Wigan to Bolton electrification officially given go ahead

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,861
Location
Beeston (Notts)
Who do you think's likely to get the contract for the electrification work ?
Amey would be a likely principal contender, based on the fact that they have an established base in the NW already (for NWEP post-Carillion, and for TRU West).
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
Amey would be a likely principal contender, based on the fact that they have an established base in the NW already (for NWEP post-Carillion, and for TRU West).
Are Amey the successors to the one-time Leonard Fairclough of Adlington? (No relation to another former builder, Leonard Fairclough of Coronation Street.)
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,528
Location
Northampton
Are Amey the successors to the one-time Leonard Fairclough of Adlington? (No relation to another former builder, Leonard Fairclough of Coronation Street.)
No. According to Wikipedia (yes, I know) Leonard Fairclough & Son of Adlington merged with William Press Group to form AMEC, later Amec Foster Wheeler, who are now themselves owned by the John Wood Group.
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,918
Location
Mold, Clwyd
Search Companies House for the friends and relatives of cabinet ministers....
Many of the possible contractors are foreign-owned or influenced - SPL Powerlines who did the MML Corby electrification is largely Austrian-controlled.
Amey who did much of the GW work is Spanish-owned (Ferrovial - same group that owns Heathrow Airport).
The British company originally doing the NW work (Balfour Beatty) was booted off after a contractual dispute, but still has major contracts with Crossrail and HS2 Ltd.
BB was NR's appointed electrification contractor for the North West, well before they were controlled by DfT.
I doubt you'll find much to complain about with NR's procurement procedures.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
78,359
Location
Yorkshire
Just a gentle reminder this is a thread to discuss the electrification of Wigan to Bolton.

If anyone wishes to discuss anything else, please create a new thread or use an existing one, as appropriate.

Any speculative posts belong in Speculative Ideas forum please.


== Doublepost prevention - post automatically merged: ==

No. According to Wikipedia (yes, I know) Leonard Fairclough & Son of Adlington merged with William Press Group to form AMEC, later Amec Foster Wheeler, who are now themselves owned by the John Wood Group.
Wikipedia requires its authors to provide a source; if there is a source provided I recommend referring to the primary source. If there is no source provided this means the article isn't consistent with Wikipedia guidelines.
 

Trainer2

Member
Joined
19 May 2021
Messages
59
Location
UK
It was Carillion then Amey (same staff, different badge!)that did Euxton Junction to Manc Victoria electrification.
My mate was working for both.
Network Rail did there own over head line wires in house for half of it, it was the best part of the job!

He thinks Amey will get it and manage it using sub contractors. A nice 15% profit on the overall cost for their services!

Only other one who can win it is called Buckingham , never heard of them ?
He told me who he thinks won’t get it, Kelbray & Volker Rail.

Easy money for someone , and don’t worry about going over budget, they always find more and someone else to blame!
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
No. According to Wikipedia (yes, I know) Leonard Fairclough & Son of Adlington merged with William Press Group to form AMEC, later Amec Foster Wheeler, who are now themselves owned by the John Wood Group.
I was momentarily confused by the similarity of the names Amec and Amey.

I once read of a contract for which the tenderers were Amey, Amec and AMcA (Alfred McAlpine).
 

507020

Established Member
Joined
23 May 2021
Messages
1,983
Location
Southport
Is the Dicconson lane branch the line that went from Dobb brow to black rod? If so it’s unlikely it will ever open again as the M61 cuts through it at the blackrod side. There is also a stretch that has been submerged for years, you can see it to the left when heading towards westhoughton after going over crow nest.
The Dicconson Lane branch was the one that included a station at Dicconson Lane. Originally it was vitally important to access Horwich Works. I don’t believe it is obstructed by the M61. I’ll be passing Crow Nest Junction in 5 minutes so I’ll have a look.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,817
I was momentarily confused by the similarity of the names Amec and Amey.

I once read of a contract for which the tenderers were Amey, Amec and AMcA (Alfred McAlpine).

Didn’t AMCO bid too? (Amalgamated Construction)
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,918
Location
Mold, Clwyd
Only other one who can win it is called Buckingham , never heard of them ?
He told me who he thinks won’t get it, Kelbray & Volker Rail.
Easy money for someone , and don’t worry about going over budget, they always find more and someone else to blame!
Buckingham are a major NR civils contractor for new stations: Bromsgrove, Bicester Village etc, and I think they built Alstom's new maintenance base at Widnes.
They were also involved in the Todmorden curve reinstatement.
Balfour Beatty was relieved of the NW contract over overspending.

One rather surprising thing about electrification projects is the number of subcontractors used, and the two you mention keep turning up on schemes supposedly awarded to other firms.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
8,257
Buckingham are a major NR civils contractor for new stations: Bromsgrove, Bicester Village etc, and I think they built Alstom's new maintenance base at Widnes.
They were also involved in the Todmorden curve reinstatement.
Balfour Beatty was relieved of the NW contract over overspending.

One rather surprising thing about electrification projects is the number of subcontractors used, and the two you mention keep turning up on schemes supposedly awarded to other firms.
Volkers stepped in after BB exited hence some were awarded twice (or thrice if Carillion was in there second!)
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
1,133
Just to clarify that Lostock Junction to Wigan Station Junction is only 6.5 miles (13 track miles).
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
21,918
Location
Mold, Clwyd
Just to clarify that Lostock Junction to Wigan Station Junction is only 6.5 miles (13 track miles).
So 20 stkm (single track km), or £3.9m per stkm at the announced £78m cost.
Nowhere close to the NR target (around £1m per stkm).
There must be complications.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,861
Location
Beeston (Notts)
So 20 stkm (single track km), or £3.9m per stkm at the announced £78m cost.
Nowhere close to the NR target (around £1m per stkm).
There must be complications.
This does also include the platform extensions, bridge modifications and level crossing modifications. Perhaps there's an element of ancillary civils and E&P upgrades to go with this?
 

The exile

Established Member
Joined
31 Mar 2010
Messages
9,390
Location
Somerset
This does also include the platform extensions, bridge modifications and level crossing modifications. Perhaps there's an element of ancillary civils and E&P upgrades to go with this?
Presumably its relative shortness won’t help. Guessing that, all other factors being equal, a 20 stkm project will cost more per km than a 200 stkm one
 

Efini92

Established Member
Joined
14 Dec 2016
Messages
2,137
Is there many bridges that need alterations? Off the top of my head I can only think of two. The one at the station it’s self and the brand new one down near crow nest.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
So 20 stkm (single track km), or £3.9m per stkm at the announced £78m cost.
Nowhere close to the NR target (around £1m per stkm).
There must be complications.

Presumably its relative shortness won’t help. Guessing that, all other factors being equal, a 20 stkm project will cost more per km than a 200 stkm one

Presumably for being so short, overheads (e.g. office costs) etc are disproportionately high.
 

option

Member
Joined
1 Aug 2017
Messages
639
Presumably for being so short, overheads (e.g. office costs) etc are disproportionately high.

Lots of fixed costs, eg. a piling rig might take a day to move to site & set up, that's got to be charged for. Doesn't matter if it's there for a weekend or a week, same cost for that bit.

Creating a compound costs the same whether you want it for a week or a month.
 