I'm unclear exactly how many properties are in scope but it could be as many as 30 here.

Trying to include people's property for compulsory purchase without first exhausting any alternative options and demonstrating that it's actually required could see an application for an Order rejected completely. Of course I'm sure they will not be making the mistake of proposing trying to overturn people's lives without the proper evidence but you can't just go "they'll only be £150k each" and buy them because that's an easy way out.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,543
Location
Northampton
I suspect that making an offer on the open market would be much less expensive than going through the Compulsory purchase process - even if the offer had to be substantially above the market value to persuade people to move. However depopulating an entire street is a very dramatic step to take and one that will have very large possible consequences, many of which can't be accurately accounted for until they happen.

A physical barrier, sympathetic design and compensation amount will carry less variables and risk to the project.
 

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,132
Do we know how they plan to path additional trains on the 2 track section east of Westtown? One of the reasons I was in favour of new build all the way to Leeds is I didn't think there was space for additional trains on the route through Batley and Morley and at Leeds itself
I imagine it may be hoped that a Leeds Trams scheme will 'free up' some train platforms by removing (relocating) some currently heavy-rail services?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,543
Location
Northampton
I imagine it may be hoped that a Leeds Trams scheme will 'free up' some train platforms by removing (relocating) some currently heavy-rail services?
Why would this round of a Leeds Transit system come up with a different answer to the however-many there have been before?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The houses under discussion at Mossley are on the right between 38:15 and 38:30 in this cab video.

 

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,132
Why would this round of a Leeds Transit system come up with a different answer to the however-many there have been before?
I guess naively I thought of Merseyrail, Manchester Victoria and Newcastle Metro as 'reifocusing' in something like that kind of 'integrated' way.

I also don't see any 'review' as a route necessarily to a different answer, but to ('dither and') delay and thereby transfer of expenditure from CapEx to Consultants. It seemed so much more straightforward in the past in recognising the contributions of McAlpine or Marples ;). Sceptic or septic?

Leeds MPs: https://democracy.leeds.gov.uk/mgmemberindexmp.aspx?bcr=1
Leeds Council make-up: https://www.leeds.gov.uk/your-council/elections/political-make-up
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,829
I imagine it may be hoped that a Leeds Trams scheme will 'free up' some train platforms by removing (relocating) some currently heavy-rail services?

I think the last plan I saw for this area was about the tram coming down the Spen Valley to Dewsbury then heading towards Leeds not going anywhere near Batley or Morley, with the possibility of a branch towards Huddersfield from both.

2 track from Westtown could be solved by having loops at Batley and adjusting the station location, which I believe has been looked at. It'd be pretty minor compared to everything else.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,371
Location
Yorkshire
Just a gentle reminder this is an infrastructure thread for actual updates regarding TPE route upgrade & electrification.

If anyone wishes to discuss anything speculative, please use the Speculative Discussion section.

Thanks
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
The houses under discussion at Mossley are on the right between 38:15 and 38:30 in this cab video.

Looking through that video there looks like no structural encumbrances between Leeds and Church Fenton so seems bizarre NR haven't pushed it as project to showcase how well they can deliver electrification over a simple route alignment and get more services running under the juice.
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
5,368
Looking through that video there looks like no structural encumbrances between Leeds and Church Fenton so seems bizarre NR haven't pushed it as project to showcase how well they can deliver electrification over a simple route alignment and get more services running under the juice.
Is it something to do with waiting for four tracking?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,920
Location
Mold, Clwyd
Is it something to do with waiting for four tracking?
Some of the bridges were raised before the Grayling "pause" in work happened.
Another reason given at the time was that the electrification didn't include any track upgrades (which have been significant Victoria-Stalybridge, and is now planned Huddersfield-Dewsbury).
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
Is it something to do with waiting for four tracking?
It was built with bridges four tracks wide but only two were ever installed it what lends itself to such a simple electrification job and not sure it has the traffic over most of its length to warrant four tracking other than maybe section into Leeds and that would be fraught with issues as bas as Castlefield.
 

geordieblue

Member
Joined
11 Jan 2020
Messages
787
Location
Leeds
Not sure it has the traffic over most of its length to warrant four tracking other than maybe section into Leeds and that would be fraught with issues as bas as Castlefield.
Leeds-Church Fenton has I think two Northern services, five Transpennine services and one Crosscountry service per hour as well as stock movements to Neville Hill depot and some freight. This is one of the busiest bits of two track railway in the north and loops to help regulate the Northern stoppers would seriously help.
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
9,276
Looking through that video there looks like no structural encumbrances between Leeds and Church Fenton so seems bizarre NR haven't pushed it as project to showcase how well they can deliver electrification over a simple route alignment and get more services running under the juice.
No point even planning it until they knew whether the HS2 bypass was on its way and whether NPR would be needing to use that bit or route too.
Now they have a much better idea of long term usage they can give the money holders some options....
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,829
Looking through that video there looks like no structural encumbrances between Leeds and Church Fenton so seems bizarre NR haven't pushed it as project to showcase how well they can deliver electrification over a simple route alignment and get more services running under the juice.

You can look at it the other way. If there were problems with the easy bit that might see the rest cancelled after only the 'easy' bit had been done, but if there ARE problems with the difficult bits that's not likely to see the easy bit cancelled, as it would still be able to be agued that it will still be easy to do that last bit.
 

twin turbo

Member
Joined
12 Oct 2019
Messages
33
Location
Leeds
No point even planning it until they knew whether the HS2 bypass was on its way and whether NPR would be needing to use that bit or route too.
Now they have a much better idea of long term usage they can give the money holders some options....
Presumably NPR could still use what would have been the HS2 route to take out the curve at Church Fenton if required as the land is still safe guarded.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
You can look at it the other way. If there were problems with the easy bit that might see the rest cancelled after only the 'easy' bit had been done, but if there ARE problems with the difficult bits that's not likely to see the easy bit cancelled, as it would still be able to be agued that it will still be easy to do that last bit.
You should be a politician.

Anyhow if that was the case what is the point of only going to Church Fenton currently. Surely what we should be doing is getting the wires up where we can as quickly as possible to deliver effect carbon reduction as fast as possible especially where the route already has BiMode stock.
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
3,829
You should be a politician.

Anyhow if that was the case what is the point of only going to Church Fenton currently. Surely what we should be doing is getting the wires up where we can as quickly as possible to deliver effect carbon reduction as fast as possible especially where the route already has BiMode stock.

You can wire to Church Fenton without major disruption, any further and you end up having to divert a lot via Milford & Castleford.
 

Nicholas Lewis

Established Member
Joined
9 Aug 2019
Messages
8,009
Location
Surrey
You can wire to Church Fenton without major disruption, any further and you end up having to divert a lot via Milford & Castleford.
better not wire anything else then if we are concerned by disruption.

Seriously the industry needs to get a lot smarter at getting most out of access it does get and it needs to gear up the supply chain to be able to deliver at the scale SBB did see youtube video. Might be expensive but then so are the costs for paying out sch4 as well as the impact on revenue whilst works are happening.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
better not wire anything else then if we are concerned by disruption.

Seriously the industry needs to get a lot smarter at getting most out of access it does get and it needs to gear up the supply chain to be able to deliver at the scale SBB did see youtube video. Might be expensive but then so are the costs for paying out sch4 as well as the impact on revenue whilst works are happening.
It’s expensive to continue burning Diesel and maintaining Diesel stock while we keep stalling with electrification. What is the impact of electrification on revenue again?
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
It’s expensive to continue burning Diesel and maintaining Diesel stock while we keep stalling with electrification. What is the impact of electrification on revenue again?
Well some freight companies right now are using diesel traction where a few months ago they were using electric, because artificialities in the market make it cheaper for them.
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
Well some freight companies right now are using diesel traction where a few months ago they were using electric, because artificialities in the market make it cheaper for them.
Given that they are artificial, would it not be cheaper to remove these artificialities? I suspect the answer is yes but some of them are so deeply embedded in the structure of the privatised railway. The concept of paying leasing costs is purely an artificiality.
 

LittleAH

Established Member
Joined
24 Oct 2018
Messages
1,211
better not wire anything else then if we are concerned by disruption.

Seriously the industry needs to get a lot smarter at getting most out of access it does get and it needs to gear up the supply chain to be able to deliver at the scale SBB did see youtube video. Might be expensive but then so are the costs for paying out sch4 as well as the impact on revenue whilst works are happening.
The entire route will be wired. May as well wire the easy bits first with the planning for the difficult bits taking more time. Seems to be a fair few people working on it and you don't do that if it's getting canned.
 

quantinghome

Established Member
Joined
1 Jun 2013
Messages
2,885
2 track from Westtown could be solved by having loops at Batley and adjusting the station location, which I believe has been looked at. It'd be pretty minor compared to everything else.
I'm not a timetable planner, but there would appear to be significant problems with a loop at Batley.

Loops at Batley wouldn't be long enough to be 'dynamic' i.e. the stopping train would have to wait in the loop until the fast train had overtaken. Assuming 3 minute headways between trains, that's a minimum six minute delay.

To make matters worse, the journey time difference between fast trains and stoppers from Batley to Leeds would mean that each stopping train takes up 3 fast train paths. That means the fast trains would have to be flighted together to maximise capacity, which means the Batley delay goes up to 9 minutes as it waits for two fast trains to pass.

But it gets worse. Batley is a bad location for a loop, as it's not that far north of the four-track section from Huddersfield to Westtown. The stopping train coming from Huddersfield towards Leeds will arrive at Dewsbury just behind a fast train, with the next fast train still some way behind. This means the stopping train would have to wait even longer at Batley to allow the fast train to catch up and overtake.

A better bet might be to put a loop in at Morley, which is more in the middle of the two-track section. But it would still mean a much slower stopping service, and a fantastically complex timetable with little room for failure and recovery.
 

Top