Deepgreen
Established Member
Looks like today's North Downs runs aren't happening, at least going by RTT.
Didn't appear to happen on Monday either.Looks like today's North Downs runs aren't happening, at least going by RTT.
RTT has "due to a problem with the train" today!Didn't appear to happen on Monday either.
769939 has failed on depot.RTT has "due to a problem with the train" today!
Do you mean you think changing on the move is off the agenda generally, or just Redhill to Reigate?Apologies if reported previously but power c/o signs have appeared at Redhill. 750V to Gatwick Diesel to Guilford need to check full wording as was on a train.
Guess they want diesel proved before departure not even risking it at Reigate. Guess changing over on the move is off the agenda for the time being. Mind you just getting them introduced would be progress.
Take another look. The sign I saw shows 750v electric to both Gatwick and Reigate. The diesel indicator is shown for moves to Redhill Loco Sidings which aren't electrified.Apologies if reported previously but power c/o signs have appeared at Redhill. 750V to Gatwick Diesel to Guilford need to check full wording as was on a train.
Guess they want diesel proved before departure not even risking it at Reigate. Guess changing over on the move is off the agenda for the time being. Mind you just getting them introduced would be progress.
Planned delivery dates to Reading TCD:So we now have only four sets left to be delivered from Wolverton or Burton by my count:
769 923
769 935
769 944
769 947
Yes, diesel for the Loco Sidings - not that one has been in there yet, but that's planned to happen some time soon for route proving.Take another look. The sign I saw shows 750v electric to both Gatwick and Reigate. The diesel indicator is shown for moves to Redhill Loco Sidings which aren't electrified.
I think the test runs have been changing over without stopping (within the agreed decisions about where that would happen).
Could they add 750dc to the loco sidings in future or is there an operational reason why these sidings can’t be electrified?Yes, diesel for the Loco Sidings - not that one has been in there yet, but that's planned to happen some time soon for route proving.
When did these move to Long Marston - my last records have them as being at Reading?The rest of the fleet:
928/930/938/943/959 at Long Marston
OK thanks for clarity they caught my eye as I was running in on a 700 and as they looked sparkly surmised they were newishTake another look. The sign I saw shows 750v electric to both Gatwick and Reigate. The diesel indicator is shown for moves to Redhill Loco Sidings which aren't electrified.
I think the test runs have been changing over without stopping (within the agreed decisions about where that would happen).
938 - 28 January 2022When did these move to Long Marston - my last records have them as being at Reading?
The diesel indicator is shown for moves to Redhill Loco Sidings which aren't electrified.
As has been discussed before, getting it to run to Guildford and run back to Reading empty would be a start. It doesn't need to run to Redhill or Gatwick. Wasn't it explained as being more of a traincrew issue than an issue with stabling?I would be nice if Network Rail at long last fixed the sidings issue at Redhill so more than one GWR unit can be stabled overnight, as that would enable the 22:34 M-Sa departure from Reading to be restored to the timetable. Months ago, I asked if there was a plan to fix this. Still waiting for an answer ....
As has been discussed before, getting it to run to Guildford and run back to Reading empty would be a start. It doesn't need to run to Redhill or Gatwick. Wasn't it explained as being more of a traincrew issue than an issue with stabling?
2 units can stable in Redhill Loco, and have been able to since April 2021 - and it has been used as such on several occasions since then.
The 3rd siding in there remains out of use.
I don’t believe the 2234 not running has ever been anything todo with siding capacity - as I recall it ran pre COVID at the start of the Dec 2019 timetable when everything was stabling up the station. More likely it’s part of COVID service reductions, which were then rolled over by DfT for whatever we’re meant to be calling the current service specification.
5Q74 dep 1034STP 11/02 1042 Wolverton - Reading
https://www.realtimetrains.co.uk/service/gb-nr:K06182/2022-02-11/detailed
0H70 ex Derby 57312
Planned delivery dates to Reading TCD:
935 11th Feb
923 18th Feb
947 28th Feb
944 4th March
Planned delivery dates to Reading TCD:
935 11th Feb
923 18th Feb
947 28th Feb
944 4th March
The rest of the fleet:
928/930/938/943/959 at Long Marston
922/925/932 at Eastleigh for ASDO/Air con fitment
927/936/937/939/940/946/949 at Reading/Oxford
5Q74 dep 1034
Its funny how a train running on BR since 1986 can suddenly be a problem, a bit like the old can't drive that class 387 it's a different colour dispute a few years ago!I was talking to a friend of mine today whose brother works at Reading depot. He reports that the 769s are regarded as a disaster there and some doubt whether they will enter service with GWR, with rumoured (and only rumoured) industrial action threatened around the cab design not conforming to modern standards and thus being boycotted by ASLEF members. This may be untrue and I'm more than happy to be corrected. I live on the NDL and really hope they do run in service, and successfully, but I am not filled with confidence. BTW, I was at Dorking West station today and the incorrectly-applied four coach zones (1-4) markings on the EB platform are still wrong (reversed) after around a year in situ.
That is kind of irrelevant if standards have moved on since 1986 and the trains themselves have been withdrawn from use elsewhere.Its funny how a train running on BR since 1986 can suddenly be a problem
Yes, I think the debate would probably be about whether the train is considered to have been altered enough to count as 'new' or not. I would have expected the unions to have been consulted and also wonder what the situation is regarding other class 769 operators. However, as I mentioned, there may not be an issue brewing in this regard anyway, so I am regarding it as hearsay at present.That is kind of irrelevant if standards have moved on since 1986 and the trains themselves have been withdrawn from use elsewhere.
There is no obvious reason 769s would work in the west any better than they would in the LTV region, nor that the staff would welcome them. They don't have the speed (Cardiff to Taunton) or nimbleness (Severn Beach) that the routes around Bristol need. At least the relevant routes from Reading are all under 75mph.Keep a few Turbo's at Reading for the Gatwick's, possibly freed up by sending (if and when they ever work) the 769s to Bristol to work routes such as Severn Beach and Cardiff - Taunton where they can be kept in either Diesel or Diesel and AC mode only.
the 769s to Bristol to work routes such as Severn Beach and Cardiff - Taunton where they can be kept in either Diesel or Diesel and AC mode only.
There is no obvious reason 769s would work in the west any better than they would in the LTV region, nor that the staff would welcome them. They don't have the speed (Cardiff to Taunton) or nimbleness (Severn Beach) that the routes around Bristol need. At least the relevant routes from Reading are all under 75mph.