You are right. Also, the camera is located in front of it on 001, and behind it on 002.Is it just me, or does the side window for the driver on the right look bigger on 730001 than on 730002?
It’s one of the few differences between the two units.
You are right. Also, the camera is located in front of it on 001, and behind it on 002.Is it just me, or does the side window for the driver on the right look bigger on 730001 than on 730002?
It’s one of the few differences between the two units.
Yes. 730002 should look the same soon (most likely already does) as it went back to Derby for new cabs earlier in the year.Is it just me, or does the side window for the driver on the right look bigger on 730001 than on 730002?
Only between Crewe - Nuneaton atm I believe.Are any of the units being tested around Birmingham yet?
Ah yes, another useless scrolling mini-display.
West Midlands Trains (WMT) has 26 CAF class 196 Civity DMUs and 81 Alstom (formerly Bombardier Transportation) class 730 Aventra EMUs on order, a total of 333 vehicles. Abellio has operated WMT since December 2017.
“The delayed introduction of both fleets is down to the impact of Covid-19, both on the manufacturing and testing processes and also on driver training,” says WMT spokesman, Mr Andrew McGill.
WMT has three sub-classes of the Alstom class 730 EMU on order, with 36 three-car sets due to have begun entering service from May 3 2020, followed by two five-car fleets entering traffic from October 18 2020. All should have been service by May 2 2021. These EMUs are from the Aventra design, with the order placed with Bombardier Transportation prior to its sale.
Testing of the class 730s has begun, but from an order of 81 trains only seven have been completed.
“Progress is continuing, and we are expecting the first class 730/0 unit into passenger service towards the end of 2022 / beginning of 2023,” says McGill. “These three-car units will serve the Cross City Line (Lichfield Birmingham – Bromsgrove/Redditch).” He gave no date for the five-car EMUs.
Surely introduction of the first unit by the end of 2022 can't be right? That's a year away, and they're already being tested now (and have been for some time).![]()
New British train fleets to enter service two years late
Two new British fleets that were due to enter traffic in 2020 will start carrying passengers from next year, two years later than planned.www.railjournal.com
Surely introduction of the first unit by the end of 2022 can't be right? That's a year away, and they're already being tested now (and have been for some time).
No they haven’t. They only started mile runs 2 - 3 weeks ago.Surely introduction of the first unit by the end of 2022 can't be right? That's a year away, and they're already being tested now (and have been for some time).
You did, some test runs are happening today. Unfortunately I'm unable to see themThink I saw a 730 at Kings Norton en route to Redditch earlier!
I didn't know they were happening either, I'm currently on a little bus/train bash around the West Midlands.You did, some test runs are happening today. Unfortunately I'm unable to see them![]()
Unfortunately I suspect your assessment will probably turn out to be realistic but these should be production run trains that just roll off the line get commissioned and tested at Derby and are straight into traffic. EasyJet send a crew out to Hamburg who fly a 320 back to Luton its in traffic the next day not 10,000miles fault free not even 1 mile thats where the industry needs to get to. This is an issue for GBR to resolve with the operators, unions and the manufacturer and by the time GBR is in the driving seat.It strikes me as realistic - in one year they've got to finish type testing and get them accepted by WMR, build enough units and have them complete fault free running, plus training of enough drivers and other staff. As it notes, only seven trains have been built, across both the WMR and LNWR fleets, with the latter WMR units having a completely different cab to the first unit that emerged. If nothing else, experience at GA and SWR shows that this process will drag on beyond any hope of reasonable-worst-case
That is a bit strange. Gibbet Hill Jn wasn't wired the last time I went over it. Might it be Coventry South yard where the unit changes ends ?730001 today Tuesday 23rd November 2021.
And solo was doing test runs between redditch and bromsgrove and Birmingham new Street in particular.
The 1255 from bromsgrove to gibbet Hill Junction called at barnt green and tested the doors open and close whilst closed in the station.
Pretty sure that a plane has plenty of flying hours in testing prior to being delivered to the client. Not as if it's rolled out of the factory, received it's paint job and given to EJ to fly.Unfortunately I suspect your assessment will probably turn out to be realistic but these should be production run trains that just roll off the line get commissioned and tested at Derby and are straight into traffic. EasyJet send a crew out to Hamburg who fly a 320 back to Luton its in traffic the next day not 10,000miles fault free not even 1 mile thats where the industry needs to get to. This is an issue for GBR to resolve with the operators, unions and the manufacturer and by the time GBR is in the driving seat.
Yes that's correct it was only what the move on www.realtimetrains.co.uk was showing for reference.That is a bit strange. Gibbet Hill Jn wasn't wired the last time I went over it. Might it be Coventry South yard where the unit changes ends ?
Don't you mean:Is it not about the left window? I think I can just about make out ‘Not in Service’.
Unfortunately I suspect your assessment will probably turn out to be realistic but these should be production run trains that just roll off the line get commissioned and tested at Derby and are straight into traffic. EasyJet send a crew out to Hamburg who fly a 320 back to Luton its in traffic the next day not 10,000miles fault free not even 1 mile thats where the industry needs to get to. This is an issue for GBR to resolve with the operators, unions and the manufacturer and by the time GBR is in the driving seat.
As the assembly line ramps up and each new aircraft destined for an airline or corporate customer rolls out, it undergoes production and customer flight tests that conclude with the granting of an Airworthiness Certificate that’s unique to each new plane.
It ran to ground signal 1525, then back into Coventry via the cross over. Didn't get anywhere near Gibbet Hill Jct thankfully!Yes that's correct it was only what the move on www.realtimetrains.co.uk was showing for reference.
I think they are just at Oxley for testing, I think Soho will be there main basewill the 730s be maintained at oxley and soho depots when they enter service between 2022 and 2023?
Good question. Duddeston was chosen then abandoned, then Bescot was chosen, but since then nothing.will the 730s be maintained at oxley and soho depots when they enter service between 2022 and 2023?
730001 + 730003 were on test today between Crewe and Nuneaton. Saw them at Stafford three times were they were using P1 and P3 to dest the doorsGood afternoon 543H 1155 old dalby to oxley car md move today was 37611 Van's with 730101 lnwr livery 22 early leaving old dalby coming through melton mowbray earlier on.
However 730101 back at oxley.
== Doublepost prevention - post automatically merged: ==
Good afternoon another move today 592H 1155 old dalby with 37611 and same barrier vehicles saw 730103 being delivered to oxley 25 minutes late at Wolverhampton.
730103 now at oxley as well.
== Doublepost prevention - post automatically merged: ==
Ie 592h 1155 old dalby to oxley car md Depot.
== Doublepost prevention - post automatically merged: ==
Tuesday 14th December 2021 for 730103.
Yes. 730001 saw at barnt green also approximately 3 weeks ago on test on solo workings also called and tested the doors.730001 + 730003 were on test today between Crewe and Nuneaton. Saw them at Stafford three times were they were using P1 and P3 to dest the doors