But the Brum-Liverpool services are running as 8-car trains so there aren't units available.In the short-term, the WMR class 350 units not currently needed for the Birmingham-Liverpool service (which is now only hourly) could be used on an hourly Birmingham-Manchester service, almost immediately. In the longer term, West Midlands Trains has announced it will be replacing the Class 350/2 units with Class 730 Aventras; why not retain the class 350/2 units and refurbish them for further use?
And "almost immediately" is a bit optimistic given the need to reach agreements between the TOCs concerned and route learning etc.
== Doublepost prevention - post automatically merged: ==
What units would you use for the Avanti service?In my opinion, I would get rid of XC from the Brum-Manc route and split it. If possible running the following patterns:
This provides far better capacity on what is really an ICWC corridor, with the LNW service enabling better use of commuter capacity.
- Avanti West Coast London-Brum-Manc (with services calling at Wolverhampton, Stafford, Stoke, Macclesfield, Stockport)
- Extend the LNW Northampton-Birmingham to Manchester via Stoke (with services calling at stations such as Smethwick Galton Bridge, Wolverhampton, Stafford, Stone, Stoke, Congleton, Macclesfield, Cheadle Hulme, Stockport)
Running LNW units through New Street was a disaster last time they tried. Why repeat it?
In the long term of course Manchester should have through services to Bristol and Oxford/Reading etc. (probably having to use bi-modes). In the short term, in order to reduce carbon and improve capacity elsewhere, I can see merit in splitting off Brum-Manchester. Whether New Street could cope is another matter . . .
Last edited: