Striker
Member
- Joined
- 6 Dec 2010
- Messages
- 503
Launched today is the detailed route of HS2.
http://www.dft.gov.uk/pgr/rail/pi/highspeedrail/proposedroute/
http://www.dft.gov.uk/pgr/rail/pi/highspeedrail/proposedroute/
It looks from the second map page that it goes through Old Oak Common which is GWR, but in tunnel - which means that although HS1 has a link to HS2, it would not be possible to go from HS2 onto GWR. Am I right?Launched today is the detailed route of HS2.
I am sure that others who know the area better than me, could well correct my asumptions or be able to confirm that it is practicable to use the old Great central route.
It looks from the second map page that it goes through Old Oak Common which is GWR, but in tunnel - which means that although HS1 has a link to HS2, it would not be possible to go from HS2 onto GWR. Am I right?
Obviously this is for the future when we eventually get electrified...
I have not seen the confirmed route yet, but I am sure that there will have been some carefully thought out changes to tone down the complaints from 'Conservative Voters" who are upset about the previously suggested route by the Labour Government.
How ever I would have thought that there exsists a route that could be used to some degree for some of the length. That is the old great Central route between Carlvert Juntion and Rugby. The route was orginally built to the 'Berne' gauge. It was well engineered and it already exsists to some degree. So the impact would be limited more if this old route was used.
I am sure that others who know the area better than me, could well correct my asumptions or be able to confirm that it is practicable to use the old Great central route.
I agree the GC was built to the Berne loading guage
Am I missing something or does it cut straight through the middle of a housing estate in Chalfont St Peter?
I think it's in tunnel all the way from Old Amersham to the other side of Chalfont St. Peter (coming out near the M25, as far as I can tell) - that's what the red outline means.
Thanks Solaris for expanding on my point.I would challenge the assertion that we have a UK Strategy... .
Thanks Solaris for expanding on my point.
It would be interesting to compare the population in the GWR direction (Heathrow, Bristol, Cardiff, Plymouth) with that north of Birmingham. I do think it is justified to electrify this line, and connect it to the HS network, then in the future we can have trains from the rest of Europe even if not at full speed - as is done over there. At the moment we are stranded!
.
Well spotted Jason, I didn't look that far along! I suppose it would join directly to the Heathrow link, so maximising the distance on the new line. Hopefully also a junction with the GWR.Hi,
The Heathrow link is clearly in mind. There are some extra concrete structures shown on map hs2-apr-00-dr-rw-04003.pdf which seem to be the flying connectors for a Heathrow link.
Lets start this debate by trying to identify who the 20,000 people PER HOUR who are prepared to pay £230.00 single to get from Central London to Birmingham theoretically 20 minutes quicker than the current methods provide. Remember that if you live is say Guildford you have to travel for 40 minutes into Central London to embark on HS2
(all these figures are taken from HS2 own documentation)
My house appears on the new route map for HS2 with 2 red dots on it, of course I get no explanation.
Clive, you have my sympathy also, it is pertinent that the personal aspects of HS2 are heard and listened to alongside all the facts and figures.I have spent 27 years repairing decades of agricultural neglect,
With regards teleconferencing etc. As a project manager I regularly use web-conferencing etc and these technologies are by now well accepted in the business community and used simply because travel is very costly and time consuming. However I hope you'll agree from your own experience that when you are doing business or running projects, there is no substitute for actually going and shaking someones hand, looking them in the eye etc and developing trust and understanding.
That would be bad enough if the line were needed, but it isn't.
I chanced upon your forum, but before I express my views perhaps we should consider the difference between involvement and committment.
In a plate of bacon and egg the chicken is involved but the pig is committed
My house appears on the new route map for HS2 with 2 red dots on it, of course I get no explanation.
I have spent 27 years repairing decades of agricultural neglect, planting 2,800trees, hedges, reinstating watercourses and my reward, someone shoves a railway line through the middle of it.
That would be bad enough if the line were needed, but it isn't.
Not one single reason for its construction stands up to intelligent scrutiny
It will not save time,
It is not ecologically viable,
It is not economically viable
It will not make any contribution to the economy of the North
The money would be better used upgrading the UK's internet backbone so that techniques like video conferencing become possible, then there is no need for most business travel. A fibre optic into every telephone user in the UK would cost £9 Billion, a saving of some £24 Billion on the projected costs of HS2 which will of course be hugely overshot
Lets start this debate by trying to identify who the 20,000 people PER HOUR who are prepared to pay £230.00 single to get from Central London to Birmingham theoretically 20 minutes quicker than the current methods provide. Remember that if you live is say Guildford you have to travel for 40 minutes into Central London to embark on HS2
(all these figures are taken from HS2 own documentation)