Internally at ScotRail for example there's frustration that there's a summer market on the Kyle line that's going untapped, while units and crews are sent instead to work on the Far North where practically no such development opportunity exists. Inverness - Tain by train and connections by bus Tain - Wick - Thurso would actually be quicker all year around of course, and combining the resources of the current train and bus operations would generate much better service for local people. I'm yet sure many would campaign against it.
A refusal to countenance any closures could therefore be said to be actively damaging the parts of the railway that are open and have potential to be much more than they are today, such as the Kyle line. This pattern is very similar across other areas of the country, I'm not picking on the Far North by itself.
Oh, we're not doing
this again, are we? There's a lot of nuance in this particular case that gets ignored: the afterburn of a period of systematic unreliability circa 2014-17 caused by excessive single-line stretches and then-continuous crewing issues at Wick; the fact that the train actually beats the bus to Thurso at present yet the existence of a transport alternative is used a stick to beat the line with rather than an indication of untapped passenger flows; the tourist potential of the route for both scenery (it rivals Kyle) and for being the northernmost railway, taking you close to John o' Groats and paralleling the North Coast 500 - it's basically an Instagram post, so why aren't we putting it out there on social media? - and the existence at Thurso of a ferry link that adds to the line's patronage (pre-covid, it wasn't uncommon for the early southbound to be full up out of Thurso). It also has more freight potential than Kyle - timber extraction for instance - and does actually serve greater population
north of Tain than Kyle does after branching away at Dingwall. These are objective truths, rather an appeal to sentiment - but they're being
expressed with feeling, and that isn't allowed. It's in our national psyche, the old tendency to equate emotiveness to irrationality. If you're passionate, it undermines your argument, a marker of excessive sensitivity in discourse. Only the stiffest of upper lips will do. Which is odd, because I think that, perversely, the real reason why the Far North Line tends to cop a lot of flak on here is caused less by its imperfections, but is due more to what it represents to the would-be rationalisers. And the clue is in the name.
I maintain that you will get value out of some modest improvements. A loop at Lentran would be massive for reliability, support BOTH the lines and allow an increased frequency on the Inverness-Tain section while also allowing certain stops to be disentangled from the longer-distance services - plus there's the impending introduction of the button request stop system, indicating that ScotRail do actually see some future in the line as yet. If we're talking rail-bus integration, then how about a seasonal connection between Thurso and the ferry at Scrabster?