Was not the Atherton heavy rail line mentioned this week in the Manchester Recovery Taskforce consultation as "being saved" ?

I saw nothing in the consultation results document suggesting that Metrolinking it in future had been ruled out. I don't know what has been saved about it. Is this being confused with Southport to Oxford Road services perhaps?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
The tram takes about 15 minutes to travel from Piccadilly rail station to Cornbrook, and there is at least 5 minutes interchange time required at Piccadilly. It is quicker (as well as cheaper and more convenient) to travel by Metrolink the whole way from East Didsbury to Media City/Eccles by changing at Cornbrook. The East Didsbury to Piccadilly trains are irregular and infrequent.


There is capacity for the Glossop/Rose Hill services to be connected to existing Metrolink services terminating at Piccadilly without any need for additional infrastructure in Manchester city centre.
Irregular - 3tph an hour can hardly be described as irregular and 2tph stop at Deansgate. Cheaper and convenient yes, but easier to get the 1tph from Didsbury direct to Eccles, taking 26mins if time matters to you.
Where would you build a viaduct for these services to reach the Piccadilly Metrolink station under the main station, there is a 10 to 20 metre height difference? Either way, you're going to end up spending millions building a tunnel from either Piccadilly or Ardwick (tens of millions for the latter option.)
The whole object of changing the Glossop/Rose Hill services to tram train is to fit more services into Piccadilly and improve services to east Mcr/Tameside/east Stockport/the northern High Peak. No way to do that unless you build a tunnel from Ardwick, it's 0.6 miles of new 2 to 4 track tunnel, at least 20 million.

== Doublepost prevention - post automatically merged: ==

There are 10tph terminating at Picadilly as is, why can't they be extended to form the Rose Hill/Glossop?
Height difference between the railway and the Metrolink - for people who have clearly never used the Metrolink recently in Manchester, the railway and station is on a viaduct for a mile out and the Metrolink is underground here.

Longish tunnel (0.6 miles) needed between Ardwick and the city centre to see any benefit - no point doing this until the full tram train tunnel scheme is realised.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,604
Location
Dunham/Bowdon
Irregular - 3tph an hour can hardly be described as irregular and 2tph stop at Deansgate. Cheaper and convenient yes, but easier to get the 1tph from Didsbury direct to Eccles, taking 26mins if time matters to you.
Where would you build a viaduct for these services to reach the Piccadilly Metrolink station under the main station, there is a 10 to 20 metre height difference? Either way, you're going to end up spending millions building a tunnel from either Piccadilly or Ardwick (tens of millions for the latter option.)
The whole object of changing the Glossop/Rose Hill services to tram train is to fit more services into Piccadilly and improve services to east Mcr/Tameside/east Stockport/the northern High Peak. No way to do that unless you build a tunnel from Ardwick, it's 0.6 miles of new 2 to 4 track tunnel, at least 20 million.

== Doublepost prevention - post automatically merged: ==


Height difference between the railway and the Metrolink - for people who have clearly never used the Metrolink recently in Manchester, the railway and station is on a viaduct for a mile out and the Metrolink is underground here.

Longish tunnel (0.6 miles) needed between Ardwick and the city centre to see any benefit - no point doing this until the full tram train tunnel scheme is realised.
The train service from East Didsbury is irregular, in contrast to the regular tram service starting there which now runs every 6 minutes, with trams every 12 minutes on the Eccles line. In order to use the train service, one has to look up a timetable, and take note of where the train calls in central Manchester. The train times may not be particularly convenient for when one wishes to travel. It is not a simple to use "turn up and go" service, unlike Metrolink.

The Metrolink station at Piccadilly is not "underground", it is at street level. The simplest way to connect Metrolink to the ex-GC East Manchester suburban lines would be to build a tram line from the eastern portal of Piccadilly Metrolink station along or adjacent to Ashton Old Road as far as Ashburys, to join the railway lines to be converted to Metrolink there, via a short slope, which trams (but not trains) can handle perfectly well.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
The train service from East Didsbury is irregular, in contrast to the regular tram service starting there which now runs every 6 minutes, with trams every 12 minutes on the Eccles line. In order to use the train service, one has to look up a timetable, and take note of where the train calls in central Manchester. The train times may not be particularly convenient for when one wishes to travel. It is not a simple to use "turn up and go" service, unlike Metrolink.

The Metrolink station at Piccadilly is not "underground", it is at street level. The simplest way to connect Metrolink to the ex-GC East Manchester suburban lines would be to build a tram line from the eastern portal of Piccadilly Metrolink station along or adjacent to Ashton Old Road as far as Ashburys, to join the railway lines to be converted to Metrolink there, via a short slope, which trams (but not trains) can handle perfectly well.
There is no room there, there is the Manchester ROC signalling centre there at Ashburys on one side and the Siemens Longsight train depot on the other side of Gorton Road.

To get from the eastern side of Picc to Ashton Old Rd, you would have to build a chord at Great Ancoats St, where the tram is in an underpass (apartment building in the way), take 2 lanes off a higher speed ring road (Great Ancoats St, Manchester City Council would never accept that) and then completely close a mile of Ashton Old road - both sides are heavily built up and it's a single carriageway primary A road. There would be 6 an hour at the very least heading down this section, no way you could do that in mixed traffic with 6tph an hour.
Then you'd have to close Gorton Rd for a significant section, cutting off several businesses and a depot for the North West Electrification Project.

Here's an annotated image of the area's Streetview; Red is the tram exit from the undercroft of Piccadilly station, Yellow is the route the tram would have to take from the underpass to Ashburys and Green is Ashburys station.

ALT TEXT = Satellite image of Piccadilly/Ancoats/Ashburys area, showing difficulties of tram routing through the Ancoats area in order to convert Piccadilly to Glossop/Hadfield/Marple Rose Hill train services to tram/tram-train.
tram difficulties conversion.png
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,604
Location
Dunham/Bowdon
There is no room there, there is the Manchester ROC signalling centre there at Ashburys on one side and the Siemens Longsight train depot on the other side of Gorton Road.

To get from the eastern side of Picc to Ashton Old Rd, you would have to build a chord at Great Ancoats St, where the tram is in an underpass (apartment building in the way), take 2 lanes off a higher speed ring road (Great Ancoats St, Manchester City Council would never accept that) and then completely close a mile of Ashton Old road - both sides are heavily built up and it's a single carriageway primary A road. There would be 6 an hour at the very least heading down this section, no way you could do that in mixed traffic with 6tph an hour.
Then you'd have to close Gorton Rd for a significant section, cutting off several businesses and a depot for the North West Electrification Project.

Here's an annotated image of the area's Streetview; Red is the tram exit from the undercroft of Piccadilly station, Yellow is the route the tram would have to take from the underpass to Ashburys and Green is Ashburys station.
The tram route would not have to use Great Ancoats Street, it could join Fairfield Street/Ashton Old Road nearer to the city centre, albeit 1 or 2 buildings might need to be (partly) demolished to access the eastern portal of the Piccadilly tram station. There is no real difference between running trams at 10 tph mixed with ordinary traffic along Ashton Old Road and running them at 10 tph mixed with ordinary traffic along Ashton New Road, which already has a street tramway. Similarly there would be no need to close Gorton Road to other traffic. Where there's a will, there's a way; it would be a tramway, not a heavy rail line.
 
Last edited:

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
The tram route would not have to use Great Ancoats Street, it could join Fairfield Street/Ashton Old Road nearer to the city centre, albeit 1 or 2 buildings might need to be (partly) demolished to access the eastern portal of the Piccadilly tram station. There is no real difference between running trams at 10 tph mixed with ordinary traffic along Ashton Old Road and running them at 10 tph along Ashton New Road, which already has a street tramway. Similarly there would be no need to close Gorton Road to other traffic.
Any closer to the city centre and you hit the site of the HS2 underground/overground station at Piccadilly, which is currently Network Rail's offices,.
Once you start demolishing buildings with compulsory purchase orders (and remember this area has a lot of new expensive apartments as part of the regeneration of Ancoats and the arrival of the Ashton line tram), then it's going to get towards 5 mil alone on compulsory purchase, plus a mile of new tram infrastructure (estimated at 13million in a recent study) and you're starting to approach the 40 to 50 million cost of the tram tunnel under Mcr and Salford city centres.
When the Ashton line was built, traffic was diverted from the Ashton New Road to the Ashton Old Road, as a result, it now has double the traffic it previously did.
Go to Edinburgh and ride the on street sections of the tram if you want to see what happens when you ram 10tph of trams down a heavily congested road.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
Any closer to the city centre and you hit the site of the HS2 underground/overground station at Piccadilly, which is currently Network Rail's offices,.
Once you start demolishing buildings with compulsory purchase orders (and remember this area has a lot of new expensive apartments as part of the regeneration of Ancoats and the arrival of the Ashton line tram), then it's going to get towards 5 mil alone on compulsory purchase, plus a mile of new tram infrastructure (estimated at 13million in a recent study) and you're starting to approach the 40 to 50 million cost of the tram tunnel under Mcr and Salford city centres.
When the Ashton line was built, traffic was diverted from the Ashton New Road to the Ashton Old Road, as a result, it now has double the traffic it previously did.
Go to Edinburgh and ride the on street sections of the tram if you want to see what happens when you ram 10tph of trams down a heavily congested road.

The plan for HS2 includes provision for a new metrolink station east of Piccadilly, which would provide the route to the actual Piccadilly metrolink station.

I’m not sure Greater Manchester needs to look to Edinburgh for examples of how a tram line should or should not be built.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
The plan for HS2 includes provision for a new metrolink station east of Piccadilly, which would provide the route to the actual Piccadilly metrolink station.

I’m not sure Greater Manchester needs to look to Edinburgh for examples of how a tram line should or should not be built.
GM needs to look to other examples of transport implementation failures as it and every other conurbation would when extending a transit system. Either way, whichever way you get to Ashton Old Rd, it is not sensible to run trams down a heavily congested primary A road.
The tram train tunnel would sensibly take services underground at Ardwick, relocate the Piccadilly Metrolink interchange to underneath the site of Mayfield station (close to most of Picc station via footbridge, Metrolink could use the surface platforms, then continue on towards Market St and Salford Central/St Peter's Square, Cornbrook and Warrington Central.
 

daodao

Established Member
Joined
6 Feb 2016
Messages
3,604
Location
Dunham/Bowdon
Any closer to the city centre and you hit the site of the HS2 underground/overground station at Piccadilly, which is currently Network Rail's offices,.
Once you start demolishing buildings with compulsory purchase orders (and remember this area has a lot of new expensive apartments as part of the regeneration of Ancoats and the arrival of the Ashton line tram), then it's going to get towards 5 mil alone on compulsory purchase, plus a mile of new tram infrastructure (estimated at 13million in a recent study) and you're starting to approach the 40 to 50 million cost of the tram tunnel under Mcr and Salford city centres.
When the Ashton line was built, traffic was diverted from the Ashton New Road to the Ashton Old Road, as a result, it now has double the traffic it previously did.
Go to Edinburgh and ride the on street sections of the tram if you want to see what happens when you ram 10tph of trams down a heavily congested road.
There is no need for expensive tunnelling, either in Ardwick or under the city centre. I don't see the problem of running trams for a relatively short distance along Ashton Old Road. In order to reach the current Piccadilly tram station, trams could run along Fairfield Street and then branch off via Andrews Street, Travis Street and Sheffield Street to join the existing Metrolink line where it crosses Sheffield Street on the level. This area is mostly industrial and Google Streetview does not show any evidence of expensive apartments, so while the route might need straightening, few if any large buildings would need to be demolished. While I have suggested one option, if elements of it are sub-optimal, there are likely to be alternative options to build the link at street level without tunnelling, due to the ability of trams to interwork with other traffic. A tram tunnel under Manchester city centre is likely to cost well in excess of £100m at today's prices, not £40m to £50m.
 
Last edited:

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
28,767
Location
Nottingham
Several options have been looked at for connecting the Ashton Metrolink line to the Marple or Rose Hill lines, some of them by yours truly. It is possible without conflict with any major traffic flow. The journey time would be longer than a train into Piccadilly, but for people wanting to use the tram beyond Piccadilly, avoiding the change there would make their door-to-door journey quicker.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
There is no need for expensive tunnelling, either in Ardwick or under the city centre. I don't see the problem of running trams for a relatively short distance along Ashton Old Road. In order to reach the current Piccadilly tram station, trams could run along Fairfield Street and then branch off via Andrews Street, Travis Street and Sheffield Street to join the existing Metrolink line where it crosses Sheffield Street on the level. This area is mostly industrial and Google Streetview does not show any evidence of expensive apartments, so while the route might need straightening, few if any large buildings would need to be demolished. While I have suggested one option, if elements of it are sub-optimal, there are likely to be alternative options to build the link at street level without tunnelling, due to the ability of trams to interwork with other traffic. A tram tunnel under Manchester city centre is likely to cost well in excess of £100m at today's prices, not £40m to £50m.
It depends where TfGM put it. 20millon for a 1 mile tram spur down to Ashburys that actually makes journeys longer and more uncomfortable is a crappy deal. It's going to be at least 10 mins from Ashburys in to the CC on a tram, on a current Glossop/Rose Hill service you're already in the Flowery Field part of Hyde in Tameside by then.
If you want a temporary solution to more platform and throughput capacity, reopen Mayfield for Buxton/Glossop/Marple Rose Hill/New Mills Central/Sheffield/Crewe/Stoke-on-Trent services. That will remove a lot of services and the connector would be relatively cheap to build. My long-term preference is exactly the same as TfGM : build a tram train tunnel linking Marple Rose Hill/ New Mills Central/Glossop/Buxton lines to Warrington Central, Leigh and Wigan via Atherton on the other side. It would be much faster even on a Vossloh Citylink type vehicle for many of those lines, who currently suffer an absolutely atrocious journey time due to the Sprinters' atrocious acceleration mostly. An hour to Buxton for 26miles is a joke, even a tram train with a 60mph like the City link could achieve a faster average speed and interval than that.
A Sprinter won't hit much more than 60mph between Piccadilly and Stockport anyway, if it doesn't stop that it is.
That could be done now before a tram train tunnel is built, wires are already there Picc to Hazel Grove and Hazel Grove to Buxton could be done with standard 25kV wires at 6mil a mile (figures from Bolton to Wigan electrification), 16.5 miles to string up and relatively simple apart from Chapel ELF tunnel.

== Doublepost prevention - post automatically merged: ==

Several options have been looked at for connecting the Ashton Metrolink line to the Marple or Rose Hill lines, some of them by yours truly. It is possible without conflict with any major traffic flow. The journey time would be longer than a train into Piccadilly, but for people wanting to use the tram beyond Piccadilly, avoiding the change there would make their door-to-door journey quicker.
Where would you route it? Out to Ardwick? The tram to train change is no more than 5 mins for most lines at Picc anyway and those who wanted the tram from most of the areas near the Glossop/Marple Rose Hill/ New Mills Central services. In a couple years, bus/tram/rail fares will be properly integrated in GM, so anyone wanting a tram from Ashton direction can grab a 53 Orbit at Ashburys and take a 3 min hop to Velopark Metrolink at no extra cost.
 
Last edited:

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
GM needs to look to other examples of transport implementation failures as it and every other conurbation would when extending a transit system. Either way, whichever way you get to Ashton Old Rd, it is not sensible to run trams down a heavily congested primary A road.
The tram train tunnel would sensibly take services underground at Ardwick, relocate the Piccadilly Metrolink interchange to underneath the site of Mayfield station (close to most of Picc station via footbridge, Metrolink could use the surface platforms, then continue on towards Market St and Salford Central/St Peter's Square, Cornbrook and Warrington Central.
It’s already been decided where Piccadilly metrolink is going, which is to be under the HS2 station. We don’t know the route from Piccadilly metrolink & ‘Piccadilly East’ to the line to Guide Bridge, but it is a safe bet to say it will be segregated from road traffic.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
It’s already been decided where Piccadilly metrolink is going, which is to be under the HS2 station. We don’t know the route from Piccadilly metrolink & ‘Piccadilly East’ to the line to Guide Bridge, but it is a safe bet to say it will be segregated from road traffic.
Yes, in a tram train tunnel as TfGM want! They are going to have send it towards Ashburys/Ardwick if they want to serve the Rose Hill line via Reddish ( I think the 2tph Sheffield/New Mills services will be sent via Guide Bridge and Hyde.
 

Glenn1969

Established Member
Joined
22 Jan 2019
Messages
1,983
Location
Halifax, Yorks
Yes, in a tram train tunnel as TfGM want! They are going to have send it towards Ashburys/Ardwick if they want to serve the Rose Hill line via Reddish ( I think the 2tph Sheffield/New Mills services will be sent via Guide Bridge and Hyde.
But is any of this funded? Surely if NPR has been scaled back to save money schemes like this and the RYR wishlist have no chance of progressing?
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
Yes, in a tram train tunnel as TfGM want! They are going to have send it towards Ashburys/Ardwick if they want to serve the Rose Hill line via Reddish ( I think the 2tph Sheffield/New Mills services will be sent via Guide Bridge and Hyde.

You’re conflating two projects. There is the Glossop & Rose Hill line conversion to metrolink, using tram-trains. Then there is the metro tunnel. The Glossop & Rose Hill project is not dependent upon there being a tunnel under the city centre and nor does it require the linking line between Piccadilly and the Guide Bridge line to use street running shared by space with road traffic.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
You’re conflating two projects. There is the Glossop & Rose Hill line conversion to metrolink, using tram-trains. Then there is the metro tunnel. The Glossop & Rose Hill project is not dependent upon there being a tunnel under the city centre and nor does it require the linking line between Piccadilly and the Guide Bridge line to use street running shared by space with road traffic.
How else do you connect Picc and Guide Bridge/Rose Hill via Reddish? There's no point in building a tunnel or other substantial alignment between the 2 to connect with a slow tram which will be replaced in 15 to 20 years time with a tram train tunnel. A direct conversion of Rose Hill and Glossop to tram train from Picc main station would have absolutely no benefit apart from winding up people from Derbyshire and Tameside by making them sit on a ****ty slow tram instead of a fast Class 323 or faster 195.
 

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,524
Location
Northern England
A direct conversion of Rose Hill and Glossop to tram train from Picc main station would have absolutely no benefit apart from winding up people from Derbyshire and Tameside by making them sit on a ****ty slow tram instead of a fast Class 323 or faster 195.
But the 323 or 195 would be stopping every few minutes anyway. They aren't going to get anywhere near their top speed.

And you wouldn't run it into Picc main station, it would go through onto the street in the city centre.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
But the 323 or 195 would be stopping every few minutes anyway. They aren't going to get anywhere near their top speed.

And you wouldn't run it into Picc main station, it would go through onto the street in the city centre.
It would still be much slower when there is no need for it to be. If you want the tram, change at Picc. It is easy and you get a better variety than you ever would towards Ashton. Where are you going to put it on street? There are no cheap options for this and all are completely pointless because they do not release any capacity on any line.
 

javelin

Member
Joined
6 Sep 2021
Messages
135
Location
_
How else do you connect Picc and Guide Bridge/Rose Hill via Reddish? There's no point in building a tunnel or other substantial alignment between the 2 to connect with a slow tram which will be replaced in 15 to 20 years time with a tram train tunnel. A direct conversion of Rose Hill and Glossop to tram train from Picc main station would have absolutely no benefit apart from winding up people from Derbyshire and Tameside by making them sit on a ****ty slow tram instead of a fast Class 323 or faster 195.
It appears you are ignoring all the changes to this area due to the HS2 plans. You talk about required demolitions for example, but neglect to mention these buildings are already slated to go anyway due to HS2. Though it's probably no more than a 'vision' at this stage, the Piccadilly HS2 SRF depicts the line from Piccadilly to Ashburys rising to a viaduct parallel to HS2's, which will take you almost the whole way there.
 
Last edited:

py_megapixel

Established Member
Joined
5 Nov 2018
Messages
7,524
Location
Northern England
It would still be much slower when there is no need for it to be.
No it wouldn't. There would be no wait at Picc for a connecting tram, and on average, there would be less of a wait at the start of the journey, because it would be 5tph rather than 2.

If you want the tram, change at Picc.
Not if you are of limited mobility, have heavy baggage etc.
And in any case, I am fairly sure passengers are more likely to choose public transport over a car if they can choose direct public transport.
 

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
which at the moment is just a wishlist. Sorry to be so negative but given the current state of the public finances I don't see it or the equivalent one over here happening
Everything starts with a strategic view. You can’t just reduce every proposal to being “just a wish list” when all plans need to start from more humble beginnings. We also can’t conclude that we can’t invest in infrastructure based on public debt and the deficit, because it doesn’t relate so easily to the merits of funding various projects. Nothing anywhere would be built ever if we did, and this is not unique to the UK.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,385
It would still be much slower when there is no need for it to be. If you want the tram, change at Picc. It is easy and you get a better variety than you ever would towards Ashton. Where are you going to put it on street? There are no cheap options for this and all are completely pointless because they do not release any capacity on any line.

Given the reduction in average wait time from 15 to 6 minutes by going from 2tph to 5tph, you can tolerate a marginal increase in journey times and still provide a more useful service to the population. If you chose "worst case" wait time, it shrinks from 29 minutes to 11!

And anything that reduces use into the main trainshed is a good thing in the long run because it will eventually enable rationalisation of the Picadilly (and approaches) layout.
 
Last edited:

Purple Orange

On Moderation
Joined
26 Dec 2019
Messages
3,459
Location
The North
Given the reduction in average wait time from 15 to 6 minutes by going from 2tph to 5tph, you can tolerate a marginal increase in journey times and still provide a more useful service to the population. If you chose "worst case" wait time, it shrinks from 29 minutes to 11!

And anything that reduces use into the main trainshed is a good thing in the long run because it will eventually enable rationalisation of the Picadilly (and approaches) layout.

Added to this is that the journey time reduction/increase argument ignores the population that lives along intermediate stops too.

We could be in a scenario where only Stockport bound trains use P1-12.
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
It appears you are ignoring all the changes to this area due to the HS2 plans. You talk about required demolitions for example, but neglect to mention these buildings are already slated to go anyway due to HS2. Though it's probably no more than a 'vision' at this stage, the Piccadilly HS2 SRF depicts the line from Piccadilly to Ashburys rising to a viaduct parallel to HS2's, which will take you almost the whole way there.
That is the current plan. I thought the preferred plan was an underground station under Terminus House.

== Doublepost prevention - post automatically merged: ==

No it wouldn't. There would be no wait at Picc for a connecting tram, and on average, there would be less of a wait at the start of the journey, because it would be 5tph rather than 2.


Not if you are of limited mobility, have heavy baggage etc.
And in any case, I am fairly sure passengers are more likely to choose public transport over a car if they can choose direct public transport.
Not everyone wants a tram. Anywhere in the Stockport/Bolton/Warrington/Liverpool/Salford direction, you'll want a train because it will be much faster overall.
Most of the users of the Glossop/Rose Hill lines live close to the stations because of the density of railways in the area, so headway is not an issue.
The services in question currently terminate in the main station, relatively close to the Metrolink station. There are lifts and assistance available. Different story if it was 13/14, of course, but it isn't.

If they want to go any further than Mcr City Centre, then the car will always win from the outer boroughs while the M60 exists. What is really needed as a priority is a 10 min frequency M60 orbital bus, stopping at park and rides off junctions to speed up journeys cheaply between the outer boroughs as a precursor to an orbital Metrolink line. It would only be about an hour the whole way round, 10 buses (6 required, 4 spare) would provide a decent amount of capacity.

== Doublepost prevention - post automatically merged: ==

Given the reduction in average wait time from 15 to 6 minutes by going from 2tph to 5tph, you can tolerate a marginal increase in journey times and still provide a more useful service to the population. If you chose "worst case" wait time, it shrinks from 29 minutes to 11!

And anything that reduces use into the main trainshed is a good thing in the long run because it will eventually enable rationalisation of the Picadilly (and approaches) layout.
The main trainshed is not the issue really, for many terminating services, it is a perfectly decent solution.
However, the number of regional services using a 2 track link across Manchester is the real issue. 4-6 track the corridor, grade separate the junctions at the Picc completely from the old station and the main trainshed is good to go for another hundred years. That would never be done though, too much long term thinking.
 
Last edited:

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
20,385
The main trainshed is not the issue really, for many terminating services, it is a perfectly decent solution.
However, the number of regional services using a 2 track link across Manchester is the real issue. 4-6 track the corridor, grade separate the junctions at the Picc completely from the old station and the main trainshed is good to go for another hundred years. That would never be done though, too much long term thinking.

If you could somehow get four tracks through Castlefield, let alone six, there would be basically no use for the main trainshed any more because virtually everything would just go through Castlefield instead!
 

AlastairFraser

Established Member
Joined
12 Aug 2018
Messages
4,199
If you could somehow get four tracks through Castlefield, let alone six, there would be basically no use for the main trainshed any more because virtually everything would just go through Castlefield instead!
What use have London/Mcr South commuter services got to going through to the side. Picc is a decent terminus for these flows. The airport sure and 1 per hour through from each direction south/east of Picc (Sheffield/Lincoln/Cleethorpes/Crewe/Stoke-on-Trent/Brum), but the majority of passengers on the others almost always are going to Mcr City Centre or nearby areas which can be accessed by walking/tram/bus. That project would be more about making regional services across Mcr more frequent and connecting North of Mcr services from Vic/North WCML/the Chat Moss to the aforementioned South of Mcr destinations.
 

Gathursty

Established Member
Joined
31 May 2011
Messages
2,651
Location
Wigan
I'm trying very hard to see how making the Atherton line for trams would work.

Other parts of Manchester are more deserving of Metrolink first.
 