Mod Note: Posts #1 - #5 originally in this thread.
Southern have released some new information a few days ago about the new timetable information. The finalised timetable won't come out until 29 April, but the basics are on the website.
Here's the link: https://www.southernrailway.com/travel-information/plan-your-journey/timetables
Southern have released some new information a few days ago about the new timetable information. The finalised timetable won't come out until 29 April, but the basics are on the website.
- Brighton-Southampton Central/Portsmouth Harbour services are no longer terminating at Chichester
- 2tph will run at alot of times between Brighton-Hastings with 1tph being extended to Ore
- London Bridge-Beckenham Junction services will be 1tph off peak, and 2tph peak
- The Clapham Junction to Watford Junction service is returning
- The additional 2tph between London Victoria and Sutton will not run on Saturdays
- West Worthing-Brighton services will not run
- Lewes-Brighton services will not run
- London Bridge-London Victoria services will not run anymore at all
Here's the link: https://www.southernrailway.com/travel-information/plan-your-journey/timetables
Last edited:
