But… there will always be winners and losers. one of the reasons the railway is in the state it is is that the politicians want there to be ‘no bad news’.

For what it’s worth, given traffic levels Leicester to each of Derby and Nottingham, hourly is probably enough. There is also the opportunity to change at EMP To give more connected frequency (similar to how you get from Bedford to Leicester via Kettering.)
I think it's quite proper and correct to point out that services for some journeys between large, nearby cities in the 2040s may well be significantly inferior to in the 2010s, and question it. When government presents their plans as better and tries to hide the risks and disbenifits deep in a later publication, all the more so people should see that and come to their own conclusions.

Obviously, whether that tips the equation on the overall package, we cannot easily say from this vantage, especially because there's all sorts of other implications for capacity.

However, if I were forced to come to a view, my view would be that the full Y had a perfectly adequate business case, albeit not perhaps a 'bombastic' one, and that in time this network will prove to contain such compromises that it won't produce a better one.

Also, the demand profile for Bedford to Leicester is not similar to Nottingham to Leicester, and I think you know it ;)
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,786
But then the UCR recommended the Golbourne link should be extended further potentially to somewhere just south of Preston with further improvements north to reduce the journey time between London and Glasgow to 3 hours

extending the link to just south of Preston won’t deliver Glasgow in 3 hours. It would deliver 3h30, at a guess.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,270
Location
Bolton
Well as Starmill says - something is wrong with the website. The Dft homepage says updated January 24 2022 - but I am still searching.
Which document did that chart of potential services come from, please? Seems to show a serious curtailment of services from Grantham and Newark ....
I've found a link that appears to actually work: https://assets.publishing.service.g...gic-alternatives-to-high-speed-2-phase-2b.pdf

Edit: I think that this is the same link that GRALISTAIR has edited in above. Looks like some errors have crept in on the gov.uk site today.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,786
Also, the demand profile for Bedford to Leicester is not similar to Nottingham to Leicester, and I think you know it ;)

oh I quite agree, but then there are only two direct trains a day from Bedford to Leicester, and the last one of those is at 0711 :)

also, in the southbound direction, the 2tph frequency from both Nottingham and Derby to Leicester isn’t half hourly but something like 22/38.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,270
Location
Bolton
also, in the southbound direction, the 2tph frequency from both Nottingham and Derby
It is indeed slightly poorer yes. But it's probably exceedingly tricky to serve Loughborough (another important traffic driver that really shouldn't be 'going without') properly without that creeping in. Perhaps we should be looking at building a new line for London to Sheffield traffic so this is no longer such an issue? ;)
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,270
Location
Bolton
Which document did that chart of potential services come from, please? Seems to show a serious curtailment of services from Grantham and Newark ....
For what it's worth, I think there's probably an error in it and there should be a spot on the Hull service at Doncaster. So Newark North Gate could at least retain a two-hourly service to Doncaster. It's still pretty poor though along with hourly to London.

Grantham does a little bit better with 2tph to London and retention of an hourly through service to York.
 

RSimons

Member
Joined
15 Dec 2016
Messages
62
Location
Alberta
Marsden seems a peculiar destination for a high speed rail link. Have I missed something? How is the line supposed to get there and what happens next?
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,332
Location
Nottingham
Marsden seems a peculiar destination for a high speed rail link. Have I missed something? How is the line supposed to get there and what happens next?
As I understand it, the new line will provide effectively four tracks from Manchester Piccadilly to the Eastern end of the Standedge Tunnel (i.e. Marsden), merging into a combination of three and four tracks through Huddersfield nearly to Leeds; and then some sort of pixie dust to reconfigure the Western Approaches to Leeds station, still to be worked out.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,332
Location
Nottingham
So Newark North Gate could at least retain a two-hourly service to Doncaster. It's still pretty poor though along with hourly to London.
I wonder how long before the good people of Newark realise that they are going to lose their twice hourly connections to York and beyond?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
I've found a link that appears to actually work: https://assets.publishing.service.g...gic-alternatives-to-high-speed-2-phase-2b.pdf

Edit: I think that this is the same link that GRALISTAIR has edited in above. Looks like some errors have crept in on the gov.uk site today.
I think this is the Technical Annex that goes with the IRP.
It seems to be technical in a strategic and financial sense, rather than railway-technical.

 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,786
Are you revealing some inside knowledge there? There have also been some suggestions of routes at least partially on the surface.

underground knowledge ;)

A quick look at a map shows that it has to be in tunnel, simply to avoid suburban Manchester and then very difficult topography the rest of the way. It might pop up for air in a couple of places I suppose. I could be wrong, but I doubt it. I wonder how many TBMs it will need. Lots, I imagine.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,332
Location
Nottingham
My guess is 4 tracking to Guide Bridge, then tunnel to Marsden, coming up for air around Greensill where there is an old alignment across the valley, which is not all built on. EDIT: I meant Greenfield of course

They have to tunnel to get across Standedge
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,786
My guess is 4 tracking to Guide Bridge, then tunnel to Marsden, coming up for air around Greensill where there is an old alignment across the valley, which is not all built on.

They have to tunnel to get across Standedge

V unlikely that a line alongside the existing to (and via) Guide Bridge can meet the journey times. It needs to be much straighter (and shorter). Also nowhere obvious for a portal at Guide Bridge.
 

Revaulx

Member
Joined
17 Sep 2019
Messages
526
Location
Saddleworth
My guess is 4 tracking to Guide Bridge, then tunnel to Marsden, coming up for air around Greensill where there is an old alignment across The Valley , which is not all built on.

They have to tunnel to get across Standedge
Greenfield?

That’ll be tricky. Best to have it in tunnel all the way to Marsden. The Saddleworth valleys are pretty built up these days.
 

Nottingham59

Established Member
Joined
10 Dec 2019
Messages
3,332
Location
Nottingham
V unlikely that a line alongside the existing to (and via) Guide Bridge can meet the journey times. It needs to be much straighter (and shorter). Also nowhere obvious for a portal at Guide Bridge.
OK. If it's tunnel effectively all the way then, then that makes it a Pennine Base Tunnel.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,786
OK. If it's tunnel effectively all the way then, then that makes it a Pennine Base Tunnel.

not really, seeing as it will emerge at Marsden at around 500feet above sea level!

== Doublepost prevention - post automatically merged: ==

How much mor expensive would a under ground station in Manchester be? Is there a rough estimate?

I think there has but I’ve never seen it. Safe to say it would be something like an extra £5bn, and a certain decade longer on the delivery date. And all because a few people can’t get their heads round trains reversing.
 

ohgoditsjames

Member
Joined
16 Jun 2019
Messages
384
Location
Sheffield & Shipley
not really, seeing as it will emerge at Marsden at around 500feet above sea level!

== Doublepost prevention - post automatically merged: ==



I think there has but I’ve never seen it. Safe to say it would be something like an extra £5bn, and a certain decade longer on the delivery date. And all because a few people can’t get their heads round trains reversing.
£5 billion which would be better spent elsewhere (Leeds to Sheffield section of HS2 for example).
 

g22

Member
Joined
5 May 2014
Messages
95
But… there will always be winners and losers. one of the reasons the railway is in the state it is is that the politicians want there to be ‘no bad news’.

For what it’s worth, given traffic levels Leicester to each of Derby and Nottingham, hourly is probably enough. There is also the opportunity to change at EMP To give more connected frequency (similar to how you get from Bedford to Leicester via Kettering.)

Seriously. To compare Leicester/Nottingham with Bedford/Leicester. The last time any figures were published there were 570,000 journeys between Leicester and Nottingham (total both ways) per annum. Leicester and Bedford 26,000 per annum. Obviously Covid will have changed things for now, but that applies anywhere.
People doing a large volume local journey between the two largest cities in the East Midlands really shouldn't have a service partly based around changing trains. Surely there needs to be a stand alone Leicester /Nottingham in the opposite half hour to supplement, and I don't mean the stopping service on the slow lines.
 
Last edited:

RSimons

Member
Joined
15 Dec 2016
Messages
62
Location
Alberta
Thanks for the info about Marsden. I knew there was discussion about a new line, largely in tunnel, from Manchester to Yorkshire but I thought it was mainly wishful thinking and not even close to being included in official plans.
 

deltic

Established Member
Joined
8 Feb 2010
Messages
3,716
I wonder how long before the good people of Newark realise that they are going to lose their twice hourly connections to York and beyond?
As its a theoretical timetable for around 20 years hence I dont think anyone will care.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,649
Location
Nottingham
For Leicester-Nottingham I wonder if they plan to upgrade the slow service to semi-fast and create a new stopper that would go to Toton then on to Mansfield. By using the High Level lines this wouldn’t add to congestion at Trent. Apologies if the document already comments on this, only on a phone and can’t easily read it.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,915
Location
Mold, Clwyd
V unlikely that a line alongside the existing to (and via) Guide Bridge can meet the journey times. It needs to be much straighter (and shorter). Also nowhere obvious for a portal at Guide Bridge.
Piccadilly to Marsden is 30 km in a straight line, from Guide Bridge it's 20 km.
If we can contemplate a 30 km tunnel* I wouldn't have thought it mattered cost- or time-wise whether the Piccadilly end was on the surface or underground.

* similar length to the Guadarrama tunnel north of Madrid
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Thanks for the info about Marsden. I knew there was discussion about a new line, largely in tunnel, from Manchester to Yorkshire but I thought it was mainly wishful thinking and not even close to being included in official plans.
It was in the Integrated Rail Plan for the Midlands and North published in November that there will be a new line from Manchester (immediately east of Piccadilly High Speed) to Yorkshire (though it didn't explicitly say in tunnel). There were strong hints that it will only just reach into Yorkshire. This leaves it unclear how much 3- or 4-tracking there will be between the end of this line and Huddersfield. There is another proposal, for which a decision is awaited on the recently completed public inquiry, for a new pair of fast lines from Hudds to just beyond Ravensthorpe. So the capacity concerns remaining are Marsden to Hudds, Ravensthorpe to Leeds, Leeds station, and east of Leeds.
 

Roast Veg

Established Member
Joined
28 Oct 2016
Messages
2,320
Government publications must be like buses - no clues about the IRP for months on end, then a bunch of documents with conflicting information (maps mostly) all at once.
 