• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Where could class 350/2s units go?

Status
Not open for further replies.

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
Lumo got its access rights by putting a case that it was competing with airlines on time and adding passengers to the railway. To some extent, that is a little dubious as it will be taking market from LNER as well. It is looking to use its trains intensively and concentrate traincrew at a single Newcastle base.

Running London to Glasgow via Manchester in six, maybe seven hours is neither intensive or good competition against other flows. The demand from London to Glasgow is less than Edinburgh in any case.

Or, perhaps a class 90 that can actually do 110mph. Going via Manchester adds time to the journey even if paths were available.
A Pendolino can do the journey in regular service at four and a half hours, or under four hours if pushing it. I say it could be done in five to five and a half hours, which while probably not as quick as Lumo could still contest a plane, especially factoring in wait time and passenger experience.

The reason I said Deltic was because I'd like to make my money back if I did try it, unless you know people who would pay for a ride behind a class 90 or 91?

== Doublepost prevention - post automatically merged: ==

Tinfoil hat nonsense.

The simple facts are via Manchester is longer, slower (because the linespeeds are slower) and you're suggesting the use of 110mph stock compared to 125mph which is used which is also slower.

You'll be adding over an hour to the current journey time and limited stopping which in turn will limit its usefuleness.

This feels more like a crayonista desire to cover certain routes on certain stock than a sensible proposal.
I made it quite clear I don't see it ever happening, and was talking purely hypothetical. Sorry if you don't like theoretical discussion in a speculative discussion thread.....
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
I made it quite clear I don't see it ever happening, and was talking purely hypothetical. Sorry if you don't like theoretical discussion in a speculative discussion thread.....
It's not really speculative if it's patently never going to happen.

== Doublepost prevention - post automatically merged: ==

The current interior on the 458s would not be suitable for the 2 hour journey, of many passengers travel end to end, and so they’ll need a major interior re-work, re-gearing and having an intermediate coach removed. you’ve also got the training costs involved which will be more substantial than on Desiro based.
You know that they're already sending units to Alstom Widnes to have the extra car removed and the motors regeared, right?
 
Last edited:

pompeyfan

Established Member
Joined
24 Jan 2012
Messages
4,445
It's not really speculative if it's patently never going to happen.

== Doublepost prevention - post automatically merged: ==


You know that they're already sending units to Alstom Widnes to have the extra car removed and the motors regeared, right?

I am indeed aware one has gone so far as a test bed.
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,883
Location
Cambridge
It's not really speculative if it's patently never going to happen.
Porterbrook suggested that they were looking at battery conversions, didn't they? I see that being more of a likely future than running on electrified routes, at least without heavy modification or a carriage being removed.
 
Last edited by a moderator:

XAM2175

Established Member
Joined
8 Jun 2016
Messages
3,471
Location
Glasgow
Porterbrook suggested that they were looking at battery conversions, didn't they? I see that being more of a likely future than running on electrified routes, at least without heavy modification or a carriage being removed.
My "patently never going to happen" judgement is directed at MattRat's plan for a London-Manchester-Glasgow open-access operation using the 350/2s as the "WCMLs [sic] version of Lumo".
 

TT-ONR-NRN

Veteran Member
Joined
30 Dec 2016
Messages
12,883
Location
Cambridge
My "patently never going to happen" judgement is directed at MattRat's plan for a London-Manchester-Glasgow open-access operation using the 350/2s as the "WCMLs [sic] version of Lumo".
Yes, I know. I responded to that bit too but that part is no longer in the post. Apologies for the mix up.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
13,190
Tinfoil hat nonsense.

...

This feels more like a crayonista desire to cover certain routes on certain stock than a sensible proposal.
Are these not the reason for being of this subform? :D
 
Status
Not open for further replies.

Top