GWR Class 769 information. (Units no longer with GWR - Off Lease March 23)

Status
Not open for further replies.

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,354
Regarding your last sentence, I was always under the impression that the 319s/769s are capable of 100mph as that was the maximum speed they ran at when they worked on Thameslink.
Yes, 319s are capable of 100mph on electric (although whether the extra weight of the diesel engine still allows that is a different matter).

Or is it that when using diesel power, they can only go at a maximum of 75mph?
The diesel performance isn't as good as what they can manage as 319s on electric. I actually wasn't noting a top speed, just noting that Bristol to Taunton has a higher line speed than any route they are intended to work on diesel on LTV services.

This indicates that Network Rail have limited the Northern ones at least to 75mph.
https://www.railforums.co.uk/thread...lly-for-northern.138660/page-178#post-5143298

As 'Clarence Yard' wrote in this post https://www.railforums.co.uk/threads/gwr-dec-19-timetable.180888/page-9#post-4162364 the higher 90mph top speed of the Turbos is needed around Bristol and 75mph 769s can run the relevant LTV services.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AM9

Veteran Member
Joined
13 May 2014
Messages
16,046
Location
St Albans
Regarding your last sentence, I was always under the impression that the 319s/769s are capable of 100mph as that was the maximum speed they ran at when they worked on Thameslink.

Or is it that when using diesel power, they can only go at a maximum of 75mph?
I originally though that which was reinforced by reports that they achieved 92mph on test at Loughborough, but it appears that the additional weight of the gensets and fuel in the driving cars has led NR to limit them to 75mph to which their track access charge is now probably aligned.
 

Halish Railway

Established Member
Joined
26 Apr 2017
Messages
2,176
Location
West Yorkshire / Birmingham
This indicates that Network Rail have limited the Northern ones at least to 75mph.
https://www.railforums.co.uk/thread...lly-for-northern.138660/page-178#post-5143298
I think the extra weight has only posed a problem between Salford Crescent and Bolton due to the poor ground conditions caused by mining. When they worked TPE Anglo-Scottish routes the 185s were unable to use the MU Speed differentials on the same bit of track, thus were limited to 75mph with a brief spell of 80mph.
 

craigybagel

Established Member
Joined
25 Oct 2012
Messages
5,829
I think the extra weight has only posed a problem between Salford Crescent and Bolton due to the poor ground conditions caused by mining. When they worked TPE Anglo-Scottish routes the 185s were unable to use the MU Speed differentials on the same bit of track, thus were limited to 75mph with a brief spell of 80mph.
I did wonder if it was a differential issue rather than an outright network wide limit. Salford - Bolton is the only section the 769s would have a chance of exceeding 75 anyway due to lower line speeds and/or close proximity of stations on the rest of the routes they serve.
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,633
Location
South Staffordshire
Regarding your last sentence, I was always under the impression that the 319s/769s are capable of 100mph as that was the maximum speed they ran at when they worked on Thameslink.

Or is it that when using diesel power, they can only go at a maximum of 75mph?
It is said 769s become a little feeble on diesels at around 75 mph, and with a few extra tonnes under each end vehicle, they won't be as nimble as the straight electric class 319.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,046
Location
St Albans
It is said 769s become a little feeble on diesels at around 75 mph, and with a few extra tonnes under each end vehicle, they won't be as nimble as the straight electric class 319.
That's fairly obvious as they carry about 15 tonnes more weight yet have about 20% less power available. In my experience, it did seem OK getting to 70 and it held it for a few miles on level track where the speed limit was 70/75.
 

adc82140

Established Member
Joined
10 May 2008
Messages
3,412
But surely the weight of the diesel equipment is only the same as 200 people, who would have been crush loaded in to each carriage in the Thameslink days. They were still pretty nimble then.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,354
But surely the weight of the diesel equipment is only the same as 200 people, who would have been crush loaded in to each carriage in the Thameslink days. They were still pretty nimble then.
They don't quite have the same centre of gravity and I'm not sure they really got 200 passengers in each coach in Thameslink days, more like 150.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,354
Surely centre of gravity is irrelevant when looking at power to weight ratio?
Probably. I remember one of the early postings from 'Clarence Yard' suggesting they had chosen to put seats back in relative to their Thameslink days to help weight distribution.

https://www.railforums.co.uk/thread...ally-for-northern.138660/page-52#post-3430429

The other point about the engines being the weight of 200 passengers is that there must be a hope that they aren't going to operate empty.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,481
Location
Gomshall, Surrey
Probably. I remember one of the early postings from 'Clarence Yard' suggesting they had chosen to put seats back in relative to their Thameslink days to help weight distribution.

https://www.railforums.co.uk/thread...ally-for-northern.138660/page-52#post-3430429

The other point about the engines being the weight of 200 passengers is that there must be a hope that they aren't going to operate empty.
Empty no, but packed - probably rarely. Anyway, obviously installing diesels will add much weight and it simply has to be accepted that there is a performance penalty for bi-mode capability.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,046
Location
St Albans
But surely the weight of the diesel equipment is only the same as 200 people, who would have been crush loaded in to each carriage in the Thameslink days. They were still pretty nimble then.
I made all those points a couple of years ago, however the track standards and expectations of loads on the MML and BML where the 319 worked most of their lives are far higher than the lines that the 769s are destined for, (even the MAN to Bolton route). I think the driver here is the track access charge which NR is making for them and to be honest, the services that they are running are still viable at 75mph.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,354
I think the driver here is the track access charge which NR is making for them and to be honest, the services that they are running are still viable at 75mph.
...and indeed on GWR the relevant line speeds don't exceed 75mph (except for part of the journey between Redhill and Gatwick Airport where the higher linespeed has barely any difference on journey time).
 

DownFast

Member
Joined
30 Sep 2021
Messages
41
Location
UK
I was talking to a friend of mine today whose brother works at Reading depot. He reports that the 769s are regarded as a disaster there and some doubt whether they will enter service with GWR, with rumoured (and only rumoured) industrial action threatened around the cab design not conforming to modern standards and thus being boycotted by ASLEF members. This may be untrue and I'm more than happy to be corrected.
ASLEF DDC have yet to agree the introduction of the 769 fleet, true, and that is one of the reasons for the delay into service, but that agreement is dependent on GWR implementing various modifications to the cab (increased leg room, upgraded cab air con) that ASLEF DDC requested. Those mods are either in development or are being implemented (e.g. cab air con is being fitted at Eastleigh at the same time as the ASDO system - although some of the units now at Long Marston will need to return to Eastleigh as ASDO was fitted to them prior to the air con fitment being finalised). So to say industrial action has been threatened is probably a bit strong.

== Doublepost prevention - post automatically merged: ==

I originally though that which was reinforced by reports that they achieved 92mph on test at Loughborough, but it appears that the additional weight of the gensets and fuel in the driving cars has led NR to limit them to 75mph to which their track access charge is now probably aligned.
On the Western route, 769s can run at 100mph where permitted, but are not currently authorised to run at DMU differential speeds, which means that on the reliefs east of Reading they are pretty much restricted to 60mph (but not on the mains where the linespeed is 125 with no differential). And on the Bourne End branch the speed is mostly 10/DMU50 which means that 769s can only run at 10mph. Needless to say, this is under discussion with Network Rail.

== Doublepost prevention - post automatically merged: ==

Rumour or not, I've had the feeling for some time now that just electrifying Reading - Basing, with a low cost electrification scheme for the LTV branches would have been a much quicker solution. Keep a few Turbo's at Reading for the Gatwick's, possibly freed up by sending (if and when they ever work) the 769s to Bristol to work routes such as Severn Beach and Cardiff - Taunton where they can be kept in either Diesel or Diesel and AC mode only.
Electrifying Reading - Basingstoke has actually been briefly discussed by GWR and NR (along with the low level line and spurs east of Reading which are unelectrified despite there being DC and AC either side), although obviously it would be a long time before that actually happens. Meet AC & DC somewhere in the middle and you could run a 769 to Basingstoke without needing to start the engines. You could also run a 387...
 
Last edited:

AM9

Veteran Member
Joined
13 May 2014
Messages
16,046
Location
St Albans
Electrifying Reading - Basingstoke has actually been briefly discussed by GWR and NR (along with the low level line and spurs east of Reading which are unelectrified despite there being DC and AC either side), although obviously it would be a long time before that actually happens. Meet AC & DC somewhere in the middle and you could run a 769 to Basingstoke without needing to start the engines. You could also run a 387...
That looks interesting given the SWML/Electric Spine's indefinite delay. Even if there was an unelectrified bit in the middle,at least it would mean that the train wouldn't need to sit there with the engine idling at each end.
 

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,481
Location
Gomshall, Surrey
ASLEF DDC have yet to agree the introduction of the 769 fleet, true, and that is one of the reasons for the delay into service, but that agreement is dependent on GWR implementing various modifications to the cab (increased leg room, upgraded cab air con) that ASLEF DDC requested. Those mods are either in development or are being implemented (e.g. cab air con is being fitted at Eastleigh at the same time as the ASDO system - although some of the units now at Long Marston will need to return to Eastleigh as ASDO was fitted to them prior to the air con fitment being finalised). So to say industrial action has been threatened is probably a bit strong.

== Doublepost prevention - post automatically merged: ==


On the Western route, 769s can run at 100mph where permitted, but are not currently authorised to run at DMU differential speeds, which means that on the reliefs east of Reading they are pretty much restricted to 60mph (but not on the mains where the linespeed is 125 with no differential). And on the Bourne End branch the speed is mostly 10/DMU50 which means that 769s can only run at 10mph. Needless to say, this is under discussion with Network Rail.

== Doublepost prevention - post automatically merged: ==


Electrifying Reading - Basingstoke has actually been briefly discussed by GWR and NR (along with the low level line and spurs east of Reading which are unelectrified despite there being DC and AC either side), although obviously it would be a long time before that actually happens. Meet AC & DC somewhere in the middle and you could run a 769 to Basingstoke without needing to start the engines. You could also run a 387...
Thanks for the response and especially the emboldened point which I completely accept - as I said, it was only rumoured so it's good to have it corrected. Regarding the electrification, I can't imagine the juice rail being permitted to be extended, so presumably 25kV would have to start immediately outside Basingstoke. All pie-in-the-sky, I realise.
 

Wyrleybart

Established Member
Joined
29 Mar 2020
Messages
2,633
Location
South Staffordshire
ASLEF DDC have yet to agree the introduction of the 769 fleet, true, and that is one of the reasons for the delay into service, but that agreement is dependent on GWR implementing various modifications to the cab (increased leg room, upgraded cab air con) that ASLEF DDC requested. Those mods are either in development or are being implemented (e.g. cab air con is being fitted at Eastleigh at the same time as the ASDO system - although some of the units now at Long Marston will need to return to Eastleigh as ASDO was fitted to them prior to the air con fitment being finalised). So to say industrial action has been threatened is probably a bit strong.
Obviously not privy to any of this but I would have thought Porterbrook and the DfT would have sought inspection and approval from GWR and the DfT to prove the whole class 769 concept was financially viable. There has been millions of pounds invested by Porterbrook in Wabtec's engineering work, but before that there were visits to Wolverton etc etc. I wonder when the cab air con requirement became a necessity and how that modification and fitment was factored into the contract. Ditto the ASDO, ditto that communication gizmo on the front of the cab roof etc etc.

Presumably DfT are underwriting Network Rail's implementation of all the trackside signage relating to bi mode operations of the 769s, in the same way as the class 800/802 operattions.

I just find the whole class 319 into 769 story so amazing.
Long Marston > Wolverton > Loughborough > Burton > Reading > Eastleigh > Reading > Wolverton > Reading. Presume the same work has been done on all nineteen units at some point, but have they all been done at the same locations.
 

3973EXL

Established Member
Joined
2 Feb 2017
Messages
2,741
Last edited:

Deepgreen

Established Member
Joined
12 Jun 2013
Messages
7,481
Location
Gomshall, Surrey
Another stock failure on the NDL runs today:
Screenshot 2022-02-16 at 12.15.14.png

== Doublepost prevention - post automatically merged: ==

Obviously not privy to any of this but I would have thought Porterbrook and the DfT would have sought inspection and approval from GWR and the DfT to prove the whole class 769 concept was financially viable. There has been millions of pounds invested by Porterbrook in Wabtec's engineering work, but before that there were visits to Wolverton etc etc. I wonder when the cab air con requirement became a necessity and how that modification and fitment was factored into the contract. Ditto the ASDO, ditto that communication gizmo on the front of the cab roof etc etc.

Presumably DfT are underwriting Network Rail's implementation of all the trackside signage relating to bi mode operations of the 769s, in the same way as the class 800/802 operattions.

I just find the whole class 319 into 769 story so amazing.
Long Marston > Wolverton > Loughborough > Burton > Reading > Eastleigh > Reading > Wolverton > Reading. Presume the same work has been done on all nineteen units at some point, but have they all been done at the same locations.
Yes - whatever the internal railway industry details, the fact that users of the North Downs line have been promised these 'new', longer trains for years now is a PR failure at best. I don't know if any passengers on the route have noticed the large four zone signs on every platform (and that some of them are wrong!) but those that have must be wondering what on earth they mean! BR designed a very successful electro-diesel class in the late 1950s, which has survived in main line service to this day, but we can't sling some engines under a unit now! Yes, I know the elements involved are so much more complex now, but still...
 
Last edited:

DownFast

Member
Joined
30 Sep 2021
Messages
41
Location
UK
Basingstokes as far as Southcote Junction
And between Reading and Twyford/Maidenhead for the branches (ECS).

== Doublepost prevention - post automatically merged: ==

Another stock failure on the NDL runs today
That was 939 with multiple code 8 AWS irregularities (horn vice nothing). Probably something to do with the wrong AWS receiver being operative.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,046
Location
St Albans
And between Reading and Twyford/Maidenhead for the branches (ECS).

== Doublepost prevention - post automatically merged: ==


That was 939 with multiple code 8 AWS irregularities (horn vice nothing). Probably something to do with the wrong AWS receiver being operative.
So very little to do with it being a bi-mode multiple unit?
 

DownFast

Member
Joined
30 Sep 2021
Messages
41
Location
UK
So very little to do with it being a bi-mode multiple unit?
Possibly. 769s like 319s before them have two AWS receivers. The AWS magnets on DC electrified lines have a much stronger magnetic field to overcome the electromagnetic interference from the 3rd rail so there is an AWS receiver for DC, and another for AC & diesel. The switch from one to the other should happen as part of the power changeover procedure, but if it doesn't then the train can be running with the wrong receiver active, which can result in lots of AWS irregularities. That's just an educated guess on my part though as to what happened on 939 today.

Meanwhile, 936 failed at Guildford this afternoon with a traction motor fault, could only get as far as Wanborough on the other motor, so headed back to Guildford, and is now sat in disgrace in the sidings awaiting rescue tomorrow.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
16,046
Location
St Albans
Possibly. 769s like 319s before them have two AWS receivers. The AWS magnets on DC electrified lines have a much stronger magnetic field to overcome the electromagnetic interference from the 3rd rail so there is an AWS receiver for DC, and another for AC & diesel. The switch from one to the other should happen as part of the power changeover procedure, but if it doesn't then the train can be running with the wrong receiver active, which can result in lots of AWS irregularities. That's just an educated guess on my part though as to what happened on 939 today.

Meanwhile, 936 failed at Guildford this afternoon with a traction motor fault, could only get as far as Wanborough on the other motor, so headed back to Guildford, and is now sat in disgrace in the sidings awaiting rescue tomorrow.
There are four traction motors. Are you saying that three weren't enough?
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,530
There are four traction motors. Are you saying that three weren't enough?

I had it as traction package, not traction motor issues; don’t know if there’s perhaps been so-called chinese whispers in the news chain.
 