When both myself and my partner visited Filey back in May, we both found that the then York - Scarborough shuttle was reliable with no delays. Perhaps this should become permanent?
I agree, although I travel to the NW on occasions, athough less so than pre Covid.
- It addresses the problem of movements across the throats of York station as the shuttle uses Platforms 2/4 at York
- Scarborough - York reliability is improved, and no excuse for it slip
- Pathing issues through the single platform at Malton are easier to manage
- Connections at Seamer with trains toward Bridlington are easier to maintain
- If you need Manchester Piccadilly/Airport you have to change anyway
- One less service through the congested Leed Manchester corridor
As
@Gerald Fiennes mentioned I do wonder why the maximum train length on TPE is 6 carriages, and most services fall short of this. What is the maximum platform length on the core Newcastle - Manchester - Liverpool route assuming only major stops are served? Surely a quick win would be to increase train lengths rather than frequency, and the recent upgrade to the TPE fleet would have been the ideal time to address this. Instead of 4 tph York Manchester reduce it 3tph 7/8 carriage trains, adding a 4th service at Leeds going to and from Hull, much like it was pre 2016. It would also be cheaper to deliver and have the same capacity hourly as the current and previous (2018) "Lets see how much we can cram through" timetable proposals. TPE York/Hull Manchester services would only call at Leeds and Huddersfield Between York/Selby and Manchester. The Hull service could follow as the next path following a Liverpool service, giving a quick same platform change at Huddersfield for Piccadilly assuming the Hull service goes via Guide Bridge. (and just ahead eastbound, with the same easy change at Huddersfield). The stopping services could then be allocated suitable rolling stock (185s?), and there would roughly two 20min and one 15min interval between fast services each hour to thread them through.
No through airport services, everything either goes via Guide Bridge to low numbered Pic platforms or Liverpool via Victoria. Castlefield is just another bottleneck that can and should be avoided by TPE North services
I dont think the Hull - Liverpool market is significant or ever will be, but I think Hull travellers want a decent Manchester service, limited stop, and comfortable.