Hi all - today I travelled in the peak into Paddington and arrived into platform 12.
The location of the gateline causes such a bottleneck as customers attempt to tap out - it’s located a couple of carriages up the platform, so customers in the first 2 carriages need to double back and then try and work their way into the queue of other passengers.
It was madness today. Those with bikes trying to head to the disabled gate, others trying to push through.
Has anyone else experienced this? Surely it would make more sense to place the gateline at the end of the platform, or stop the train a little short so no double-backing of passengers is needed.
The location of the gateline causes such a bottleneck as customers attempt to tap out - it’s located a couple of carriages up the platform, so customers in the first 2 carriages need to double back and then try and work their way into the queue of other passengers.
It was madness today. Those with bikes trying to head to the disabled gate, others trying to push through.
Has anyone else experienced this? Surely it would make more sense to place the gateline at the end of the platform, or stop the train a little short so no double-backing of passengers is needed.