I do think it's a shame that they were always so unhappy about 33s being away from the Southern and didn't shift some of them to use on the kind of general-service duties the 31/4s ended up getting used on. The performance difference seemed out of all proportion to the difference on paper in engine output.
But that's exactly what happened, with class 33 operation extended to Milford Haven and Manchester.
It is quite difficult to do a direct comparison of class 31/4 and class 33 because they rarely worked the same trains, Bristol-Cardiff is one route where someone might have some decent data, rather than basing assertions on anecdotes.
Class 33 ETH was rudimentary, tapped off the main generator, the technology available at the time, and ETH index was 48. It was only designed for Mark Is but could be used on newer stock up to Mark IId, broadly the same restrictions as a Deltic. So class 33s were never called upon to work long trains of aircon stock, apart from odd occasions on the Poole-Newcastle. And in the period when class 33s worked the Waterloo-Exeters the trains were booked load 9 in summer but reduced to load 8 in winter so that timings could be maintained with the ETH on. They were not an ETH loco with operational flexibility like the class 31/4.
What turned out to be a big advantage for the class 33 was that it was built ETH only so never had to carry around a boiler and a tankful of water.
