Crossrail - Construction updates and progress towards opening (now expected 24 May 2022)

Status
Not open for further replies.

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,375
Can be general public, I was one of the testers for the Edinburgh Tram before it opened - the main aim was to try different crowd control methods for Murrayfield
Yes, at some point. Doesn't mean it is general public at this stage. I don't think anything has been publicised about seeking volunteers yet.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

itfcfan

Member
Joined
7 May 2011
Messages
348
Has anyone seen information about planned service patterns once the final phase of the opening is complete? i.e. Something more detailed than 24tph in the core during the peak, 12tph running west of Paddington, 12tph to Abbey Wood and 16tph east of Liverpool street (including the 4 terminators)?

This London Reconnections article from 2018 went into some depth on the expected service pattern west of Paddington:

With services terminating at Heathrow, Maidenhead and Reading and the existing services stopping at different intermediate stations depending on the final destination, this part of the line has a more complex timetable than east of Liverpool street (all stops either to Gidea Park or Shenfield) and Abbey Wood (all stops on all services).

The 2018 article suggested stations such as West Ealing and Hanwell would receive a significant uplift in services calling. Given I believe 12tph west of Paddington is still the plan, my assumption is this service pattern is likely to remain the plan. But if anyone knows otherwise I'd be interested to hear about it!
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,857
Location
UK
From March next year it will be 12tph from Paddington to Abbey Wood, no connectivity at the Eastern/Western ends.

From September I think the idea is to run the existing TfL rail timetable but extend GWML services to Abbey Wood and GEML services to Paddington as interleaved but separate services.

Then the full timetable in March 23.
 

JonathanH

Veteran Member
Joined
29 May 2011
Messages
23,375
From September I think the idea is to run the existing TfL rail timetable but extend GWML services to Abbey Wood and GEML services to Paddington as interleaved but separate services.
The question would then be whether some Abbey Wood services continue to terminate at Paddington (Westbourne Park) since TfL Rail only run 6tph West of Paddington off-peak and 8tph peak. Indeed, the path for 8tph off-peak is blocked by GWR's Didcot Patkway service
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
Yes, at some point. Doesn't mean it is general public at this stage. I don't think anything has been publicised about seeking volunteers yet.
They have been advertising for volunteers on the tfl intranet for months , youn sign up for a mailing list iirc.

Also I believe they will contact specific disability charities to get some of their members to be a part of a trial.(To test train evacuation of a wheelchair user for example).
 
Joined
10 Jun 2021
Messages
9
Location
London
Can be general public, I was one of the testers for the Edinburgh Tram before it opened - the main aim was to try different crowd control methods for Murrayfield

The volunteers are internal to TfL only, advert went up within the last 4 weeks with a substantial amount internally, having already volunteered for the exercises.
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,857
Location
UK
I know all the volunteers are professionals, but you can't help but think a few phone videos might sneak out regardless.
 

Dstock7080

Established Member
Joined
17 Feb 2010
Messages
3,531
Location
West London
They have been advertising for volunteers on the tfl intranet for months , youn sign up for a mailing list iirc.

Also I believe they will contact specific disability charities to get some of their members to be a part of a trial.(To test train evacuation of a wheelchair user for example).
Staff email received today saying that:
Our programme has changed slightly but we are still holding all six of our Volunteer Exercises on Saturdays or Sundays in early 2022. We have to do some extra work at Christmas first to make sure our trains and tunnels are totally safe for large volumes of people as the safety of our volunteers is and always will be paramount. Also our next software update is happening over Christmas, which we need to see demonstrated and assured before we bring you in to volunteer!
 

kevin_roche

Member
Joined
26 Feb 2019
Messages
997
Staff email received today saying that:
Our programme has changed slightly but we are still holding all six of our Volunteer Exercises on Saturdays or Sundays in early 2022. We have to do some extra work at Christmas first to make sure our trains and tunnels are totally safe for large volumes of people as the safety of our volunteers is and always will be paramount. Also our next software update is happening over Christmas, which we need to see demonstrated and assured before we bring you in to volunteer!

It makes perfect sense that they do those tests once the updates to the Ventilation System have been completed.

It was reported as planned in the Elizabeth Line Readiness Committee Report.

5.1 We have received provisional endorsement of the Joint Trial Operations Plan
(JTOP) at the Interim Technical Assurance Panel (ITAP). This follows the
decision to approach TO in two phases. This phased approach will enable final
testing and software adjustments to the Tunnel Ventilation System (TVS)before
Christmas, providing time for the subsequent assurance approvals to be in place.

5.2 A ‘gate’ has been scheduled for December 2021 to provide the conditional Go/No
Go for Phase 2 subject to the successful completion of the TVS works. Once
approved, this will allow us to carry out planned volunteer evacuation exercises in
January 2022 including the emergency services.
 
Last edited:

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
Has anyone seen information about planned service patterns once the final phase of the opening is complete? i.e. Something more detailed than 24tph in the core during the peak, 12tph running west of Paddington, 12tph to Abbey Wood and 16tph east of Liverpool street (including the 4 terminators)?

This London Reconnections article from 2018 went into some depth on the expected service pattern west of Paddington:

With services terminating at Heathrow, Maidenhead and Reading and the existing services stopping at different intermediate stations depending on the final destination, this part of the line has a more complex timetable than east of Liverpool street (all stops either to Gidea Park or Shenfield) and Abbey Wood (all stops on all services).

The 2018 article suggested stations such as West Ealing and Hanwell would receive a significant uplift in services calling. Given I believe 12tph west of Paddington is still the plan, my assumption is this service pattern is likely to remain the plan. But if anyone knows otherwise I'd be interested to hear about it!

The whole thing needs a timetable rewrite to my knowledge which is why I think it will integrate with a May or December timetable change.

As others have said with the GWR Paddington - Didcot train running they can't path (or it will be very tight) to path them all (and requires a timetable rewrite as mentioned), and GWR are keen to hold onto these 2tph on the relief lines; they've previously been offered by MTR to take all the paths and just run a Didcot-Reading shuttle but its been declined.

I will be interested to see whether Hayes bay still sees 2tph as that isn't in many initial diagrams. Would be a bit of a waste of the capacity. The above one states:
4tph to T5 (currently 0tph before 2000)
2tph to T4 (currently 2tph but terminate T2/3 due to Covid)
2tph to Maidenhead (currently 0tph but peak extras)
2tph to Reading (currently 2tph)
2tph GWR Didcot (currently 1tph due to Covid, returning to 2tph in December)

This is of course a 2018 document and is almost ancient now!
 
Last edited:

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,857
Location
UK
As others have said with the GWR Paddington - Didcot train running they can't path them all, and GWR are keen to hold onto these 2tph on the relief lines; they've previously been offered by MTR to take all the paths and just run a Didcot-Reading shuttle but its been declined. I will be interested to see whether Hayes bay still sees 2tph as that isn't in many initial diagrams.
Thought those had turned in to the Heathrow T5 terminators
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,266
Thought those had turned in to the Heathrow T5 terminators
No that was the West Drayton terminators

== Doublepost prevention - post automatically merged: ==

The whole thing needs a timetable rewrite to my knowledge which is why I think it will integrate with a May or December timetable change.

As others have said with the GWR Paddington - Didcot train running they can't path (or it will be very tight) to path them all (and requires a timetable rewrite as mentioned), and GWR are keen to hold onto these 2tph on the relief lines; they've previously been offered by MTR to take all the paths and just run a Didcot-Reading shuttle but its been declined.
Do GWR still have the stock to run these given how thinly the 387s are spread given thge 80x cracks) or are these the extra services that MTR will run from December to/from Reading? (and MTR running a Didcot shuttle)
 
Last edited:

kevin_roche

Member
Joined
26 Feb 2019
Messages
997
I read somewhere that following the September start of trains running through the core they would temporarily be running at less than full service in the core in order to make it possible without a corresponding change on the GWML and GEML.

Page 54/55 of Agenda and Papers for the Elizabeth line readiness Committee July 2021

Replacement of Stage 4 with Stage 5b
5.1 The revised proposal for the introduction of Elizabeth line services will principally
see the replacement of Stage 4 with Stage 5b; the paper on Part 2 of the agenda
contains more detail. The introduction of Stage 5b will connect the central section
of Crossrail to the eastern and western branches simultaneously, to allow
Elizabeth line trains to operate from Reading and Heathrow in the west to Abbey
Wood and from Paddington to Shenfield in the east. This has been developed
around two principal requirements:
(a) provision of a level of service reduced from that which would apply in the
full (Stage 5c) timetable
but sufficient to avoid inconsistent train loading or
sub surface platform crowding; and

(b) operation of a timetable based around the present pattern of service from
Reading, Heathrow and Shenfield enabling services to operate, without
substantial change, either into the London termini (Stages 4a and 5a+) or
through the Crossrail tunnel (Stage 5b).
 
Last edited:

Acton1991

Member
Joined
20 Jan 2019
Messages
391
The whole thing needs a timetable rewrite to my knowledge which is why I think it will integrate with a May or December timetable change.

As others have said with the GWR Paddington - Didcot train running they can't path (or it will be very tight) to path them all (and requires a timetable rewrite as mentioned), and GWR are keen to hold onto these 2tph on the relief lines; they've previously been offered by MTR to take all the paths and just run a Didcot-Reading shuttle but its been declined.

I will be interested to see whether Hayes bay still sees 2tph as that isn't in many initial diagrams. Would be a bit of a waste of the capacity. The above one states:
4tph to T5 (currently 0tph before 2000)
2tph to T4 (currently 2tph but terminate T2/3 due to Covid)
2tph to Maidenhead (currently 0tph but peak extras)
2tph to Reading (currently 2tph)
2tph GWR Didcot (currently 1tph due to Covid, returning to 2tph in December)

This is of course a 2018 document and is almost ancient now!
Can't see the need for GWR to run Didcot shuttles from Paddington - surely the western side of Crossrail should be handed to TfL to enable it to provide a level of service to all stations akin to the east, instead of cobbling together a mix of all-stations and skip-stops.

Passengers who want to travel all-stations to Didcot can surely change at Reading.
 

matt_world2004

Established Member
Joined
5 Nov 2014
Messages
4,581
There was never any plan for Hayes terminators in the original service. The current Hayes terminators will be extended to terminal 4 when full service resumes.

The bay platform at Hayes allows the service to continue running in the event of engineering works on the Heathrow branch or disruption preventing the branch being accessible.
 

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
11,012
Location
London
Can't see the need for GWR to run Didcot shuttles from Paddington - surely the western side of Crossrail should be handed to TfL to enable it to provide a level of service to all stations akin to the east, instead of cobbling together a mix of all-stations and skip-stops.

Passengers who want to travel all-stations to Didcot can surely change at Reading.

Yes that may well be true, but again GWR are not keen on this (nor are their passengers it seems who often elect to take a 387 over a 345!). This will be a contractual thing to be resolved - maybe an action of GBR if it's in a suitable state by then. I imagine that once it runs past Paddington the convenience of this may well outweigh their comfort.

== Doublepost prevention - post automatically merged: ==

There was never any plan for Hayes terminators in the original service. The current Hayes terminators will be extended to terminal 4 when full service resumes.

The bay platform at Hayes allows the service to continue running in the event of engineering works on the Heathrow branch or disruption preventing the branch being accessible.

Sensible - the more I think about it it does add good engineering / disruption contingency.
 

reddragon

Established Member
Joined
24 Mar 2016
Messages
3,274
Location
Churn (closed)
Yes that may well be true, but again GWR are not keen on this (nor are their passengers it seems who often elect to take a 387 over a 345!). This will be a contractual thing to be resolved - maybe an action of GBR if it's in a suitable state by then. I imagine that once it runs past Paddington the convenience of this may well outweigh their comfort.
Too right! You can get on a wonderful class 387 and enjoy a trip to London & in between. The class 345s are not really suited to 1 hour from Reading and switching to the fasts is rarely worth it, despite the locals sitting up to 15 mins at Reading.
 

Pshambro

Member
Joined
4 Oct 2015
Messages
50
Can't see the need for GWR to run Didcot shuttles from Paddington - surely the western side of Crossrail should be handed to TfL to enable it to provide a level of service to all stations akin to the east, instead of cobbling together a mix of all-stations and skip-stops.

Passengers who want to travel all-stations to Didcot can surely change at Reading.
From Twyford and Maidenhead towards Paddington the GWR services stop much less frequently than the TFL services and of course GWR will run a train that is more than 10 minutes late whereas TFL will cancel even when running only 2 TPH, so I hope TFL don’t get all paths on the reliefs

== Doublepost prevention - post automatically merged: ==

The whole thing needs a timetable rewrite to my knowledge which is why I think it will integrate with a May or December timetable change.

As others have said with the GWR Paddington - Didcot train running they can't path (or it will be very tight) to path them all (and requires a timetable rewrite as mentioned), and GWR are keen to hold onto these 2tph on the relief lines; they've previously been offered by MTR to take all the paths and just run a Didcot-Reading shuttle but its been declined.

I will be interested to see whether Hayes bay still sees 2tph as that isn't in many initial diagrams. Would be a bit of a waste of the capacity. The above one states:
4tph to T5 (currently 0tph before 2000)
2tph to T4 (currently 2tph but terminate T2/3 due to Covid)
2tph to Maidenhead (currently 0tph but peak extras)
2tph to Reading (currently 2tph)
2tph GWR Didcot (currently 1tph due to Covid, returning to 2tph in December)

This is of course a 2018 document and is almost ancient now!
Seeing this service pattern makes me realise why Twyford is now in Southall situation with (after the TT change) services roughly 7 and 23 mins apart. Presumably the other 2TPH that start at Maidenhead fill these gaps so it’s only an issue at Twyford ?
 

ijmad

Established Member
Joined
7 Jan 2016
Messages
1,857
Location
UK
Depending on the situation with covid next year and whether London workers return to their offices or not, I wonder if there will even be a case for 24tph in the near future. Given TfL's coffers a the moment, might we see a lesser service that would only be ramped up when demand requires it?

Thameslink has never reached 24tph after all, I know there are pre-pandemic reasons for that, but it seems like any push to get to that level has been entirely muted by the pandemic. I bet the timetable will probably hover around 16-20tph for quite some time to come.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,266
Depending on the situation with covid next year and whether London workers return to their offices or not, I wonder if there will even be a case for 24tph in the near future. Given TfL's coffers a the moment, might we see a lesser service that would only be ramped up when demand requires it?

Thameslink has never reached 24tph after all, I know there are pre-pandemic reasons for that, but it seems like any push to get to that level has been entirely muted by the pandemic. I bet the timetable will probably hover around 16-20tph for quite some time to come.
TfL have the trains and the staff.
A decent frequency on the branches and minimising crowding issues may be needed to help drive incremental usage.

Canary Wharf and the GEML branch (not much uplift) will be busy which doesn't leave much opportunity for reductions.
 

Non Multi

Member
Joined
11 Dec 2017
Messages
1,192
Depending on the situation with covid next year and whether London workers return to their offices or not, I wonder if there will even be a case for 24tph in the near future. Given TfL's coffers a the moment, might we see a lesser service that would only be ramped up when demand requires it?

Thameslink has never reached 24tph after all, I know there are pre-pandemic reasons for that, but it seems like any push to get to that level has been entirely muted by the pandemic. I bet the timetable will probably hover around 16-20tph for quite some time to come.
Also requires the so far rather flaky tech becoming ultra-ultra-dependable for peak 24tph.
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,334
Location
Reading
Can't see the need for GWR to run Didcot shuttles from Paddington - surely the western side of Crossrail should be handed to TfL to enable it to provide a level of service to all stations akin to the east, instead of cobbling together a mix of all-stations and skip-stops.

Passengers who want to travel all-stations to Didcot can surely change at Reading.
This topic has been done to death in various forums and discussion groups since it was first announced that Crossrail was being extended to Reading.

The two sides of London have different markets. Shenfield is about 19 miles from Liverpool Street (a bit further than Slough is from Paddington) and Reading is 36 miles from Paddington - nearly twice as far. As a result the eastern side is more of a 'metro' operation and the western side from, arguably, Langley westwards is much more outer suburban with identifiably separate towns. In view of the longer journey length a more appropriate type of train is not a bad idea.

Also there is considerable traffic on the full Thames Valley axis through Reading - the sum of the flows between Slough, Maidenhead and Twyford and, for example, the technology centres around Didcot and Culham and in the reverse direction are significant. One only has to look at the number of people who do not get out of the train when it stops at Reading.

By forcing a change at Reading the journey times for all these people will be increased by up to 30 minutes off peak if the pattterns do not match. Any Radley to Maidenhead passenger will now have to change twice...

An operating constraint is that by reversing a westerly shuttle at Reading another platform will be occupied for 10 minutes or so twice an hour. Such a shuttle cannot share a platform with the Crossrail trains as they fully occupy a platform twice an hour for their layover. In view of all the other calls on line and platform capacity - reversing Cross-Country trains, freight trains, trains coming off the North Downs line getting to the maintenance depot and so on and so forth, blocking a platform for longer than necessary does not seem to be a good idea.

The world does not, and cannot, revolve around Crossrail.
 

SynthD

Established Member
Joined
4 Apr 2020
Messages
2,049
Location
UK
Depending on the situation with covid next year and whether London workers return to their offices or not, I wonder if there will even be a case for 24tph in the near future. Given TfL's coffers a the moment, might we see a lesser service that would only be ramped up when demand requires it?

Thameslink has never reached 24tph after all, I know there are pre-pandemic reasons for that, but it seems like any push to get to that level has been entirely muted by the pandemic. I bet the timetable will probably hover around 16-20tph for quite some time to come.
As the trains are bought and the staff are trained, not a whole lot would be saved by avoiding 24tph. It may be preferable to hit or to avoid 24tph for some minor reason, like nearby tube platforms become overcrowded or cleared.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,578
Location
Brighton
This topic has been done to death in various forums and discussion groups since it was first announced that Crossrail was being extended to Reading.

The two sides of London have different markets. Shenfield is about 19 miles from Liverpool Street (a bit further than Slough is from Paddington) and Reading is 36 miles from Paddington - nearly twice as far. As a result the eastern side is more of a 'metro' operation and the western side from, arguably, Langley westwards is much more outer suburban with identifiably separate towns. In view of the longer journey length a more appropriate type of train is not a bad idea.

Also there is considerable traffic on the full Thames Valley axis through Reading - the sum of the flows between Slough, Maidenhead and Twyford and, for example, the technology centres around Didcot and Culham and in the reverse direction are significant. One only has to look at the number of people who do not get out of the train when it stops at Reading.

By forcing a change at Reading the journey times for all these people will be increased by up to 30 minutes off peak if the pattterns do not match. Any Radley to Maidenhead passenger will now have to change twice...

An operating constraint is that by reversing a westerly shuttle at Reading another platform will be occupied for 10 minutes or so twice an hour. Such a shuttle cannot share a platform with the Crossrail trains as they fully occupy a platform twice an hour for their layover. In view of all the other calls on line and platform capacity - reversing Cross-Country trains, freight trains, trains coming off the North Downs line getting to the maintenance depot and so on and so forth, blocking a platform for longer than necessary does not seem to be a good idea.

The world does not, and cannot, revolve around Crossrail.
Wasn't there an eventual aspiration for EWR to eventually extend from Oxford to terminate at Reading which would have all the problems you list? Maybe they'll run EWR out of Paddington :)
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,334
Location
Reading
Wasn't there an eventual aspiration for EWR to eventually extend from Oxford to terminate at Reading which would have all the problems you list? Maybe they'll run EWR out of Paddington :)
Now there's an idea...

...but why stop there? With some skullduggery at Stratford EWR could run through the Crossrail tunnels at Paddington at turn off towards Cambridge.

An Outer Circle! What's not to like? ;)