• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

GWR at West Drayton station

Status
Not open for further replies.

j_walker1804

Member
Joined
11 Jul 2016
Messages
52
Location
Zone 6
Hi everyone,
So this morning I was awaiting the 0353 service to Slough which on the screens was showing as departing from P1 (Down Fast) which isn’t unusual at night. The screens on P1 were showing the departure as expected.

At 0352 the train comes around the corner and the screens then show its departing from P3 (usual platform).

As expected, I wasn’t able to go down the stairs, through the underpass, up the stairs and across 3 lines to get the P3 in the minutes notice that they gave for the platform change and I now find myself in an Uber to get to my destination.

Apart from contacting GWR for a moan, does anyone know where I stand with a refund for the Uber fare?

Apologies if this is in the wrong part of the forum - please move it to the correct part.

Many thanks,
J
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
The train was on a different platform due to emergency engineering works so trains had to run on the Relief, not the Main lines as they usually do overnight. I am surprised this had not been shown in advance. This was probably an automatic berth "this is a platform alteration" instead of being amended in advance by a CIS operator.

I think it would be worth a comment to customer services as technically Delay Repay wouldn't apply. Where was the Uber too? West Drayton to Slough?
 

j_walker1804

Member
Joined
11 Jul 2016
Messages
52
Location
Zone 6
The train was on a different platform due to emergency engineering works so trains had to run on the Relief, not the Main lines as they usually do overnight. I am surprised this had not been shown in advance. This was probably an automatic berth "this is a platform alteration" instead of being amended in advance by a CIS operator.

I think it would be worth a comment to customer services as technically Delay Repay wouldn't apply. Where was the Uber too? West Drayton to Slough?
Yes the screens were showing P1 on the screens in the underpass and also on P1 itself (as it was all unlocked and open)

Uber was West Drayton to Slough.
I’ve tweeted GWR and they’ve told me to contact MTR (whoever they are?)
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
Yes the screens were showing P1 on the screens in the underpass and also on P1 itself (as it was all unlocked and open)

Uber was West Drayton to Slough.
I’ve tweeted GWR and they’ve told me to contact MTR (whoever they are?)

Yes West Drayton is operated by MTR (TfL Rail) now.
 

iphone76

Member
Joined
6 Nov 2010
Messages
988
Location
South Essex
Not that you should have to, but you can use signal maps to track your train on the approach to the station. It should give you a bit more notice of any last minute platform changes. It seemed this service had a platform change after Hayes.

 

357

Established Member
Joined
12 Nov 2018
Messages
2,282
Most regular users of the line have little to no confidence in some of the people who are responsible for updating the MTR screens...
 

Attachments

  • PSX_20220117_074016.jpg
    PSX_20220117_074016.jpg
    680.3 KB · Views: 270

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
Surely it's GwRs control is responsible for ensuring the information for it's services is accurate on the Passenger information screens . The boards at stations pull the data from automated data sources . Which are provided by the toc running the trains. Unless the board failed completely I cannot see how it would be MTRs fault
 

skyhigh

Established Member
Joined
14 Sep 2014
Messages
6,842
Surely it's GwRs control is responsible for ensuring the information for it's services is accurate on the Passenger information screens . The boards at stations pull the data from automated data sources . Which are provided by the toc running the trains. Unless the board failed completely I cannot see how it would be MTRs fault
The screens are the responsibility of whoever manages the station, which in this case is MTR. I would be very surprised if GWR control could alter the screens of another operator.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
The screens are the responsibility of whoever manages the station, which in this case is MTR. I would be very surprised if GWR control could alter the screens of another operator.
They enter the service information however which the platform information screens pull their data from. The information isn't manually entered
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
They enter the service information however which the platform information screens pull their data from. The information isn't manually entered

As stated before the train was booked to be on those platforms but was altered. The information can be manually altered should there be a need to.
 
Last edited:

JN114

Established Member
Joined
28 Jun 2005
Messages
3,522
There is no facility for GWR Control to advertise on-the-day platform alterations at TfL (or other TOC) -managed stations.
 

STINT47

Member
Joined
16 Aug 2020
Messages
860
Location
Nottingham
The best thing to do in futuer when at the station is access the relevant map on open train times. This would have shown that the train was using the relief line in advance.

I ver rarely look at departure screens any more as sites like these and similar provides more detailed and often more accurate earlier information than screens and sometimes even staff.
 

357

Established Member
Joined
12 Nov 2018
Messages
2,282
The best thing to do in futuer when at the station is access the relevant map on open train times. This would have shown that the train was using the relief line in advance.

I ver rarely look at departure screens any more as sites like these and similar provides more detailed and often more accurate earlier information than screens and sometimes even staff.
And this is exactly why so many regular passengers think of the railway in the way that they do.

I know many instances of a platform alteration only being announced when the train is in the platform berth, but it was physically impossible to access the booked platform on the booked line for the last 15 minutes.

It shouldn't be required for normal people to know how to use a train map in order to not miss their train...
 

ChewChewTrain

Member
Joined
27 Jun 2019
Messages
355
I find the “Train Times” app to be very quick to use when time is short. It says it uses the National Rail Enquiries API; would the platform change likely have been shown in good time in that?
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
And this is exactly why so many regular passengers think of the railway in the way that they do.

I know many instances of a platform alteration only being announced when the train is in the platform berth, but it was physically impossible to access the booked platform on the booked line for the last 15 minutes.

It shouldn't be required for normal people to know how to use a train map in order to not miss their train...

Indeed. The railway should do better that this and be more proactive. All this talk of using RTT or OpenTrainMaps is irrelevant - there is customer information at the station that should be doing the job.

As a railway colleague I am often infuriated by other colleagues that seem completely oblivious; such as the platform gates not open on a mainline platform due to a platform alteration and subsequent delays whilst people scramble across.
 

357

Established Member
Joined
12 Nov 2018
Messages
2,282
As a railway colleague I am often infuriated by other colleagues that seem completely oblivious; such as the platform gates not open on a mainline platform due to a platform alteration and subsequent delays whilst people scramble across.
That's if there are any staff there to open them...!

On the GEML they installed all these gates, then had to install handles and signs advising how to open them in case a train was diverted onto the mainline!:rolleyes:
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,609
As I understand it this information is specifically MTR Crossrail's responsibility, however as it was a GWR service, GWR did have the ability to amend the advertised platform number.

In a wider sense this is a case of the failings of ATOS. Their CIS system only amends a platform when the service in question arrives in the platform berth, whereas, for instance, KeTech's system alters the platform when the service has an ARS route set into the platform. This would likely have given sufficient warning for the OP to get to the amended platform and catch the train in question.
 

CyrusWuff

Established Member
Joined
20 May 2013
Messages
5,427
Location
London
In a wider sense this is a case of the failings of ATOS. Their CIS system only amends a platform when the service in question arrives in the platform berth, whereas, for instance, KeTech's system alters the platform when the service has an ARS route set into the platform. This would likely have given sufficient warning for the OP to get to the amended platform and catch the train in question.
Regardless of the system in use, it should be possible to manually change the platform number. This does, of course, rely on there being a CIS operator on duty and them realising the need to intervene.

Of course, in an ideal world, the system would pick up such changes automatically, and cascade them down the line once the train passes the last point at which it could cross back to the booked platform.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
Regardless of the system in use, it should be possible to manually change the platform number. This does, of course, rely on there being a CIS operator on duty and them realising the need to intervene.

Of course, in an ideal world, the system would pick up such changes automatically, and cascade them down the line once the train passes the last point at which it could cross back to the booked platform.
Or for a csa to make a verbal announcement. I can't comment on West Drayton but they are usually prettily proactive at Hayes letting people know to move to an alternative platform when there is planned engineering works. This was unplanned though.
 

JN114

Established Member
Joined
28 Jun 2005
Messages
3,522
However as it was a GWR service, GWR did have the ability to amend the advertised platform number.

I will again, categorically state there is no facility for GWR to amend platforms at a non-GWR station.

Of course, in an ideal world, the system would pick up such changes automatically, and cascade them down the line once the train passes the last point at which it could cross back to the booked platform

There are 4 platforms at West Drayton a down train can use - 1, 3, 4 and 5.

While the point of no return for Platform 1 is several signal sections before the station; it can be any of 3/4/5 right up until immediately east of the station, so it is only ever going to switch at the last minute. It can’t go earlier because it wouldn’t know which of unbooked 3/4/5 to change to at the point it left the mains. It would be better if the system was tied to route setting as well, that would give more notice; but I don’t believe it is.

The only way the OP would have had more notice would have been if TfL Rail’s CIS operators made a manual change - given the mains were closed for emergency engineering work, affecting theirs and GWRs trains - it’s a bit poor IMO that they didn’t go through and change them all proactively given it was known trains couldn’t call at 1 - but I don’t know what their workload situation was so shouldn’t judge.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
I wonder if the station was staffed at 3:45 the only staff I have seen during night trains have been contractor security guards who definitely won't be making announcements or or changing cis.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
10,942
Location
London
Or for a csa to make a verbal announcement. I can't comment on West Drayton but they are usually prettily proactive at Hayes letting people know to move to an alternative platform when there is planned engineering works. This was unplanned though.

At 0400 in the morning? Also, at several locations, announcements won't be programmed to work at those hours (or at significantly reduced volumes), to prevent noise nuisance to the local area.
 

Paul Kelly

Verified Rep - BR Fares
Joined
16 Apr 2010
Messages
4,224
Location
Reading
Isn't the recent redesign of West Drayton station an important factor here? It probably would have been possible to get from Platform 1 to Platform 3 in the time available, before the recent changes (a quick nip through the underpass). TfL Rail have (I presume) decided to save costs by not extending the new bridge to Platform 1, meaning it is cut off from the rest of the station and it could now easily take 3-4 minutes (walking at a brisk pace!) to get from Platform 1 to Platform 3, whereas previously 30 seconds would have sufficed. It looks like some of the cost savings from not extending the new bridge to Platform 1 need to be reallocated to having additional staff to update screens and/or make announcements...

Edit: it would also be interesting to know at what point Tom Cairns' logic in RealTimeTrains predicted that the train would depart from platform 3; it could potentially be a great argument against the "one true source" theory regarding passenger information that is promulgated by National Rail Enquiries.

Edit 2: I see my second point has already been addressed by IanXC above, who pointed out a shortcoming of the Worldine information screen system.
 
Last edited:

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,609
I will again, categorically state there is no facility for GWR to amend platforms at a non-GWR station.

The national agreements surrounding this data allow for a TOC to amend the platform number for any train which calls at a station they manage regardless of train operator, and any platform number for a train operated by the TOC at any location. It may be that the systems GWR staff have access to do not allow this, but that doesn't mean that GWR are prevented, as an organisation, from doing so.
 

philthetube

Established Member
Joined
5 Jan 2016
Messages
4,159
As I understand it this information is specifically MTR Crossrail's responsibility, however as it was a GWR service, GWR did have the ability to amend the advertised platform number.

In a wider sense this is a case of the failings of ATOS. Their CIS system only amends a platform when the service in question arrives in the platform berth, whereas, for instance, KeTech's system alters the platform when the service has an ARS route set into the platform. This would likely have given sufficient warning for the OP to get to the amended platform and catch the train in question.
Mtr Crossrail may be tasked to provide the information but it is GWR's responsibility to ensure that correct info is provided and to sort out the problems caused and then to get their pound of flesh from Crossrail.


the service was bought from GTR, they bear the responsibility to ensure that this is correctly provided.
 
Status