I disagree, I think it disambiguates it from the Undeground.Noticed line diagrams by the PEDs on the Jubilee line at LBG have Elizabeth line on them now. Inclusion of the word “line” looks odd when set against the others.
I disagree, I think it disambiguates it from the Undeground.Noticed line diagrams by the PEDs on the Jubilee line at LBG have Elizabeth line on them now. Inclusion of the word “line” looks odd when set against the others.
But is not done for any Overground line, TfL rail currently, Thameslink etc. There is no way on God's earth that anyone outside of tourists will call it the Elizabeth Line.I disagree, I think it disambiguates it from the Undeground.
You reckon? Living in north London no-one l know calls the Victoria line anything other than the Vic. Similarly with the Pic aka the Piccadilly line.Of course they will, not everybody is a rail enthusiast that's been watching this project for the last 25 years who stubbonly say they will only call it crossrail
It's like when a big company change their name and everyone says nobody will call it that - yet in time they do. See Starburst/Opal Fruits, Snickers/Marathon etc
Correct! 10 pointsI heard the opening date will be the 17th May now
(well unless it changes)So make way for the liz/lizzie.You reckon? Living in north London no-one l know calls the Victoria line anything other than the Vic. Similarly with the Pic aka the Piccadilly line.
That is my expectation.So make way for the liz/lizzie.
Very much a need for it - especially for tourists. The established underground lines' names have been in use for decades, (22 years for the Jubilee, 54 years for the Victoria and over 100 years for the rest). When the signs are replaced, by then the (daft) name of the line may well become sufficiently ingrained in London minds that the actual word 'line' can be presumed understood and omitted. Meanwhille, the sheer expense of those extra words will have to be endured.Looks really silly with the addition of 'line'. No need for it, just extra words!
Agreed. It's called a 'line' exactly as Central, Circle, Victoria, etc. and they don't get the word 'Line' added. It might be that the word is there to start with to draw attention, and it will disappear in subsequent updates (however long that will be). My thinking is rather like when the Victoria line was first added to the 'Beck' map it was (I think) the only diagonal line. It thus looked odd at first but it was done like that for publicity, later changing.Looks really silly with the addition of 'line'. No need for it, just extra words!
I heard the opening date will be the (date) now
Correct! 10 points(well unless it changes)
The opening Elizabeth line operational timetable is somewhat TBA, but whatever level of service operates at launch will drastically exceed the 5tph service on the last full line that TfL opened (the East London Line on the Overground). Complexity in railway operation doesn’t scale linearly, it scales exponentially, and this means there remain challenges around working out what the best balance of stability vs launch service on the Elizabeth line.
Most of these relate to the two systems that have proven most problematic to Crossrail’s construction and fit-out since the start: Train software and signalling.
The line will have a solid claim to be the first “fully digital” railway, at least at its scale, in the world. And that’s meant Siemens and Bombardier (or rather Alstom now), as signalling and rolling stock manufacturers respectively, moving from worlds where they were dealing with mature, physical setups to a new way of working and testing. With hindsight, how these interface with each other on a digital level has proven considerably more complex than any of those involved in the project expected to be (although exactly as complex as the software industry would have told them to expect, but that’s a discussion for another day) and time consuming to get right...
Yes, very interesting, particularly the first bit.Interesting from London Reconnections: https://www.londonreconnections.com/2022/the-purple-elephant-in-the-room-crossrails-opening-date/
The truth is that Crossrail’s opening date (Or the Elizabeth line, as it is finally becoming) is currently a moveable feast.
That article says the lack of auto turn back at Paddington will likely prevent 22tph in 2022. What will it be? More like 12 at launch and rising to 16 as they get good at the detraining?
Ah, ok. We were definitely at cross-purposes there. I doubt that many will call it Crossrail.Apolgies Wolfie I agree that people will call it the liz or lizzie line - I thought you meant nobody would refer to it as anything other than crossrail
Speculation on the launch date is the main reason I'm watching this thread!Should this really be discussed on a public forum, particularly if the opening is meant to be soft?
There is a big 24tph test on Sunday though so it could be time in lieu or just something else needs to be done in the tunnel today.One thing I have noticed is no trains running today on RTT (unless there is a data feed error?). Seems a bit surprising.
Also, it also seemed strange to me they aren't running test services on the weekends?
That article says the lack of auto turn back at Paddington will likely prevent 22tph in 2022. What will it be? More like 12 at launch and rising to 16 as they get good at the detraining?
Thanks. Let me check: it could be 22 without this software working, it won’t be higher than that in service this year.Read the article again, carefully.
It wouldn't be 22 tph before there is through running as they don't have enough 345s without the efficiency that through running allows.Thanks. Let me check: it could be 22 without this software working, it won’t be higher than that in service this year.
I don't think it will. The specific codes of PDX, LSX, FDX, WDX (Paddington, Liverpool St, Farringdon and Whitechapel respectively) all exist and are separate from the mainline stations. It will be very much a 5 minute frequency "turn-up-and-go" even from the 'reduced' Central section timetable though, so shouldn't be too much waiting (bar disruption).
I don't think it will. The specific codes of PDX, LSX, FDX, WDX (Paddington, Liverpool St, Farringdon and Whitechapel respectively) all exist and are separate from the mainline stations. It will be very much a 5 minute frequency "turn-up-and-go" even from the 'reduced' Central section timetable though, so shouldn't be too much waiting (bar disruption).
| Tiploc | CRS | minor CRS | Name |
| STPADOM | STP | STP | London St Pancras |
| STPX | STP | STP | London St Pancras |
| STPXBOX | STP | SPL | London St Pancras LL |
| PADTON | PAD | PAD | London Paddington |
| PADTLL | PAD | PDX | London Paddington Crossrl |
| Tiploc | CRS | Name | Additional Description |
| STPX | STP | St Pancras International | London St Pancrs |
| STPXBOX | SPL | St Pancras International | St Pancras Low L |
| PADTON | PAD | London Paddington | London Paddingtn |
| PADTLL | PDX | Paddington Crossrail | Paddington Xrail |
Working on the National Rail data I've found that on some multi-part stations, there are a "CRS code" and a "minor CRS code" defined for a station. For example, in the station database, there are:
Tiploc CRS minor CRS Name STPADOM STP STP London St Pancras STPX STP STP London St Pancras STPXBOX STP SPL London St Pancras LL PADTON PAD PAD London Paddington PADTLL PAD PDX London Paddington Crossrl
and in the timetable data, there are:
Tiploc CRS Name Additional Description STPX STP St Pancras International London St Pancrs STPXBOX SPL St Pancras International St Pancras Low L PADTON PAD London Paddington London Paddingtn PADTLL PDX Paddington Crossrail Paddington Xrail
So I believe the handling will be similar to St Pancras at the moment - the low-level platforms will have their own minor CRS code, but in the stations data they will be part of the larger station so they can be searched using the main CRS code.