• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Cancelled - "bridge being open for river traffic"

Status
Not open for further replies.

DeeGee

Member
Joined
24 Jul 2012
Messages
1,137
Location
Great Grimsby
Sorry if this is the wrong place to ask this.

I've been looking at the train times through Grimsby Town this lunchtime on RTT, and I've noticed that the 1241 train to Cleethorpes, and the one that that unit makes up going back in the other direction 1326 from CLE have both been cancelled, cut short at Doncaster, because a "bridge was open for river traffic."

I don't think I've ever seen that before. Which bridge would it be? The swing bridge over the Keadby Canal? I'm guessing it must be something between Donny and Scunny.

I'm surprised that the operation of the railway doesn't take precedence - I'm not sure I've ever seen much traffic on that waterway, and that which is is surely only pleasure craft?

I'm also surprised its resulted in cancellation of the service from Donny, there's a good half an hour to turn round at Cleethorpes, surely the bridge wasn't going to be open for that long?

I'll be honest, I don't understand timings and diagrams and the like, just really surprised to see this particular thing arise.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Townsend Hook

Member
Joined
3 Aug 2011
Messages
932
Location
GB
The Keadby bridge has a habit of not wanting to close again after it has opened. Can’t say whether this is what happened in this case, but it wouldn’t be particularly unusual.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,409
Location
Somerset
I'm surprised that the operation of the railway doesn't take precedence - I'm not sure I've ever seen much traffic on that waterway, and that which is is surely only pleasure craft?
The right of navigation will have existed before the railway, so can’t be ridden too roughshod over!
 

DeeGee

Member
Joined
24 Jul 2012
Messages
1,137
Location
Great Grimsby
The right of navigation will have existed before the railway, so can’t be ridden too roughshod over!
I can understand the logic of that, but is that really the case?

There'll be historic trackways that predate the Railway but cross its route, and the railway takes precedence over those, doesn't it?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
I can understand the logic of that, but is that really the case?

There'll be historic trackways that predate the Railway but cross its route, and the railway takes precedence over those, doesn't it?
The original Act authorising the railway will probably have specifically permitted their closure. The existence of alternative routes will have been a factor in allowing it.
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,409
Location
Somerset
I can understand the logic of that, but is that really the case?

There'll be historic trackways that predate the Railway but cross its route, and the railway takes precedence over those, doesn't it?
The navigation authorities had / have a lot of clout and legal status - historically much more ( in general) than any authority looking after roads. The right to use “ historic trackways” crossing railway lines still exists - but it is generally a good idea to give way to trains!
 

unlevel42

Member
Joined
5 May 2011
Messages
596
The Keadby bridge has a habit of not wanting to close again after it has opened. Can’t say whether this is what happened in this case, but it wouldn’t be particularly unusual.
The "Keadby bridge" last opened in 1956.
The Vazon Sliding Railway Bridge crosses the Stainforth and Keadby Canal very close to where it enters the Trent.
Photograph taken by Andy Dyer on canalplan.uk
The Keadby Bridge (King George V Bridge) crosses the Trent and no longer lifts.
Both bridges are at Keadby, nearest station Althorpe, Lincolnshire.
 
Last edited:

DeeGee

Member
Joined
24 Jul 2012
Messages
1,137
Location
Great Grimsby
The "Keadby bridge" last opened in 1956.
The Vazon Sliding Railway Bridge crosses the Stainforth and Keadby Canal very close to where it enters the Trent.
The Keadby Bridge (King George V Bridge) crosses the Trent and no longer lifts.
Both bridges are at Keadby, nearest station Althorpe, Lincolnshire.
Photograph taken by Andy Dyer on canalplan.uk
Thanks for that photo. That's a view I'm not likely to ever see.

I was thinking of the Vazon Sliding bridge when I asked the original question.
 

merry

Member
Joined
19 Oct 2011
Messages
177
The Vazon sliding bridge had a fault earlier this year for some time, and Canal River trust (CRT) were only opening it by prior arrangement (latterly not at all) from late July to 18 Nov. However, that might not be relevant, as it was working again from 18 Nov...
Checking CRT notices, i see there was an inspection of bridge 78 [canal numbers!] by NR from 7-9 Dec (i.e. up to today) using a pontoon, it may have been necessary to close to rail traffic whilst working underneath or investigating something. No notices about the Vazons bridge [no. 83 I think].
 

AlbertBeale

Established Member
Joined
16 Jun 2019
Messages
3,188
Location
London
It's common, when bridging waterways (for road or rail) which have historically been used for navigation to give precedence to waterborne traffic where there is a potential conflict. Tower Bridge in London is a classic example - anyone on a vessel which needs the bridge lifted can demand that it is (though these days they need to give something like a day's notice rather than just turning up, as was once the case). I believe a high-security convoy with a US presdent on board was split, half on each side of the bridge, once a few decades back, which sent them into quite a tizzy. The bridgemaster couldn't or wouldn't override their legal duty to lift the bridge for a sailing boat which was passing through.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,001
Location
Up the creek
It was May 1997 and Bill Clinton was returning from lunch with Tony Blair. A sailing barge called Gladys had arranged for the bridge to be opened and opened it was.
 

Mcr Warrior

Veteran Member
Joined
8 Jan 2009
Messages
17,256
Tower Bridge in London is a classic example - anyone on a vessel which needs the bridge lifted can demand that it is (though these days they need to give something like a day's notice rather than just turning up, as was once the case). I believe a high-security convoy with a US presdent on board was split, half on each side of the bridge, once a few decades back, which sent them into quite a tizzy.

Thought it was part of the plot from the 2016 film "London has Fallen". :)

Checking CRT notices, i see there was an inspection of bridge 78 [canal numbers!] by NR from 7-9 Dec (i.e. up to today) using a pontoon, it may have been necessary to close to rail traffic whilst working underneath or investigating something.

Anyhoo, getting back on topic, where exactly is "Bridge 78" if indeed this was the one that was causing the bother? Somewhere near Thorne?
 
Joined
11 Jan 2015
Messages
969
I’ve heard an American response was “how good of you to have arranged to show the bridge opening”.
 

Towers

Established Member
Joined
30 Aug 2021
Messages
2,999
Location
UK
Good!
It was May 1997 and Bill Clinton was returning from lunch with Tony Blair. A sailing barge called Gladys had arranged for the bridge to be opened and opened it was.
Good :D
 

Oxfordblues

Member
Joined
22 Dec 2013
Messages
1,127
I wonder if any boaters here in Oxford could demand opening of the Sheepwash Stream bridge even if a train to/from Bletchley was due?
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,281
Location
Bolton
There'll be historic trackways that predate the Railway but cross its route, and the railway takes precedence over those, doesn't it?
Generally not. If a railway infrastructure manager wants to close highway level crossing they will be required to get the necessary consents. Not even the railway can just decide to close or divert a highway.

The difference is that cars will stop for trains but trains stop for watercraft.
 

reach123y

Member
Joined
8 Dec 2017
Messages
22
According to Northern Assist it was between Althorpe and Crowle which would be the one over the canal and not the River Trent.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,668
Location
Nottingham
The navigation authorities had / have a lot of clout and legal status - historically much more ( in general) than any authority looking after roads. The right to use “ historic trackways” crossing railway lines still exists - but it is generally a good idea to give way to trains!
The reason for the M8 being on a big viaduct at Glasgow Airport was the historic navigation rights on the White Cart (it's a river, not some kind of vehicle) when it was built in the 1960s. According to something I found on the internet when researching for the tram-train/PRT project, this right has now been extinguished.
 

John Webb

Established Member
Joined
5 Jun 2010
Messages
3,774
Location
St Albans
.....The difference is that cars will stop for trains but trains stop for watercraft.
The main reason for water craft having precedence is that it is much harder to stop vessels safely in water than trains on fixed rails or vehicles on a road.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
Was interesting a few years ago when Network Rail welded the rails & refused to swing Trowse Bridge in Norwich. Had to agree with their defence that it was much much cheaper to pay fines to the river authority than it was to the TOCs when the blasted thing failed to close.
 

Ediswan

Established Member
Joined
15 Nov 2012
Messages
3,432
Location
Stevenage
Was interesting a few years ago when Network Rail welded the rails & refused to swing Trowse Bridge in Norwich. Had to agree with their defence that it was much much cheaper to pay fines to the river authority than it was to the TOCs when the blasted thing failed to close.
Is this fact. I searched Google and found nothing. I did find protests from this year at the suggestion of welding the lifiting mechanism of the next upstream (road) bridge.
 

lincolnshire

Member
Joined
12 Jun 2011
Messages
884
The "Keadby bridge" last opened in 1956.
The Vazon Sliding Railway Bridge crosses the Stainforth and Keadby Canal very close to where it enters the Trent.
Photograph taken by Andy Dyer on canalplan.uk
The Keadby Bridge (King George V Bridge) crosses the Trent and no longer lifts.
Both bridges are at Keadby, nearest station Althorpe, Lincolnshire.
The railway bridge in the open to canal position in the picture is actually called Keadby Canal Drawbridge and the one over the River Trent at Althorpe is call Keadby River Bridge. The actual Vason Bridge is the one in the distance in the picture next to the white painted house on the right which is called Vason House and is owned by the Canal & Rivers trust and is worked by the boaters themselves.

The Vazon sliding bridge had a fault earlier this year for some time, and Canal River trust (CRT) were only opening it by prior arrangement (latterly not at all) from late July to 18 Nov. However, that might not be relevant, as it was working again from 18 Nov...
Checking CRT notices, i see there was an inspection of bridge 78 [canal numbers!] by NR from 7-9 Dec (i.e. up to today) using a pontoon, it may have been necessary to close to rail traffic whilst working underneath or investigating something. No notices about the Vazons bridge [no. 83 I think].
One of the two hauling wire ropes snapped so that mean,t that the bridge was unable to open as required for canal boats to pass through.

== Doublepost prevention - post automatically merged: ==

Sorry if this is the wrong place to ask this.

I've been looking at the train times through Grimsby Town this lunchtime on RTT, and I've noticed that the 1241 train to Cleethorpes, and the one that that unit makes up going back in the other direction 1326 from CLE have both been cancelled, cut short at Doncaster, because a "bridge was open for river traffic."

I don't think I've ever seen that before. Which bridge would it be? The swing bridge over the Keadby Canal? I'm guessing it must be something between Donny and Scunny.

I'm surprised that the operation of the railway doesn't take precedence - I'm not sure I've ever seen much traffic on that waterway, and that which is is surely only pleasure craft?

I'm also surprised its resulted in cancellation of the service from Donny, there's a good half an hour to turn round at Cleethorpes, surely the bridge wasn't going to be open for that long?

I'll be honest, I don't understand timings and diagrams and the like, just really surprised to see this particular thing arise.
I presume that they don,t have bridge open for canal traffic in the system? I have seen bridge open for river traffic used for when Goole Swing Bridge has to open for ships to pass through been displayed at Doncaster Station in the past.
 

Doctor Fegg

Established Member
Joined
9 Nov 2010
Messages
2,135
Location
Charlbury
There will be no question of boats having precedence on the Stainforth & Keadby. A narrowboat or cruiser can easily stop within a few seconds. There will be no historic rights here - the S&K, like most canals, was eventually owned by a railway company which would have rescinded any historic rights if there were any (I don't know of any having been in place for railways that crossed canals, though rivers are a different kettle of fish). I have a vague recollection that the S&K actually converted itself into a railway company, seeing the coming thing, but I may be wrong.

We took our boat past this bridge a few years back. We just waited for the bridge-keeper to open up and signal us through. A couple of Pacers went through while we were waiting. Believe me, after the trip up the tidal Trent, any boater will be plenty happy to wait a few minutes here.

I wonder if any boaters here in Oxford could demand opening of the Sheepwash Stream bridge even if a train to/from Bletchley was due?
No, I believe that (many years ago) boaters were expected to wait for a gap between trains. Didn't Rolt go through that bridge in Narrow Boat?
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
19,874
Location
East Anglia
Is this fact. I searched Google and found nothing. I did find protests from this year at the suggestion of welding the lifiting mechanism of the next upstream (road) bridge.
Yes, must have been 15-20 years ago. It was quite prolific local news at the time. The bridge was very troublesome since new in 1986 when it was lifted with the jacks in.
 
Status
Not open for further replies.

Top