The contingency plan at the moment is as follows, according to Scot-rail.co.uk:
I believe that once ten 380s are in service (which doesn't sound like being too far off from what you're saying), then the "half" timetable published by Scotrail will run, which features:
Then, once the 380s fully enter service, a full service can operate on A-B:
Airdrie-Balloch half-hourly
Edinburgh-Milngavie, limited stop, half-hourly
Edinburgh-Helensburgh, all stops, half-hourly
This combines to give a 4tph service across the new line and at Bathgate station throughout the day.
I believe your post is right; so there will be no 380s in use come Sunday or Monday! That said, four will be diagrammed somewhere but won't operate yet. I'd be surprised if they didn't get some in service by the end of the year, and I doubt that the contingency plan outlined above (with only an hourly service between Edinburgh and Airdrie) will last for long.
- Friday's Grand Opening has been axed
- A full service will operate between Airdrie and Helensburgh/Balloch/Milngavie, as per usual.
- A full service (as timetabled) will operate between Edinburgh and Bathgate, using a mixture of DMUs and Class 334 EMUs.
- An hourly service (as an extension of one of the above) is expected to operate between Edinburgh and Airdrie calling at all stations
I believe that once ten 380s are in service (which doesn't sound like being too far off from what you're saying), then the "half" timetable published by Scotrail will run, which features:
- A full service from Airdrie to the West
- A half-hourly Helensburgh-Edinburgh service calling at all stations
- Services from Milngavie (which form limited stop runs to Edinburgh) will terminate at High Street as per now
- An increased service to Bathgate will be provided with DMUs
Then, once the 380s fully enter service, a full service can operate on A-B:
Airdrie-Balloch half-hourly
Edinburgh-Milngavie, limited stop, half-hourly
Edinburgh-Helensburgh, all stops, half-hourly
This combines to give a 4tph service across the new line and at Bathgate station throughout the day.
I believe your post is right; so there will be no 380s in use come Sunday or Monday! That said, four will be diagrammed somewhere but won't operate yet. I'd be surprised if they didn't get some in service by the end of the year, and I doubt that the contingency plan outlined above (with only an hourly service between Edinburgh and Airdrie) will last for long.