Other than the shoes, this isn’t possible. The electrical equipment is purely DC input. Fitting transformers for AC OHL means sacrificing the battery capability unfortunately.Perhaps they should just remove the 3rd rail equipment. Convert them to OHL and send the 777s to a more appreciative customer waiting for some better, newer trains.
Meantime the Merseyrail older trains can soldier on till they fall apart. Till the unions enter the 21st century ethos.
The 507/508s are bravely soldiering on well into their 5th decade of intensive service and BREL of the 1970s must be commended for manufacturing such a reliable piece of equipment. What exactly is this 21st century ethos?
The guards panels are physically being fitted but this in itself doesn’t do anything towards the unions agreeing a method of operation using said panels.I can totally understand the whole DOO issue. But that's sorted, isn't it, with the fitment of guard panels in progress?
Yes they must, but that doesn’t seem to be the issue the unions are protesting about, although what is is beyond anyone who isn’t an expert on trade unionism. How much nicer to drive was a 507/508 compared to the previous 40 year old pre-war 502/503s and what did the unions have to say about them then?They must be so much nicer to drive than a rotting, uncrashworthy 40-odd year old rattletrap where the driver sits in a tiny little cupboard.
The 507/508s are likely to remain in service a good while longer, but what exactly is a 777 other than a decent metro train. They aren’t suitable at all from tram operations and don’t downgrade the service the same way the T68s did on the Bury and Altrincham lines.I don't blame Aslef for being hostile. Their drivers are basically being downgraded from train drivers to tram drivers. God only knows why Merseyrail opted for what is essentially a tram rather than a decent metro train. I for one hope the 50x remain in service for a good while longer.
I have heard great things about the premium quality Stadler kit running up and down under very poor rail conditions in the latter part of the year, with virtually no wheel slip and even less effect on the timings. The cheap, unreliable rubbish CAF 195s on the CLC line however could barely put any power down onto the track and lost time.What a load of nonsense. Stadler kit is excellent, they are not trams. The staff aren't being subjected to cheap, unreliable rubbish like CAFs, they're getting the highest quality, premium trains in the business, designed specifically for Merseyrail, and not at all on the cheap.
Yes, but if and when this is resolved, we will have many years to appreciate this premium quality Stadler kit which has been built for our use and the improvements they will bring including battery operation to unelectrified destinations including Headbolt Lane, Warrington Central, Wrexham, Helsby, Burscough, Preston and Skelmersdale. In the meantime, we are fortunately still able to appreciate the pinnacle of premium quality British suburban EMUs of the 1970s which were built for our use 40 years ago not bettered for over 20 years after they were built, so we must appreciate this feat of engineering because it won’t be around forever. We are also able to see our trains for future use being tested most days.The customers are Merseytravel and through them, the public who would rather like to be able to appreciate the trains that have been built for their use.
Thanks for the clarification.