In view of the desire for another fast service along the Hope Valley, but with track capacity/signalling currently preventing this, would a skip-stop arrangement between 3 semi-fast services, similar to the Man Airport and Standedge lines, be a good solution for adding more capacity to the Manchester to Sheffield stretch?
The Northern stopper would be cut back and instead run as a shuttle to New Mills Central or Chinley. However, three trains per hour would call at Stockport, then onwards to New Mills South Junction and then each would call at 3 stations between there and Sheffield. Something like:
1. Chinley, Edale, Hope
2. Chinley, Bamford, Dore
3. Hathersage, Grindleford, Dore
These would be the existing TPE and EMR services, with the additional one perhaps operated by Northern to Sheffield only. Class 185s and 195s would be used to ensure rapid acceleration from the stations and minimal station dwell times. The disadvantages of losing the all-stops service, removal of direct trains between Sheffield/Hope Valley and the Marple line and the moderate slowing down of journey times between Manchester and Sheffield would be beset by more capacity for Manchester-Sheffield and Dore and Chinley passengers than at present and a more frequent meaningful service (ie. not including one that takes nearly 2 hours!). Well thought-out ticket planning could allow for permitted connections such as Chinley-Grindleford via Dore or Sheffield.
Are there any major drawbacks to this idea? Would this conflict with the freight path any more than the current services do?
The Northern stopper would be cut back and instead run as a shuttle to New Mills Central or Chinley. However, three trains per hour would call at Stockport, then onwards to New Mills South Junction and then each would call at 3 stations between there and Sheffield. Something like:
1. Chinley, Edale, Hope
2. Chinley, Bamford, Dore
3. Hathersage, Grindleford, Dore
These would be the existing TPE and EMR services, with the additional one perhaps operated by Northern to Sheffield only. Class 185s and 195s would be used to ensure rapid acceleration from the stations and minimal station dwell times. The disadvantages of losing the all-stops service, removal of direct trains between Sheffield/Hope Valley and the Marple line and the moderate slowing down of journey times between Manchester and Sheffield would be beset by more capacity for Manchester-Sheffield and Dore and Chinley passengers than at present and a more frequent meaningful service (ie. not including one that takes nearly 2 hours!). Well thought-out ticket planning could allow for permitted connections such as Chinley-Grindleford via Dore or Sheffield.
Are there any major drawbacks to this idea? Would this conflict with the freight path any more than the current services do?