to know), So they decided not to expand it to other traintypes
== Doublepost prevention - post automatically merged: ==
If possible, fitting larger retention tanks or bioreactors would be the most obvious solution, but that might not fit under some types of rolling stock
NS in the Netherlands trialled them by installing them on the VIRMm, the logic being that it would keep the mess caused by some men away from the regular toilet, so it would stay cleaner for everyone who had to or wanted to sit down. (I think only on the VIRMm-1?), but apparently a problem was found with people mistaking the urinal for a sink (do not ask me how someone could do that, or how NS found out about it, I don't know and I don't think I want to know), So they decided not to expand it to other traintypes
Possibly TfW fitted larger retention tanks?Indeed. Instead of storing waste in tanks, we could just discharge it at the earliest opportunity, as we used to.
OK, toilets flushing onto tracks aren't going to come back, but a system that doesn't rely on depots and pipes and staff and stabling shouldn't be out of the realms of possibility, if this is a real problem.
When I used to use Southern a lot I did see a lot of toilets automatically out of order. Now I mainly use TFW and it's very rare to see. TFW's routes are a lot longer and the depots a lot more dispersed, so could this be an incompetence problem rather than a technical / engineering issue?
== Doublepost prevention - post automatically merged: ==
If possible, fitting larger retention tanks or bioreactors would be the most obvious solution, but that might not fit under some types of rolling stock
Last edited: