The cost of doing business, be better at dealing with things and you’ll reduce the problem, even when the issue is caused by the weather.
Less Network Rail staff available to deal with weather related incidents is certainly part of the problem. Plus less TOC staff to deal with passengers. From what I can tell, Network Rail were as ready as they could be (see later). But only with the normal levels of staff.
Unfortunately whilst I’d like to agree, in the real world it appears to be used as a get out of jail free card more and more. Operators are throwing the towel in earlier and earlier into developing situations because they have out their toes in the water and got away without being bitten by that family of crocodiles.
That family of crocodiles are the ORR, The Rail Ombudsman, The Rail Delivery Group, Transport Focus, the DfT. They’re made of plastic and just bob about aimlessly in the water.
Yes, there do appear to be more ‘do not travel’ events than in the past. Or at least, that is the perception. It’s a right pain when you have already started your journey, or want to return home. Or if you are trying to get to work, or go home after work.
I feel that at least sometimes the railways appear to give up trying to run a railway service more often. Obviously completely wrecking the timetable for everybody is not the answer. But where possible, on the already affected areas, running a late train is better than no train. However it’s extremely hard to second guess the decisions that have been (or are being) made, because outside ‘control’, we don’t have access to all the information. But the perception is there. Maybe it’s because some of us remember BR staff going above and beyond and managing to find spare trains and crew to run special extra trains.
Having said that, certainly some TOCs do sometimes run special extra trains (I know of GWR and CrossCountry), although most of the time, this is making use of trains that happen to be in the wrong place.
Also, most of the time the TOCs do appear to be able to sort out transport for their own staff such as train crew and fitters. Yes, this is obviously a much smaller scale than getting transport for passengers. And often most of the taxis are booked in advance. It is obviously not practical to book taxis in advance in case of train delays or cancellations.
However, if it is strongly suspected that there will be disruption, should at least some extra buses be booked above the normal standby requirement?
There are two parts of the ORR, that bit that oversees safety, and the bit that deals with funding. I don’t see any help coming from the bit that deals with funding.
The Rail Delivery Group is owned by the TOCs, so don’t expect much help from them.
And I’m not sure what you expect to get from the DfT.
It appears there was a land slip and flooding at Chard which prevented trains continuing west. 1L80, 1L84 and 1L88 all appear to have started from Yeovil that evening.
I don’t know about the Wessex route. It being away from my patch. However, on Wednesday 20th to Thursday 21st October in the South West, there was a weather warning of heavy rainfall with a risk of flooding. Further, strong winds gusting 40-45mph were expected.
On Wednesday 20th, 1L53 (17:20 Waterloo to Exeter St David's) reported water cascading down the embankment between Feniton and Whimple. As a result, the line was closed to all traffic between Honiton and Exeter. Could this be the cause of all trains on the 20th after this being terminated short at Yeovil Junction station?
However, the line was reopened here around 08:00 on Thursday 21st, at least as far as the Western was concerned.
There may have been other problems on Thursday. Or Trains from Waterloo were being planned to terminate at Yeovil due to running at reduced speed. Therefore giving them a chance to run back to Waterloo in their booked path.
On Thursday 21st the Great Western main line was affected by flooding at Hele near Bradninch between Exeter St David's and Tiverton Parkway. This is thought to be caused by the River Culm.
This closed the line from the early morning until 13:30. But the knock on cancellations and delays continued for many hours afterwards. So no diversions we’re possible by using this line.
During this incident, for a time GWR had trouble getting taxis causing difficulty in moving crews to work services. Apparently due to a two hour wait.
Overall, it does look like there was not enough joined up thinking around alternative arrangements, such as Western/Wessex and GWR/SWR working together. Or having enough alternate transport available throughout the time that it may have been required.
Obviously at first, it may not have been possible to run special diverted trains. But where were the contingency plans. The railways knew about the weather warning on the 18th.