Who do you think's likely to get the contract for the electrification work ?
Carillion...............
Who do you think's likely to get the contract for the electrification work ?
Search Companies House for the friends and relatives of cabinet ministers....Who do you think's likely to get the contract for the electrification work ?
Amey would be a likely principal contender, based on the fact that they have an established base in the NW already (for NWEP post-Carillion, and for TRU West).Who do you think's likely to get the contract for the electrification work ?
Are Amey the successors to the one-time Leonard Fairclough of Adlington? (No relation to another former builder, Leonard Fairclough of Coronation Street.)Amey would be a likely principal contender, based on the fact that they have an established base in the NW already (for NWEP post-Carillion, and for TRU West).
No. According to Wikipedia (yes, I know) Leonard Fairclough & Son of Adlington merged with William Press Group to form AMEC, later Amec Foster Wheeler, who are now themselves owned by the John Wood Group.Are Amey the successors to the one-time Leonard Fairclough of Adlington? (No relation to another former builder, Leonard Fairclough of Coronation Street.)
Many of the possible contractors are foreign-owned or influenced - SPL Powerlines who did the MML Corby electrification is largely Austrian-controlled.Search Companies House for the friends and relatives of cabinet ministers....
Wikipedia requires its authors to provide a source; if there is a source provided I recommend referring to the primary source. If there is no source provided this means the article isn't consistent with Wikipedia guidelines.No. According to Wikipedia (yes, I know) Leonard Fairclough & Son of Adlington merged with William Press Group to form AMEC, later Amec Foster Wheeler, who are now themselves owned by the John Wood Group.
I was momentarily confused by the similarity of the names Amec and Amey.No. According to Wikipedia (yes, I know) Leonard Fairclough & Son of Adlington merged with William Press Group to form AMEC, later Amec Foster Wheeler, who are now themselves owned by the John Wood Group.
The Dicconson Lane branch was the one that included a station at Dicconson Lane. Originally it was vitally important to access Horwich Works. I don’t believe it is obstructed by the M61. I’ll be passing Crow Nest Junction in 5 minutes so I’ll have a look.Is the Dicconson lane branch the line that went from Dobb brow to black rod? If so it’s unlikely it will ever open again as the M61 cuts through it at the blackrod side. There is also a stretch that has been submerged for years, you can see it to the left when heading towards westhoughton after going over crow nest.
I don’t believe it is obstructed by the M61.
I was momentarily confused by the similarity of the names Amec and Amey.
I once read of a contract for which the tenderers were Amey, Amec and AMcA (Alfred McAlpine).
They could have used the corrugated steel specialist Armco as a subcontractor.Didn’t AMCO bid too? (Amalgamated Construction)
Didn’t AMCO bid too? (Amalgamated Construction)
They could have used the corrugated steel specialist Armco as a subcontractor.
And used Aecom as designer?They could have used the corrugated steel specialist Armco as a subcontractor.
Volker and Buckingham were the contractors for GRIP 3 back in 2017.Who do you think's likely to get the contract for the electrification work ?
I'm guessing Volker for railway systems (OLE etc) and Buckingham for heavy civils (bridges etc)?Volker and Buckingham were the contractors for GRIP 3 back in 2017.
Very basic connection via sidings, and unsuitable for passenger services.There was actually a connection from the Warrington Central direction on to the WCML going north in the past.
Sounds plausible. Have you done such a search ? Can you share some info. ?Search Companies House for the friends and relatives of cabinet ministers....
Buckingham are a major NR civils contractor for new stations: Bromsgrove, Bicester Village etc, and I think they built Alstom's new maintenance base at Widnes.Only other one who can win it is called Buckingham , never heard of them ?
He told me who he thinks won’t get it, Kelbray & Volker Rail.
Easy money for someone , and don’t worry about going over budget, they always find more and someone else to blame!
Volkers stepped in after BB exited hence some were awarded twice (or thrice if Carillion was in there second!)Buckingham are a major NR civils contractor for new stations: Bromsgrove, Bicester Village etc, and I think they built Alstom's new maintenance base at Widnes.
They were also involved in the Todmorden curve reinstatement.
Balfour Beatty was relieved of the NW contract over overspending.
One rather surprising thing about electrification projects is the number of subcontractors used, and the two you mention keep turning up on schemes supposedly awarded to other firms.
So 20 stkm (single track km), or £3.9m per stkm at the announced £78m cost.Just to clarify that Lostock Junction to Wigan Station Junction is only 6.5 miles (13 track miles).
This does also include the platform extensions, bridge modifications and level crossing modifications. Perhaps there's an element of ancillary civils and E&P upgrades to go with this?So 20 stkm (single track km), or £3.9m per stkm at the announced £78m cost.
Nowhere close to the NR target (around £1m per stkm).
There must be complications.
Presumably its relative shortness won’t help. Guessing that, all other factors being equal, a 20 stkm project will cost more per km than a 200 stkm oneThis does also include the platform extensions, bridge modifications and level crossing modifications. Perhaps there's an element of ancillary civils and E&P upgrades to go with this?
So 20 stkm (single track km), or £3.9m per stkm at the announced £78m cost.
Nowhere close to the NR target (around £1m per stkm).
There must be complications.
Presumably its relative shortness won’t help. Guessing that, all other factors being equal, a 20 stkm project will cost more per km than a 200 stkm one
Presumably for being so short, overheads (e.g. office costs) etc are disproportionately high.