bussnapperwm
Established Member
- Joined
- 18 May 2014
- Messages
- 1,527
I was having a think of this and if things got so bad emissions wise that Andy Street demanded that the government started electrifying the Snow Hill lines in Brum, where would the logical place to start the first phase of it be?
For me I would ask, would Smethwick to Stourbridge be the logical start point of wiring the Snow Hills? (Thus providing a chance for when the Smethwick to Snow Hill/Moor St bit gets started, trains can run into city still, albeit New Street when the Snow Hill to Smethwick is closed) or would Stratford to Birmingham be a better first option?
The reason I thought of Smethwick to Stourbridge was mainly as the wires can then link to the existing electrics at Smethwick
For me I would ask, would Smethwick to Stourbridge be the logical start point of wiring the Snow Hills? (Thus providing a chance for when the Smethwick to Snow Hill/Moor St bit gets started, trains can run into city still, albeit New Street when the Snow Hill to Smethwick is closed) or would Stratford to Birmingham be a better first option?
The reason I thought of Smethwick to Stourbridge was mainly as the wires can then link to the existing electrics at Smethwick