• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Could East-West Rail (EWR) be electrified?

Status
Not open for further replies.

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
STOP PRESS.

Who would like to help me complete the delivery of the £1.2bn East Coast Main Line Power Supply Upgrade, and start the journey on the £5bn East West Rail Project (where Jacobs are EWR Co’s Programme Partner)?

Due to a significant upturn in OLE work we are looking for OLE designers for these, and many other projects. We have an enviable wide-ranging bank of secured work, including early GRIP2/3, New Electrification, Allocation Design, Switching Design, Bonding, Station and Bridge remodelling, and PM and CEM roles within our delivery partners - the full sweep of OLE design.

Jacobs (EWR's Programme Delivery partner) are seeking out OLE Design Engineers for East West Rail.
I think there's more detail to come in tomorrow's IRP announcement...
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
STOP PRESS.


Jacobs (EWR's Programme Delivery partner) are seeking out OLE Design Engineers for East West Rail.
I think there's more detail to come in tomorrow's IRP announcement...

*Very* interesting!
 

SouthEastBuses

On Moderation
Joined
15 Nov 2019
Messages
1,800
Location
uk
STOP PRESS.


Jacobs (EWR's Programme Delivery partner) are seeking out OLE Design Engineers for East West Rail.
I think there's more detail to come in tomorrow's IRP announcement...

So does this mean that electrification is EWR is now back on track?

This is fantastic. But to make it fully effective, the gap between Didcot and Oxford needs to be filled first
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
So does this mean that electrification is EWR is now back on track?

This is fantastic. But to make it fully effective, the gap between Didcot and Oxford needs to be filled first
Perhaps not first. The most important thing if possible is to do Bicester to Bletchley before it opens.
 

SouthEastBuses

On Moderation
Joined
15 Nov 2019
Messages
1,800
Location
uk
Perhaps not first. The most important thing if possible is to do Bicester to Bletchley before it opens.

Why in your opinion?

If you do Didcot-Oxford first then you allow a fully electric service between destinations on the GWML and destinations on the EWR.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Because
Why in your opinion?

If you do Didcot-Oxford first then you allow a fully electric service between destinations on the GWML and destinations on the EWR.
Because it's always far easier and cheaper to electrify a line that is not in use than one that is in use. If you've got a limited window to do it before it's in traffic, use it.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
Because

Because it's always far easier and cheaper to electrify a line that is not in use than one that is in use. If you've got a limited window to do it before it's in traffic, use it.
Plus - you never know, Didcot - Oxford may be announced soon too...
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,272
Because

Because it's always far easier and cheaper to electrify a line that is not in use than one that is in use. If you've got a limited window to do it before it's in traffic, use it.
Probably too late to do Bicester to Bletchley before it opens now
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Probably too late to do Bicester to Bletchley before it opens now

Yep - the existing contractors will have a delivery programme that will cost money** if you start messing around with it. You'd have to finish the existing construction, then electrify, then open. Which would probably delay getting the whole thing into service.

**Unless there is some sort of clause in it to 'make way' for electrification teams to come along.
 

bspahh

Established Member
Joined
5 Jan 2017
Messages
2,441
Yep - the existing contractors will have a delivery programme that will cost money** if you start messing around with it. You'd have to finish the existing construction, then electrify, then open. Which would probably delay getting the whole thing into service.

**Unless there is some sort of clause in it to 'make way' for electrification teams to come along.
Even if the railway gets built first, and then it gets electrified, it would be cheaper to do it before the line gets opened, so they don't have work around a running railway.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Even if the railway gets built first, and then it gets electrified, it would be cheaper to do it before the line gets opened, so they don't have work around a running railway.

Though on the flipside you lose the passenger benefits over the extended period of time before you can get it open. Open as diesel then progressively electrify might cost more, but you get the benefits release of the new railway sooner.

If EWR have been clever, the actual electrification could be relatively undisruptive if bridges etc are already built with the right clearances - would be "just" a case of turning up at night and driving piles etc.
 

InTheEastMids

Established Member
Joined
31 Jan 2016
Messages
1,396
Looks very promising, is this consistent with the earlier EWR rolling stock tender activity where it suggested they were looking for DMUs for about 4 years? Or did that get binned off in favour of borrowing WMR 196s?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,296
Though on the flipside you lose the passenger benefits over the extended period of time before you can get it open. Open as diesel then progressively electrify might cost more, but you get the benefits release of the new railway sooner.

If EWR have been clever, the actual electrification could be relatively undisruptive if bridges etc are already built with the right clearances - would be "just" a case of turning up at night and driving piles etc.
Reconstructed bridges are electrification ready according to the TWA drawings. But not all the bridges are being reconstructed.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Reconstructed bridges are electrification ready according to the TWA drawings. But not all the bridges are being reconstructed.

Aha - so you'd have to reconstruct the bridges you didn't need to reconstruct the first time around.
 

47421

Member
Joined
7 Feb 2012
Messages
686
Location
london
Aha - so you'd have to reconstruct the bridges you didn't need to reconstruct the first time around.
yes pretty sure Roger Ford extracted from DfT a few years ago that E-W was being built with partial passive provision for electrification only
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,296
Aha - so you'd have to reconstruct the bridges you didn't need to reconstruct the first time around.
Yes, I had a very quick look and it could be a significant extra cost. I think maybe around 30-40% of the original overbridges are only due to get minor alterations and repairs.
 

dgl

Established Member
Joined
5 Oct 2014
Messages
3,066
Also I would assume if it was electrified before opening then it means you will probably have a good choice of EMU's that are sitting idle that could do with a home, whereas you might have to go for new stock if diesel power is the only option. Plus it adds an extra selling point to potential passengers (and I suppose people who live near the line) who would probably prefer a quieter and less polluting EMU.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,712
So unless they have sorted it in the background, the elephant in this room is the feeder? You aren't running it as an extension off the WCML so is the original plan "oven ready"?
 

MarkyT

Established Member
Joined
20 May 2012
Messages
7,586
Location
Torbay
So unless they have sorted it in the background, the elephant in this room is the feeder? You aren't running it as an extension off the WCML so is the original plan "oven ready"?
Where was the original site planned for this Grid feeder? Would the supply at the GW end be sufficient for EWR traffic, once Oxford is wired, or could it be augmented sufficiently? Alternatively, if EWR was to share a new feeder with HS2, could that be brought forward, opening intially for EWR?
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
Where was the original site planned for this Grid feeder? Would the supply at the GW end be sufficient for EWR traffic, once Oxford is wired, or could it be augmented sufficiently? Alternatively, if EWR was to share a new feeder with HS2, could that be brought forward, opening intially for EWR?
AIUI, the GWML site at Didcot (ATFS) is the main provider at the Oxford end; there's no OHNS northward so far.
Ledburn Jn (Leighton Buzzard area) ATFS provides the WCML, so I'd expect at least one neutral section overall.
Mind you, Calvert (HS2) also has an ATFS not too far from the intersection between EWR & HS2, so perhaps that could be used. (Then again, East Claydon Substation, south of Winslow, would probably be easiest. A new FS (AT or otherwise) could be established at Verney Jn.)

Looking at it from a 'NR Route' perspective, the "Western" route is fed by Didcot, the "Central" route from Calvert, and the "West Coast South" route from Ledburn. Extending to Bedford would draw power from Chalton ATFS (nr Sundon & M1 Toddington Services). All of these are 400kV National Grid connections, rated (IIRC) at 80MVA.
 
Last edited:

Cantab26

Established Member
Joined
9 Jun 2016
Messages
1,948
I would caution against getting too excited about this announcement for now.
 

SouthEastBuses

On Moderation
Joined
15 Nov 2019
Messages
1,800
Location
uk
@59CosG95 I know it's the usual question (my favourite) but will EWR, if it does get electrified, use Siemens Sicat, Bonomi Omnia, Alstom Clever or Furrer Frey Series 1?

I think Sicat should be the standard for any new electrification project, including EWR. Mast distance increased to 100m so think about how much money you're saying as you don't need to plant much masts as you used to do in the past.
 

mr_jrt

Established Member
Joined
30 May 2011
Messages
1,575
Location
Brighton
I have a sad suspicion that the job posting will be for work on Bedford to Cambridge, and possibly planning the design work for the rest.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,263
So unless they have sorted it in the background, the elephant in this room is the feeder? You aren't running it as an extension off the WCML so is the original plan "oven ready"?
AIUI, the GWML site at Didcot (ATFS) is the main provider at the Oxford end; there's no OHNS northward so far.
Ledburn Jn (Leighton Buzzard area) ATFS provides the WCML, so I'd expect at least one neutral section overall.
Mind you, Calvert (HS2) also has an ATFS not too far from the intersection between EWR & HS2, so perhaps that could be used. (Then again, East Claydon Substation, south of Winslow, would probably be easiest. A new FS (AT or otherwise) could be established at Verney Jn.)

Looking at it from a 'NR Route' perspective, the "Western" route is fed by Didcot, the "Central" route from Calvert, and the "West Coast South" route from Ledburn. Extending to Bedford would draw power from Chalton ATFS (nr Sundon & M1 Toddington Services). All of these are 400kV National Grid connections, rated (IIRC) at 80MVA.
There happens to be a Nat Grid feeder ("East Claydon") is helpfully located adjacent to the former Met. Granborough Road station that will feed HS2 and has spare capacity after that. Just 3/4 of mile along the old railway alignment to the former Verney Jn if you were looking to feed EWR...
(The HS2 feed is along the other direction of the former Met line alignment towards Quainton then straight lining the last bit to HS2)

400 kV substation at Cowley and the 400kV line runs along side the railway in Kennington - Hinksey and goes into tunneled cables next to Hinksey Yard (with isolators...)
132 kV substation at Yarnton Just North of Wolvercote Jn which is why there is interest in electrifying to Hanborough as it provides the feed and electrifies
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
@59CosG95 I know it's the usual question (my favourite) but will EWR, if it does get electrified, use Siemens Sicat, Bonomi Omnia, Alstom Clever or Furrer Frey Series 1?

I think Sicat should be the standard for any new electrification project, including EWR. Mast distance increased to 100m so think about how much money you're saying as you don't need to plant much masts as you used to do in the past.
Assuming it does, I think it'll be different equipment between "the routes", with "Western" opting to use Series 1. "Central" might well choose Sicat. Unfortunately, no design range in the UK has structure spacings of 100m - Sicat SX (used on the continent) I believe has only been modelled for it. Personally, I think if they do use Sicat, it'll be the SA range (already in UKMS). Plus, because SA's rated for 230 km/h, it's suitable for UKMS140 (225km/h), so it's unlikely that the innovations of SX will be ported to NR's range any time soon.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,914
Location
Cambridge, UK
I think (in relation to EWR) people are reading far too much into what is a just a job advert - which is inevitably trying to make the job sound as attractive and secure as possible.

Even just to make sensible 'passive provision' I suspect you need the involvement of OLE design engineers at some point.
 

SouthEastBuses

On Moderation
Joined
15 Nov 2019
Messages
1,800
Location
uk
There happens to be a Nat Grid feeder ("East Claydon") is helpfully located adjacent to the former Met. Granborough Road station that will feed HS2 and has spare capacity after that. Just 3/4 of mile along the old railway alignment to the former Verney Jn if you were looking to feed EWR...
(The HS2 feed is along the other direction of the former Met line alignment towards Quainton then straight lining the last bit to HS2)

400 kV substation at Cowley and the 400kV line runs along side the railway in Kennington - Hinksey and goes into tunneled cables next to Hinksey Yard (with isolators...)
132 kV substation at Yarnton Just North of Wolvercote Jn which is why there is interest in electrifying to Hanborough as it provides the feed and electrifies

Off topic I know but with that 132 KV substation in Yarnton, doesn't it make more sense to electrify to Banbury or even try to reach as far as Coventry, so you get introduce dual voltage EMUs on XC Manchester-Bournemouth. Plus the Cherwell Valley Line carries far more traffic than the Cotswold Line?


I think (in relation to EWR) people are reading far too much into what is a just a job advert - which is inevitably trying to make the job sound as attractive and secure as possible.

Even just to make sensible 'passive provision' I suspect you need the involvement of OLE design engineers at some point.

Still don't rule out electrification. Maybe not when it immediately opens but over the next years. I can think of other new railway lines in the UK that were temporarily run with DMUs before electrification - an example is the Edinburgh to Bathgate Line, initially opened in 2004 (?) With 156/158/170 DMUs, then electrified in 2010 and extended to Drumgelloch as a result of the Airdrie, and now run with 334 EMUs.

I guess the same could happen with EWR. Initially, as a temporary measure beginning with 165s, 168s and 170s, then with EMUs with who knows what (could be GWR 387s, could be LNWR 350s or 730s).
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,263
Off topic I know but with that 132 KV substation in Yarnton, doesn't it make more sense to electrify to Banbury or even try to reach as far as Coventry, so you get introduce dual voltage EMUs on XC Manchester-Bournemouth. Plus the Cherwell Valley Line carries far more traffic than the Cotswold Line?
You going to need another feed further north any way. A key performance issue on the corridor is the DMU stopping service from Didcot - Oxford, extending to Hanborough to reverse there (timings work well) and electrifying it solve some of the Oxford area performance issues, hence the benefit (outside of EWR) of electrifying Didcot - Hanborough
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,864
Location
Beeston (Notts)
You going to need another feed further north any way. A key performance issue on the corridor is the DMU stopping service from Didcot - Oxford, extending to Hanborough to reverse there (timings work well) and electrifying it solve some of the Oxford area performance issues, hence the benefit (outside of EWR) of electrifying Didcot - Hanborough
That 132kV sub in Yarnton's only planned, isn't it? Nothing on Google Maps shows it yet.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,263
That 132kV sub in Yarnton's only planned, isn't it? Nothing on Google Maps shows it yet.
Have a look at the industrial estate next to the "Banbury" line next to the A44 Woodstock Road bridge ;)
 
Status