General observation on the proposals. There are various options for a new road to avoid the Queen Adelaide level crossings. Options 2 and 3 - the Northern and Long Southern by-passes - look like they'll considerably speed up road journeys for all through traffic through Queen Adelaide. And while I appreciate we need to do something to avoid longer waits at the level crossings if there are more trains, that surely is going to encourage more car journeys and some rail-to-road modal shift. Options 1 and 4 less so. For some journeys actually to Queen Adelaide, there'll likely still be longer level crossing waits - which isn't going to be that good for locals (who have no option for rail travel), although balanced by that with some of the options there'll no longer be any through road traffic through the village. I can't help noticing the contrast between the idea to do some significant road-buliding and the lack of any proposal to grade separate any of the rail junctions in the area. That means that lots of road journeys will be sped up, rail journeys less so - and we still end up with a very large number of conflicting moves imposing heavy restrictions on the timetable. Not only that, but it looks to me like both of the Southern by-pass options will make it massively harder to grade-separate the rail junctions, in the event that we need further capacity increases at some point in the future, since with either option, the elevated by-pass would lie directly in the path of where an elevated rail track would need to go.
Further, it seems fairly reasonable to assume that if rail growth continues (Covid-blip aside), growth in Cambridge as a major employment centre continues, and if we want to continue to encourage a higher proportion of journeys to be made by rail. then within the next 10 years or so there'll be a need for 2 trains an hour from Cambridge to each of Peterborough, Kings Lynn and Norwich. And these plans don't actually give the capacity to provide that with the current service patterns (which is why earlier I was speculating about the future of the Norwich-Liverpool route).
Was there really no sensible way to do any rail grade separation at all within a similar budget to the cost of building new roads? And is there not a likelihood that what looks like a huge, expensive, project will just end up needing to be revisited in 10-15 years because it doesn't provide quite enough new capacity for decent Cambridge commuter links?
Ely North Junction upgrade proposals
http://www.cambridge-news.co.uk/Ely/4m-boost-to-rail-network-thanks-to-EU-10072012.htm "Almost £4 million of EU funding will be put towards upgrading the Ely North Junction. The European Parliament agreed to invest £3.8 million in the major scheme today (Tuesday). It comes just a week after the...
General observation on the proposals. There are various options for a new road to avoid the Queen Adelaide level crossings. Options 2 and 3 - the Northern and Long Southern by-passes - look like they'll considerably speed up road journeys for all through traffic through Queen Adelaide. And while I appreciate we need to do something to avoid longer waits at the level crossings if there are more trains, that surely is going to encourage more car journeys and some rail-to-road modal shift. Options 1 and 4 less so. For some journeys actually to Queen Adelaide, there'll likely still be longer level crossing waits - which isn't going to be that good for locals (who have no option for rail travel), although balanced by that with some of the options there'll no longer be any through road traffic through the village. I can't help noticing the contrast between the idea to do some significant road-buliding and the lack of any proposal to grade separate any of the rail junctions in the area. That means that lots of road journeys will be sped up, rail journeys less so - and we still end up with a very large number of conflicting moves imposing heavy restrictions on the timetable. Not only that, but it looks to me like both of the Southern by-pass options will make it massively harder to grade-separate the rail junctions, in the event that we need further capacity increases at some point in the future, since with either option, the elevated by-pass would lie directly in the path of where an elevated rail track would need to go.
Further, it seems fairly reasonable to assume that if rail growth continues (Covid-blip aside), growth in Cambridge as a major employment centre continues, and if we want to continue to encourage a higher proportion of journeys to be made by rail. then within the next 10 years or so there'll be a need for 2 trains an hour from Cambridge to each of Peterborough, Kings Lynn and Norwich. And these plans don't actually give the capacity to provide that with the current service patterns (which is why earlier I was speculating about the future of the Norwich-Liverpool route).
Was there really no sensible way to do any rail grade separation at all within a similar budget to the cost of building new roads? And is there not a likelihood that what looks like a huge, expensive, project will just end up needing to be revisited in 10-15 years because it doesn't provide quite enough new capacity for decent Cambridge commuter links?
Last edited by a moderator: