^^^ well said.
Your comparison is not valid in the case of Warrington as the timetabled journey time from Warrington Central to Manchester Oxford Road station by the half-hourly fast train service is 19 minutes, rather than 26-38 minutes as stated in your post. For places like that, a 2 tph fast train service is preferable to 5 tph by a much slower tram. Modern trams, being lightweight and having different wheel profiles to enable them to run on grooved track in streets, tend to "hunt" excessively on fast sections of track, giving a very uncomfortable ride.the timetabled journey time from Warrington Central to Manchester central stations is 26-38 minutes.
Your comparison is not valid in the case of Warrington as the timetabled journey time from Warrington Central to Manchester Oxford Road station by the half-hourly fast train service is 19 minutes, rather than 26-38 minutes as stated in your post. For places like that, a 2 tph fast train service is preferable to 5 tph by a much slower tram, which being lightweight, will "hunt" excessively on fast sections of track giving a very uncomfortable ride.
Your comparison is not valid in the case of Warrington as the timetabled journey time from Warrington Central to Manchester Oxford Road station by the half-hourly fast train service is 19 minutes, rather than 26-38 minutes as stated in your post. For places like that, a 2 tph fast train service is preferable to 5 tph by a much slower tram, which being lightweight, will "hunt" excessively on fast sections of track giving a very uncomfortable ride.
18 minutes today to Oxford Road on EMR servicesWell for the rest of today the absolute fastest journey time NationalRail.co.uk is giving me to Manchester Stations is 23 minutes, and most are much longer than that.
Checking Monday and so far all I can find is 23 minutes or longer - so if 19 minute trains do exist they certainly aren't common.
For some reason National Rail doesn't want you getting off East Midlands trains at Oxford Road....18 minutes today to Oxford Road on EMR services
That’s off topic!18 minutes today to Oxford Road on EMR services
Before my previous post, I checked the National Rail enquiry service for Monday 11th October 2021 for trains in the middle of the day. I found half-hourly departures at 18/48 minutes past the hour from Warrington Central, arriving Manchester Oxford Road at 37/07 minutes past the hour respectively, which is a journey time of 19 minutes.Checking Monday and so far all I can find is 23 minutes or longer - so if 19 minute trains do exist they certainly aren't common.
Before my previous post, I checked the National Rail enquiry service for Monday 11th October 2021 for trains in the middle of the day. I found half-hourly departures at 18/48 minutes past the hour from Warrington Central, arriving Manchester Oxford Road at 37/07 minutes past the hour respectively, which is a journey time of 19 minutes.
Your comparison is not valid in the case of Warrington as the timetabled journey time from Warrington Central to Manchester Oxford Road station by the half-hourly fast train service is 19 minutes, rather than 26-38 minutes as stated in your post.
(For some reason, EMR trains don't go to Oxford Road according to NationalRail)
They do.
You need to state Manchester Oxford Road station as the destination (not Manchester stations) to find all the fast trains from Warrington Central on National Rail Enquiries.I show three trains per hour with only one having a journey time of 19 minutes in most hours.
(For some reason, EMR trains don't go to Oxford Road according to NationalRail)
There is a big difference between a train frequency of 1 tph and 2 tph in terms of usefulness and comparison with a more frequent tram service.It would be interesting to see the relative passenger numbers between those taking Merseyrail from Liverpool to Chester (4tph but slower) and those taking TfW (1tph but faster).
I mean, if you order trains from Warrington Central to Manchester Stations, EMR trains take you to Manchester Picadilly rather than Oxford Road, like the Northern Trains do.
This seems to be entirely illogical behaviour. Some trains terminate the routing at Oxford Road but not others?You need to state Manchester Oxford Road station as the destination (not Manchester stations) to find all the fast trains from Warrington Central on National Rail Enquiries.
Nearly all the slow/semi-fast trains from Warrington Central to Manchester terminate at Oxford Road station.This seems to be entirely illogical behaviour. Some trains terminate the routing at Oxford Road but not others?
It turns out the second 19 minute train in an hour does exist but seems to run at a seemingly randomly selected set of times.
In an hour where it does run we shrink adjusted journey time to 31 minutes, and thus the tram equivalent journey time of 25 minutes.
Without proper modelling I can't tell if that is achievable or not, after all a tram does have dramatically better performance than a Sprinter or similar.
It would not be possible to run a 2 tph fast service from Warrington Central to Manchester on the CLC line as well as a 5 tph tram-train stopping service. The most that could be accommodated is either a Metrolink tram service, or a 2 tph fast train service combined with a 2 tph stopping train service, the latter leaving Warrington Central and Manchester Oxford Road stations just after a fast train has departed.This debate about the merits of metrolink v EMR on the CLC to Warrington is missing the point entirely.
If the line was converted, there would still be a heavy rail service alongside the metrolink services.
Running a residual heavy rail service would be problematic for timetable reasons unless it was slowed down to be not much faster than the trams.This debate about the merits of metrolink v EMR on the CLC to Warrington is missing the point entirely.
If the line was converted, there would still be a heavy rail service alongside the metrolink services.
It would not be possible to run a 2 tph fast service from Warrington Central to Manchester on the CLC line as well as a 5 tph tram-train stopping service. The most that could be accommodated is either a Metrolink tram service, or a 2 tph fast train service combined with a 2 tph stopping train service, the latter leaving Warrington Central and Manchester Oxford Road stations just after a fast train has departed.
The situation at Rotherham (Central) station shows that while tram-train services are feasible, they cannot be run at a high frequency because of the need to accommodate other heavy rail services.
Running a residual heavy rail service would be problematic for timetable reasons unless it was slowed down to be not much faster than the trams.
In addition, it would be quite a lot of work given the operational problems today's services would cause with the flat junction onto Castlefield.
Eliminating those annoyances is probably one of the main ways such a scheme would get funded.
A mix of light rail & heavy rail works between Newcastle & Sunderland. Although I think it won’t specifically be tram-trains on the line, the principal of them is to run on track shared with heavy rail. You’d get 5 tph light rail and 1 tph heavy rail.
And if you did, guess which most non-enthusiast people would use from Warrington to Manchester? (See also my Chester example - OK, Merseyrail isn't light rail, but the point is that the simple, high frequency service is the one they will go for even if it's slower).
The distance between Newcastle & Sunderland is shorter than that between Manchester Oxford Road and Warrington Central, and the heavy rail journeys are significantly slower. In my opinion, unless the heavy train service speed was significantly reduced to the same as that of the trains, one couldn't operate a heavy rail service as well as tram-trains on the CLC line.A mix of light rail & heavy rail works between Newcastle & Sunderland.
Oh certainly. Especially given that Warrington metrolink cant happen unless a tunnel under manchester is built. This makes it unlikely that tram-trains would use the line, but it also increases the likelihood of the conversion not happening.
Do they actually want to Metrolink it, or just take over the heavy rail services?I would be amazed if a third city crossing (probably a Den Haag-esque Tramtunnel) was not built within 10 years, certainly 20. TfGM's strategy is for basically the whole local rail network to be Metrolinked give or take the bits that have too much long distance traffic.
I would be amazed if a third city crossing is built within 10 years, or even 20, if it is planned to be underground.I would be amazed if a third city crossing (probably a Den Haag-esque Tramtunnel) was not built within 10 years, certainly 20.
Do they actually want to Metrolink it, or just take over the heavy rail services?
To be fair, Metrolink has a lot more in common with an S-bahn than what you might traditionally describe as a tramway.
I would be amazed if a third city crossing (probably a Den Haag-esque Tramtunnel) was not built within 10 years, certainly 20. TfGM's strategy is for basically the whole local rail network to be Metrolinked give or take the bits that have too much long distance traffic.
think you're having a mare with NRE
Agreed. As a concept, it certainly seems that most would prefer the light rail network as opposed to the ‘traditional’ heavy rail frequency that needs to fit in with freight and long distance at some point on the journey.I think that we'd be better discussing lines that are relatively "stand alone" with a fairly uniform pattern of passenger services and no freight rather than fixating on the unusual circumstances of the Warrington Central route, given that they could be converted with relatively minimum fuss, rather than all of the complications of these Warrington Central proposals (tunnel under Manchester etc)