• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Restoring your Railways: Winning schemes announced

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,132
Where the ELR shed is, to the south of Bury Bolton Street.
BURY?? Surely one means Burnley, or was it Blackburn, or Bolton, or Blackpool, or Barrow .... Blah, blah, blah ... (Chancellor of the Ex-checker interviewed in the excellent Bury 'Burnley' Market this morning ;)
 
Last edited:

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,131
Did any local MP or council think of applying for that under the Restoring your Railways fund? If no-one submitted a proposal for it the first place, then it's rather obviously not going to go anywhere, irrespective of any other considerations like numbers of marginal constituencies!
This makes the point that no one at the DfT is proactively planning any rail reopening schemes as part of a national plan unlike what is happening in Scotland. Local areas in England don't have to bid for funding for business cases for road schemes.
 

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,132
Pretty unlikely to run through to central - as I understand it the slow services will all link up to make a Cardiff-Penzance service, which would be the obvious place to put these 2 stops. With 5tph planned between St Davids and Central (2x Paignton, Barnstaple, Okehampton, Waterloo) it isn't a very painful change.

I could see Wellington - Exeter being pretty popular - Taunton isn't the most attractive of places, and Exeter will be less than 30 mins away - much faster than the road. I would imagine both stations would do well for long-distance travel as well, with a simple change at Taunton for Paddington and XC services.
A couple of observations-

Remember- the 'starting point' is restoring/ reversing/ undoing 'Beeching'

The questions you ask are amongst the many that could/ should be considered in a business case and then the feasibility of a particular proposals.

As many contributors here observe often, there's a lot of fanciful/ unrealistc/ 'good old days' stuff about. Whatever goes forward has to be capable of being presented by 'the powers that be' as a great investment, offering a great 'return' however presented- financial, political, maybe (?) 'social', eg 'levelling up', just maybe also technological eg 'green' (hydrogen?) ...

My own 'take' on this to look at the electoral map, an that's it!
Looks like I got it,

and this ...
In my area seem to have got 2 feasibility studies for station reopening

Corsham, a town which has grown hugely (especially if include a number of surrounding small towns and villages), and for many, lot easier to get to than Bath or Chippenham stations which are in traffic congested areas. Oddly initial drawings seem to include huge footbridges with lifts, car parks on site of old stone yard (which served the Bath stone quarries), but short platforms. There is an artists impression in local newspaper link



Stonehouse (Bristol Road), the old Midland Railway site, which was also junction for Nailsworth branch. (The other station is on former GW Golden Valley line). There has been huge developments in the area (north of Yate) so is seen as a big commuter railhead to Bristol. Area even has the upcoming football team Forest Green Rovers. Clearly as it was formally a junction with lots of space, it would not be that hard to have a third platform with middle one available for local terminating trains from Bristol (so as not to block lines)

Both are sensible, effectively mini parkway stations for the areas around (and thus serving considerably more than the immediate town). Both are clearly aimed at Bristol commuting.

Although both sites have lost their platforms, I do not know if they were completely removed, or if the platform edge foundations still exist which might make it easier to rebuild.
and a reminder that this is a list from THREE rounds of BIDS- each submissions requires a lot of time, energy, words, lobbying, ie COST that 'winning' politicos will take credit for and have YOU the council tax payer pay for, including MORE expenditure yet in the FURTHER studies and 'justifications' that consultants will have to be paid well to come up with convincingly.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,816
Are the planned Paddington-Bristol Parkway-Bristol TM trains now running?

No. Personally, I can’t see them returning in the near future.

Reinstating the Newmarket West Curve at Chippenham would be a obvious one for the region especially with the Soham station opening soon.

So obvious that nobody proposed it. But in any event it couldn’t be used without Ely being sorted.

This makes the point that no one at the DfT is proactively planning any rail reopening schemes

They are. Several.

Local areas in England don't have to bid for funding for business cases for road schemes.

They do for local road schemes.


I see the Fleetwood branch didn't make the list, maybe next time if there is one

It was already in the ‘system’ as an ‘Advanced proposal’, so no need to be submitted again (although that didn’t stop some proposals!) Although I can’t see it going any further. Too many issues that are difficult to resolve.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,056
Location
Reston City Centre
This makes the point that no one at the DfT is proactively planning any rail reopening schemes as part of a national plan unlike what is happening in Scotland

Why should anyone be proactively planning reopenings though?

Unless you start from the position of "we must re-open old lines, because re-opening old lines is a goal in itself, rather than just one tool that can be used to tackle problems"

Fine if you want to consider how we improve the railway/ tackle bottlenecks/ increase speeds/ resolve reliability etc - reopening an old line is one option - but I don't agree that we should be starting off with Which Old Line Can We Reopen as a first objective

this is a list from THREE rounds of BIDS- each submissions requires a lot of time, energy, words, lobbying, ie COST that 'winning' politicos will take credit for and have YOU the council tax payer pay for, including MORE expenditure yet in the FURTHER studies and 'justifications' that consultants will have to be paid well to come up with convincingly.

Agreed - I guess that spending hundreds of thousands of pounds on consultants to re-re-review lines with pretty marginal cases is "cheap" for the political goodwill that it generates

(looking at how the "New Headquarters For GBR" debate got lots of regional chatter - even though most of these places won't see any scraps from the table)

It doesn't really help the railways, it's just a waste of attention/ money/ focus, it should really be paid from a "politics" budget rather than coming from a "railway" budget since it isn't really helping the railway, it's just giving politicians something to be seen to "fight" for, in the hope of positive local press attention
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,131
The DfT should be proactively planning rail reopenings because rail is more environmentally friendly than road. Also road traffic congestion costs billions. Many of the lines which Beeching recommended for closure were basket cases but many people including myself think that the closures went too far. The Government claims that Reversing Beeching is one of its policies. It could do far more to implement that policy. Too few lines are being reopened and the reopenings that are happening are taking far too long to come to fruition.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
The DfT should be proactively planning rail reopenings because rail is more environmentally friendly than road. Also road traffic congestion costs billions.

OK to do that you need to identify where this is a problem, and determine that rail will achieve this objective, as opposed to another solution.

Understanding the problem comes before determining the solution.

"Reopening" a 30mph meandering branchline (for no other reason than it used to exist) won't necessarily achieve that if it is up against a 70mph Motorway.

Look at East West Rail. That's not a "reopening". It's wholly newly engineered line to compete with the road journey (but coincidentally happens to use a decent chunk of the old railway alignment)
 

BrianW

Established Member
Joined
22 Mar 2017
Messages
2,132
Why should anyone be proactively planning reopenings though?

Unless you start from the position of "we must re-open old lines, because re-opening old lines is a goal in itself, rather than just one tool that can be used to tackle problems"

Fine if you want to consider how we improve the railway/ tackle bottlenecks/ increase speeds/ resolve reliability etc - reopening an old line is one option - but I don't agree that we should be starting off with Which Old Line Can We Reopen as a first objective



Agreed - I guess that spending hundreds of thousands of pounds on consultants to re-re-review lines with pretty marginal cases is "cheap" for the political goodwill that it generates

(looking at how the "New Headquarters For GBR" debate got lots of regional chatter - even though most of these places won't see any scraps from the table)

It doesn't really help the railways, it's just a waste of attention/ money/ focus, it should really be paid from a "politics" budget rather than coming from a "railway" budget since it isn't really helping the railway, it's just giving politicians something to be seen to "fight" for, in the hope of positive local press attention
tbtc- greetings to Reston- QED!

Do we know if, and if so, how many, well- motivated and qualified people have been diverted from work on whatever the latest iteration of an Integrated Rail Plan, which I note was mentioned by the Chancellor of the Exchequer in his Budget/ Spending Review speech only in that it would 'follow' at some undefined time in the future- shortly, in the fullness of time ... all paid for by us

Do we know if he mentioned anything about TRU, NPR, HS2 to be or not 2b while in Bury, aka Burnley, wherever the whippets, pigeons, cloth caps, black pudding is on a Wednesday Thursday; did he visit the East Lancs Railway too to show the future for fossil-fuelled steam on those unBeechinged lines?

Did no-one sbmit a case for re-opening to Uxbridge- High Street, Vine Street, both, ... and onward to Poyle Halt for Staines West Parkway and Terminal 6 ...?
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,277
Location
Bolton
This makes the point that no one at the DfT is proactively planning any rail reopening schemes as part of a national plan unlike what is happening in Scotland. Local areas in England don't have to bid for funding for business cases for road schemes.
I don't understand. There are several new railways for England & Wales in long term planning right now! The Northumberland line, HS2 Phase 1, Barking Riverside, and East West Rail Stage One are under construction. Portishead - Bristol is very well advanced by the WECA, Southampton - Fawley has made significant progress just now. There are a significant number of others that have also been studied and have reasonable prospects. Unfortunately many of the winners definitely don't but all the same.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,816
Do we know if, and if so, how many, well- motivated and qualified people have been diverted from work on whatever the latest iteration of an Integrated Rail Plan

If you mean diverted from IRP to Restoring Your Railway - I think I can confidently say none.

There are several new railways for England & Wales in long term planning right now! The Northumberland line, HS2 Phase 1, Barking Riverside, and East West Rail Stage One are under construction. Portishead - Bristol is very well advanced by the WECA, Southampton - Fawley has made significant progress just now.

And Okehampton reopens in 3 weeks!
 

NoRoute

Member
Joined
25 Nov 2020
Messages
504
Location
Midlands
OK to do that you need to identify where this is a problem, and determine that rail will achieve this objective, as opposed to another solution.

Understanding the problem comes before determining the solution.

The problem with that approach is that it assumes UK railway provision is somehow logical and rational, that there's some underlying decision process for which cities, towns and villages get rail services and which don't and how good those services and connections are. But when you look at the UK rail network as it stands today, there's very little logic or reason to it's design, it's a patchwork quilt of different historical lines and stations and whether a town or village has a station, or the quality of its connections is determined more by shear luck about what was happening in the 1960s when the network was rationalised.

The Beeching Report was released in the early 1960s, that's 60 years ago, many towns and cities have changed dramatically, some are entirely new, others have grown massively, some have grown little or even shrunk. Freight flows have changed, commuting flows have changed. You can find towns and cities of comparable size, some with lots of connections, others with next to none.

So it ends up with the situations where access to a good rail services depends more on grand-father rights, of having inherited one from the 1960s, than it being justified today by a logical decision process.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,816
So it ends up with the situations where access to a good rail services depends more on grand-father rights, of having inherited one from the 1960s, than it being justified today by a logical decision process.

Agreed, but none of that justifies not using so und, logical analysis for future railways.
 

NoRoute

Member
Joined
25 Nov 2020
Messages
504
Location
Midlands
Agreed, but none of that justifies not using so und, logical analysis for future railways.
But it then creates a real and justified sense of unfairness when communities which don't have access to decent rail services face very high, often insurmountable hurdles, to get a station or a new service, whereas communities which already have them get to retain theirs with no questions asked.

If you have rules and apply them fairly, then there are lines and stations which are open today which logically should be closed.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,277
Location
Bolton
But it then creates a real and justified sense of unfairness when communities which don't have access to decent rail services face very high, often insurmountable hurdles, to get a station or a new service, whereas communities which already have them get to retain theirs with no questions asked.

If you have rules and apply them fairly, then there are lines and stations which are open today which logically should be closed.
The hurdles are high because there's next to no capital available. The government does not particularly want to spend much on anything.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,524
Location
Northampton
If you have rules and apply them fairly, then there are lines and stations which are open today which logically should be closed.
I agree with you. However it's the politicians who ultimately decide what the rules are.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,277
Location
Bolton
But it then creates a real and justified sense of unfairness when communities which don't have access to decent rail services face very high, often insurmountable hurdles, to get a station or a new service, whereas communities which already have them get to retain theirs with no questions asked.

If you have rules and apply them fairly, then there are lines and stations which are open today which logically should be closed.
Personally I think that we should just bite the bullet and shut some old lines, re-investing the operating and maintenance spending elsewhere. But that's just too tricky.
 

NoRoute

Member
Joined
25 Nov 2020
Messages
504
Location
Midlands
The hurdles are high because there's next to no capital available. The government does not particularly want to spend much on anything.
Well looking at transport investment across the country that's not the case because there is capital investment in many large programmes particularly in London and the South East, what there isn't is consistent and equal levels of investment, per head, across the country.
 

stuu

Established Member
Joined
2 Sep 2011
Messages
3,766
Well looking at transport investment across the country that's not the case because there is capital investment in many large programmes particularly in London and the South East, what there isn't is consistent and equal levels of investment, per head, across the country.
Ongoing programmes in London and the South East? Such as?

It is undoubtedly true that it has been the case in the past decade that London has had a massive proportion of the expenditure, but there is a vanishingly small chance that will be true in the current decade

== Doublepost prevention - post automatically merged: ==

The hurdles are high because there's next to no capital available. The government does not particularly want to spend much on anything.
Much as I dislike the current government, £44bn is not "next to no capital". By any definition
 

camflyer

Member
Joined
13 Feb 2018
Messages
1,165
OK to do that you need to identify where this is a problem, and determine that rail will achieve this objective, as opposed to another solution.

Understanding the problem comes before determining the solution.

"Reopening" a 30mph meandering branchline (for no other reason than it used to exist) won't necessarily achieve that if it is up against a 70mph Motorway.

Look at East West Rail. That's not a "reopening". It's wholly newly engineered line to compete with the road journey (but coincidentally happens to use a decent chunk of the old railway alignment)

Very true - but "reopening" a line is politically easier to sell than a brand new alignment across green fields.

What should matter is what lines are needed now. Not where they were more than half a century ago. If old winding rural lines still exist then they would be better made into cycling routes
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,816
But it then creates a real and justified sense of unfairness when communities which don't have access to decent rail services face very high, often insurmountable hurdles, to get a station or a new service, whereas communities which already have them get to retain theirs with no questions asked.

Sense of unfairness, but not logical.

If you have rules and apply them fairly, then there are lines and stations which are open today which logically should be closed.

But it is a lot easier to justify economically a rail service when you don’t have to build anything to operate it. This is the key issue - building is expensive. (And not just railways)

== Doublepost prevention - post automatically merged: ==

Very true - but "reopening" a line is politically easier to sell than a brand new alignment across green fields.

Many ‘reopenings’ do involve brand new alignments across green fields. Even the Robin Hood line had some of this.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,277
Location
Bolton
Much as I dislike the current government, £44bn is not "next to no capital". By any definition
Split across five years and more than 60 million people it comes to remarkably little.

In any case that money is already committed. There is going to be more needed for further additions to the network.
 

Irascible

Established Member
Joined
21 Apr 2020
Messages
2,233
Location
Dyfneint
While what we're getting so far really are reopenings ( for business at least ), anything that's been pulled up in the mid 60s is far beyond a "reopening" - so why aren't they talking it up as "Look at our plans for new railways!". And then they could actually check where a line really needs to go instead of where it went. HS2 and the east end of EWR will be mostly genuinely new railway - I feel like not enough has been made of the latter ( HS2 is a little bit special as a new type of railway to most of the country ). We too, should look at these proposals as brand new. You can always spin it as giving something back to a place that it once had anyway.

Not quite sure of the funding for Wellington & Cullompton stations, but given there's huge housing development going on in both places I doubt taxpayers are going to foot all of it.

And Okehampton reopens in 3 weeks!

*Sticks head out door* that's assuming Cowley isn't washed out inbetween...
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
Where is Buckley Wells? Couldn't find any mention on Google maps, so assumed it was something to do with Bury
Just south of Bury town centre as the other user said, where the ELR and Metrolink interchange. Proposed to be a Metrolink stop there to plug the large gap between Bury Interchange and Prestwich in future.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,162
Personally I think that we should just bite the bullet and shut some old lines, re-investing the operating and maintenance spending elsewhere. But that's just too tricky.
Or we could level the costs of private and public transport by using single occupancy vehicle tolls to push people onto the railways?
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,277
Location
Bolton
Or we could level the costs of private and public transport by using single occupancy vehicle tolls to push people onto the railways?
It would be far better to do that yes. However that's even less on the table than closing little used lines is.
 
Status
Not open for further replies.

Top