The CrossCountry train to Bournemouth departing 20:46 Southampton Central was moved from platform 4 to 3 one and a half minute before the departure time. What was the reason of such last minute platform change?

Such kind of change, if happens in peak hours, can create a dangerous situation as a train load of passengers rush onto the footbridge to the other platform in a minute time.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,928
Location
East Anglia
The CrossCountry train to Bournemouth departing 20:46 Southampton Central was moved from platform 4 to 3 one and a half minute before the departure time. What was the reason of such last minute platform change?

Such kind of change, if happens in peak hours, can create a dangerous situation as a train load of passengers rush onto the footbridge to the other platform in a minute time.
Can be a multitude of things. Not ideal but can’t be helped much of the time.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,510
Location
Somerset
Can be a multitude of things. Not ideal but can’t be helped much of the time.
All too often I’m now seeing last minute public announcements of things that have been obvious on the staff info screens for several minutes (train b in front of train a with no way for train a to overtake - but train a still advertised as first train, or route set into platform x but public screens still saying it’s arriving at platform y). Computers rule ok?
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,928
Location
East Anglia
All too often I’m now seeing last minute public announcements of things that have been obvious on the staff info screens for several minutes (train b in front of train a with no way for train a to overtake - but train a still advertised as first train, or route set into platform x but public screens still saying it’s arriving at platform y). Computers rule ok?
Not sure what you mean by computers rule ok. These are all controlled by human beings in control centres.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,318
The CrossCountry train to Bournemouth departing 20:46 Southampton Central was moved from platform 4 to 3 one and a half minute before the departure time. What was the reason of such last minute platform change?

Such kind of change, if happens in peak hours, can create a dangerous situation as a train load of passengers rush onto the footbridge to the other platform in a minute time.
This happens often enough to not be considered unusual, in fact some down XC trains have been booked to call at P3 anyway. IIRC it is usually done when a freight service has just run through P4, and that train is still on the down main just beyond the station or in the Millbrook area.

But you’d probably need a signaller to explain exactly why and when they decided...
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,997
Location
Airedale
This happens often enough to not be considered unusual, in fact some down XC trains have been booked to call at P3 anyway. IIRC it is usually done when a freight service has just run through P4, and that train is still on the down main just beyond the station or in the Millbrook area.
RTT has the 1549 Lawley Street to M.C.T (running slightly late) using P4 in exactly that way. The OP may have seen it.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,318
RTT has the 1549 Lawley Street to M.C.T (running slightly late) using P4 in exactly that way. The OP may have seen it.
I‘m not an expert in signalling, but will there be some sort of P4 re-occupation time limit involved here? So the signallers will have used P3 rather than have the XC being held in the tunnel until the P4 route can be set?
 

Tomnick

Established Member
Joined
10 Jun 2005
Messages
5,936
Not sure what you mean by computers rule ok. These are all controlled by human beings in control centres.
The passenger information can be controlled by human beings, but all too often at certain locations it's left to the computer to update the information itself when the description steps into the platform berth.
I‘m not an expert in signalling, but will there be some sort of P4 re-occupation time limit involved here? So the signallers will have used P3 rather than have the XC being held in the tunnel until the P4 route can be set?
There's no time limit enforced by the signalling system - the reoccupation time is a theoretical value used for planning purposes. The signalling system just needs the first train to have cleared the overlap of the signal beyond the platform (which is the basis of part of the calculation to establish the reoccupation time). It could be that the Class 4 was expected to be a bit slow getting clear of the platform, in which case giving the Class 1 a quicker run into another platform makes sense (but not if no-one's told until the last minute, so any time saved is more than balanced by time lost waiting for folk to make their way over to the other platform!).
 

185

On Moderation
Joined
29 Aug 2010
Messages
5,709
usually done when a freight service has just run through P4..
Just looked - a Freightliner did go through P4, was a minute or so late going through. Platform change will have been to keep 1O26 Manchester - Bournemouth on time, and likely a last minute change as the back end of the freight will have taken a while to trundle through whilst braking for the junction.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,318
There's no time limit enforced by the signalling system - the reoccupation time is a theoretical value used for planning purposes. The signalling system just needs the first train to have cleared the overlap of the signal beyond the platform (which is the basis of part of the calculation to establish the reoccupation time). It could be that the Class 4 was expected to be a bit slow getting clear of the platform, in which case giving the Class 1 a quicker run into another platform makes sense (but not if no-one's told until the last minute, so any time saved is more than balanced by time lost waiting for folk to make their way over to the other platform!).
Thanks for that explanation. I just looked at the Wessex timetable planning rules, (TPR), a few minutes ago, and I saw there are numerous rules listed giving the time between successive moves in the Northam Junction to Redbridge area, and for the move in question it seems to be covered by a “4 min apart” requirement.

A full length container train whether going to the Western Docks or MCT will not be moving that quickly once past the station either.
 

miklcct

Established Member
Joined
2 May 2021
Messages
5,017
Location
Cricklewood
Just looked - a Freightliner did go through P4, was a minute or so late going through. Platform change will have been to keep 1O26 Manchester - Bournemouth on time, and likely a last minute change as the back end of the freight will have taken a while to trundle through whilst braking for the junction.
Do you mean that, by the time the CrossCountry train reached the point to P3/4, the freight train hadn't cleared the overlap of the platform 4 signal yet? It was already 4 minutes after I saw the freight train passing through the station.
 

43055

Established Member
Joined
8 Mar 2018
Messages
3,695
Do you mean that, by the time the CrossCountry train reached the point to P3/4, the freight train hadn't cleared the overlap of the platform 4 signal yet? It was already 4 minutes after I saw the freight train passing through the station.
I would expect the freight to clear the overlap in the 3 mins but as it was probably slowing for going into the docks would probably not clear the pointwork for the route to be set from the platform starter signal meaning the Cross Country could arrive into 4 but might not be able to depart at 2046.

Real Time Trains shows the freight passing at 2042 and the Cross Country arriving at 2045.
 

sjm77

Member
Joined
8 Jan 2020
Messages
341
Location
Manchester
I have seen some craziness at Manchester Oxford Road, normally when two services heading towards Piccadilly are running close together. Both are planned to use Platform 4 and the situation arises where the first service is at the platform when the second service draws into Deansgate and stops at the protecting Red signal. Either a signaller or a computer switches the following service to P3 even if the first train is already in the process of departing P4. The end result is that the second train can start moving again maybe 20 seconds earlier but then sits for an extra 2 minutes whilst airport bound customers carry their luggage over the footbridge!!!!!! Just Stupid.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,040
Location
London
Larger through stations are probably the ones that have the biggest issue with this. Terminals and other locations where trains started will either a) not be boarded, or b) be obvious in good time where the alteration is.

Normally (but not always) these larger through stations have someone with localised CIS control and tannoy capability and someone staffed to give out local information like this. However they are not always there 24/7 or may be occupied with other tasks. This will be when you get the automated "this is a platform alteration...".
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,331
By increasing passenger delay (if they don't make it) and aggravation (whether they do or not)...
Agree that it can often be a sub-optimal experience from a passenger's point of view, but this is the railway that we're talking about, where operational convenience and minimizing delay minutes invariably seem to be key! :(
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
2,657
Location
Rochdale
I have seen some craziness at Manchester Oxford Road, normally when two services heading towards Piccadilly are running close together. Both are planned to use Platform 4 and the situation arises where the first service is at the platform when the second service draws into Deansgate and stops at the protecting Red signal. Either a signaller or a computer switches the following service to P3 even if the first train is already in the process of departing P4. The end result is that the second train can start moving again maybe 20 seconds earlier but then sits for an extra 2 minutes whilst airport bound customers carry their luggage over the footbridge!!!!!! Just Stupid.

No doubt there's two other trains behind those stitching up Castlefield Junction, Oxford Rd isn't really a very user friendly station for signalers or passengers
 

sjm77

Member
Joined
8 Jan 2020
Messages
341
Location
Manchester
No doubt there's two other trains behind those stitching up Castlefield Junction, Oxford Rd isn't really a very user friendly station for signalers or passengers
Yes and normally it is EMT stopped outside my apartment at XX:35 in the hours they still provide a service from Liverpool! Until we have P15/16 at Piccadilly extremely short notice platform changes at Oxford Road like I describe achieve nothing but annoying customers.
 

jfollows

Established Member
Joined
26 Feb 2011
Messages
10,181
Location
Wilmslow
I have seen some craziness at Manchester Oxford Road, normally when two services heading towards Piccadilly are running close together. Both are planned to use Platform 4 and the situation arises where the first service is at the platform when the second service draws into Deansgate and stops at the protecting Red signal. Either a signaller or a computer switches the following service to P3 even if the first train is already in the process of departing P4. The end result is that the second train can start moving again maybe 20 seconds earlier but then sits for an extra 2 minutes whilst airport bound customers carry their luggage over the footbridge!!!!!! Just Stupid.
I've had it worse than that - no train on platform 4, late evening, I sat underneath the display indicating next train to Wilmslow for about 15 minutes, then at the absolute last minute as the train was approaching it was switched to platform 3. By the time I was hurrying down the stairs to platform 3 there was a tide of people heading up the stairs having just got off the train. I can't run, walking is OK, and I made it, just, but it was stupid and annoying. As I say, when it happened to me there was no other train in the station and there hadn't been a recent departure for Piccadilly either.
 

181

Member
Joined
12 Feb 2013
Messages
945
All too often I’m now seeing last minute public announcements of things that have been obvious on the staff info screens for several minutes (train b in front of train a with no way for train a to overtake - but train a still advertised as first train, or route set into platform x but public screens still saying it’s arriving at platform y).

The passenger information can be controlled by human beings, but all too often at certain locations it's left to the computer to update the information itself when the description steps into the platform berth.

Normally (but not always) these larger through stations have someone with localised CIS control and tannoy capability and someone staffed to give out local information like this. However they are not always there 24/7 or may be occupied with other tasks. This will be when you get the automated "this is a platform alteration...".

Maybe I'm misundertanding something, but could the announcement be made automatically when the route is set? -- that would give passengers a bit more warning without the need for a staff member to intervene. When I was at Reading thisafternoon, the announcement of platform 9 for the 15.27 for Bristol was still playing when I could see the train diverging from the platfom 9 line and heading for platform 8. In this case it didn't matter much as 8 and 9 are opposite sides of the same island, but it still seems daft to announce a train on one platform when the signalling system 'knows' that it won't be using that platform, and even more so when it's physically impossible for it to reach that platform and it can be seen about to enter a different one.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,040
Location
London
Maybe I'm misundertanding something, but could the announcement be made automatically when the route is set? -- that would give passengers a bit more warning without the need for a staff member to intervene. When I was at Reading thisafternoon, the announcement of platform 9 for the 15.27 for Bristol was still playing when I could see the train diverging from the platfom 9 line and heading for platform 8. In this case it didn't matter much as 8 and 9 are opposite sides of the same island, but it still seems daft to announce a train on one platform when the signalling system 'knows' that it won't be using that platform, and even more so when it's physically impossible for it to reach that platform and it can be seen about to enter a different one.

The trigger will come from the berth being triggered to confirm a platform. The CIS software is not smart enough to understand anything more, nor is it linked it to the signalling system (besides the basics of berths and rudimentary automatic delay prediction).
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,615
Maybe I'm misundertanding something, but could the announcement be made automatically when the route is set? -- that would give passengers a bit more warning without the need for a staff member to intervene. When I was at Reading thisafternoon, the announcement of platform 9 for the 15.27 for Bristol was still playing when I could see the train diverging from the platfom 9 line and heading for platform 8. In this case it didn't matter much as 8 and 9 are opposite sides of the same island, but it still seems daft to announce a train on one platform when the signalling system 'knows' that it won't be using that platform, and even more so when it's physically impossible for it to reach that platform and it can be seen about to enter a different one.

The trigger will come from the berth being triggered to confirm a platform. The CIS software is not smart enough to understand anything more, nor is it linked it to the signalling system (besides the basics of berths and rudimentary automatic delay prediction).

ATOS systems don't do this, but KeTech ones do (only where the data from the signalling system shows this detail clearly!)
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,562
Location
UK
Routes can be set without the protecting signal being cleared. Wouldn't both be required before any announcement is made ?
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,040
Location
London
Routes can be set without the protecting signal being cleared. Wouldn't both be required before any announcement is made ?

I suppose it depends. There’s a very low chance of the route / signal being put back but any operator looking at CCF / TMIS or other live railway map will take that as correct. Also some conscientious signallers might give the local control room / supervisor / staff a call “Just a heads up 1A00 will be going up Platform 3 now”

== Doublepost prevention - post automatically merged: ==

ATOS systems don't do this, but KeTech ones do (only where the data from the signalling system shows this detail clearly!)

Well that is part of the problem I suppose too!
 

louis97

Established Member
Joined
14 May 2008
Messages
2,154
Location
Derby
ATOS systems don't do this
It can do it though, I know of at least one TOC that used it but had to disabled it because of its unreliability - not really a huge surprise to me.

I suspect its a step too far in the knowledge required to set it up correctly.
 

greaterwest

Established Member
Joined
23 Nov 2014
Messages
1,619
ATOS systems don't do this, but KeTech ones do (only where the data from the signalling system shows this detail clearly!)
I also assure you the Amey system currently only in use with London Overground but previously SWR, Southern and FGW (as they were) to name a few can also do this reliably.
 
Status