As often noted, 140 vs 125 is 3 seconds a mile, you need a lot of it to make a dent. Its not just track you need to upgrade either.
I am afraid that small increases in speed dont help journey times much . what really helps is eliminating permanent speed restrictions. the more severe the restriction that is eliminated, the better.
So where are the places on the 'inter-city' network that would benefit from a few JCB's doing their stuff?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,676
I am afraid that small increases in speed dont help journey times much . what really helps is eliminating permanent speed restrictions. the more severe the restriction that is eliminated, the better.
So where are the places on the 'inter-city' network that would benefit from a few JCB's doing their stuff?
I doubt there are very many "quick wins", most have been picked off already. You need to be looking away from the 100 110 to 125 stuff as you note, also anything that is going to need a re-alignment. You need to look at approach control, conditional double reds, flashing yellows etc, don't ignore getting loop entry and exit speeds up either but they are not seen as sexy items.
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
I doubt there are very many "quick wins", most have been picked off already. You need to be looking away from the 100 110 to 125 stuff as you note, also anything that is going to need a re-alignment. You need to look at approach control, conditional double reds, flashing yellows etc, don't ignore getting loop entry and exit speeds up either but they are not seen as sexy items.
Newark crossing may be an easy win, as it is 100mph in a 125 stretch. (Or it was, I may be out of date)

Some of the WCML through Cumbria may be worth a look. How about a new alignment between Tebay and north of Shap (Hackthorpe maybe) alongside the M6 for starters?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,676
Newark crossing may be an easy win, as it is 100mph in a 125 stretch. (Or it was, I may be out of date)

Some of the WCML through Cumbria may be worth a look. How about a new alignment between Tebay and north of Shap (Hackthorpe maybe) alongside the M6 for starters?
All stuff I said is not going to get a look in as they are too expensive or don't deliver much. Newark is 100 mph for 18 chains (so 2 seconds faster at 125mph) so you probably get 10 seconds max once you factor in braking and accelerating.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,054
Location
Reston City Centre
Newark crossing may be an easy win, as it is 100mph in a 125 stretch. (Or it was, I may be out of date)

The flat crossing on the ECML is a bottleneck and it obviously needs to be slower than other sections of the route but I don't know how you divert the Lincoln - Nottingham line (under? over? finding a new place to cross the ECML?) given the A46 and the River Trent - it's such a tight corridor that I don't know how we solve the problem (much as I'd love to - it's clearly an issue - it'd be a big help on Lincoln - Nottingham services as well as simplifying things along the ECML)
 

Cheshire Scot

Established Member
Joined
24 Jul 2020
Messages
1,676
Location
North East Cheshire
A battery/25Kv bimode is the obvious fix for that branch.
If there is not enough time on 25Kv waiting at Oxenholme to keep the batteries topped up, then wire Oxenholme - Kendal.
A very sensible and (one would hope) relatively cheap solution. The wiring of the branch platform at Oxenholme was designed to facilitate wiring towards Kendal.
 

Ken H

Established Member
Joined
11 Nov 2018
Messages
6,718
Location
N Yorks
The flat crossing on the ECML is a bottleneck and it obviously needs to be slower than other sections of the route but I don't know how you divert the Lincoln - Nottingham line (under? over? finding a new place to cross the ECML?) given the A46 and the River Trent - it's such a tight corridor that I don't know how we solve the problem (much as I'd love to - it's clearly an issue - it'd be a big help on Lincoln - Nottingham services as well as simplifying things along the ECML)
The whole area is a mess. The A46 is single carriageway round Newark, the only bit between M1 Leicester and Lincoln that isn't dualled. The A46/A616/A617/B6326 roundabout is a horror, made worse by the level crossing on the B6326 by Castle Station. And Sugar factory traffic in summer.
A new bridge to take an extra A46 carriageway + the railway would do it. But organising the junction between the Nottm-Lincoln line and the chord from Northgate may be an issue. But you would also need a way for through A46 traffic to avoid the A1 junction too.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The whole area is a mess. The A46 is single carriageway round Newark, the only bit between M1 Leicester and Lincoln that isn't dualled. The A46/A616/A617/B6326 roundabout is a horror, made worse by the level crossing on the B6326 by Castle Station. And Sugar factory traffic in summer.
A new bridge to take an extra A46 carriageway + the railway would do it. But organising the junction between the Nottm-Lincoln line and the chord from Northgate may be an issue. But you would also need a way for through A46 traffic to avoid the A1 junction too.
Highways England has a current plan to dual the single carriageway section of the A46 and improve the junction with the A1. When I last looked it did not include a rail flyover. See page 4 of this thread (which was reopened at my request in February):

 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,956
Location
York
I doubt there are very many "quick wins", most have been picked off already. You need to be looking away from the 100 110 to 125 stuff as you note, also anything that is going to need a re-alignment. You need to look at approach control, conditional double reds, flashing yellows etc, don't ignore getting loop entry and exit speeds up either but they are not seen as sexy items.
They may not be the sexy ones but they are the ones where there's still a lot of scope. But there are also quite a lot of cases where re-alignment would help — look at the gains from the re-modelling of Derby and Reading, and even from the small changes totally within the existing formation at Leicester. As for larger re-alignments, what about doing the Carstairs job properly, building a new curve at Westerleigh, etc, to get rid of very low restrictions in the middle of otherwise high-speed sections. Most of the "quick wins" on the London lines probably have indeed been picked off already, but there's still scope for action on the principal cross-country routes (it would be intersting to re-visit the route-upgrade plans that were the part of the Operation Princess grand scheme never delivered).
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,252
Location
Bolton
A solar farm has now gone up in the land that'd be required at Westerleigh.
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
A solar farm has now gone up in the land that'd be required at Westerleigh.

Not the most difficult thing to shift in the grand scheme of things.

(Still probably a near-hopeless business case though)
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,676
Not sure what Westerleigh would really get you, probably ½ mile shorter if you really cut the corner off and its only a mile of just over a mile of 40/55/65 before you hit the 100 again. Lot of money for what it would be. Doubt it has ever appeared in a route study/RUS.
 

NoMorePacers

Established Member
Joined
18 Feb 2016
Messages
1,401
Location
Humberside
It's not really a mainline anymore. All the London service route via Selby, in addition to TPE which would also benefit here.
The Goole line gets a notably more frequent service though, plus you'd need to wire Micklefield - Selby in order for TPE to benefit from Selby - Hull wires (you'd probably want to chuck wires on the Hambleton Curve and Gascoigne Wood - Church Fenton to get the Yorks onto EMUs). Not that I disagree that it should be wired at some point though.
 

Senex

Established Member
Joined
1 Apr 2014
Messages
2,956
Location
York
Not sure what Westerleigh would really get you, probably ½ mile shorter if you really cut the corner off and its only a mile of just over a mile of 40/55/65 before you hit the 100 again. Lot of money for what it would be. Doubt it has ever appeared in a route study/RUS.
With that one I suppose I was in maximum crayonista mode (for this country, at any rate — there are other places where this sort of deviation would be considered as part of a route-upgrade scheme).:) This curve-radius would allow 100 round the corner, and switches for those speeds are well-established railway technology these days.
 

Attachments

  • Winterbourne.jpg
    Winterbourne.jpg
    551.7 KB · Views: 51

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,676
With that one I suppose I was in maximum crayonista mode (for this country, at any rate — there are other places where this sort of deviation would be considered as part of a route-upgrade scheme).:) This curve-radius would allow 100 round the corner, and switches for those speeds are well-established railway technology these days.
But like I said earlier, this sort of stuff isn't going to get a sniff in the short to medium term. Value management is going to be thrown around like confetti for a while. I know of one well developed re-signaling scheme that nearly got pulled and another in early development that has basically been told to not expect much more than a "like for like" scenario.
 

Starmill

Veteran Member
Joined
18 May 2012
Messages
27,252
Location
Bolton
But like I said earlier, this sort of stuff isn't going to get a sniff in the short to medium term. Value management is going to be thrown around like confetti for a while. I know of one well developed re-signaling scheme that nearly got pulled and another in early development that has basically been told to not expect much more than a "like for like" scenario.
What else can we expect when government cuts back on the capital budget. That's £1.5 billion that's not coming back.

== Doublepost prevention - post automatically merged: ==

Not the most difficult thing to shift in the grand scheme of things.

(Still probably a near-hopeless business case though)
Oh indeed. It's just that acquiring the farmland for solar generation suggests it wasn't that expensive to negotiate purchasing. Now the price of the land will be far higher.
 

Stephen Lee

On Moderation
Joined
7 Jul 2019
Messages
682
I think West of England Main Line,Eastleigh–Romsey line,Wessex Main Line, Marshlink and the Oxted Branch Line should be electrified. Therefore the Class 158/159/171s can be displaced and converted to Class 158/170s, hahah.
 
Last edited:

peteb

Established Member
Joined
30 Mar 2011
Messages
1,695
Leamington to Worcester plus Bromsgrove to Droitwich. Would enable alternate cross city trains to continue from Bromsgrove to Worcester, plus allow electric traction up Old Hill bank. If Coventry to Leamington included too then much more flexibility in routing. It would allow Hereford services to run fast Worcester to Birmingham if a regular clockface stopping electric service ran between these two cities.
The line from Stourbridge to Worcester should be upgraded to 90mph running at the same time, allowing 10 mins off Worcs to Snow Hill timings.
 

RH Liner

Member
Joined
31 Jan 2021
Messages
119
Location
Rainworth
The whole area is a mess. The A46 is single carriageway round Newark, the only bit between M1 Leicester and Lincoln that isn't dualled. The A46/A616/A617/B6326 roundabout is a horror, made worse by the level crossing on the B6326 by Castle Station. And Sugar factory traffic in summer.
A new bridge to take an extra A46 carriageway + the railway would do it. But organising the junction between the Nottm-Lincoln line and the chord from Northgate may be an issue. But you would also need a way for through A46 traffic to avoid the A1 junction too.
I seem to remember that in a previous thread someone suggested diverting the Nottingham-Lincoln line from Fiskerton (for Southwell) to south of Newark Northgate. It would still be mega-expensive, and as well as the roads it would cross it would need also to span the Trent, and also fly over the ECML before dropping into Platform 3 (and a new 4?) at Northgate. This would eliminate not only the flat crossing, but also the pain in the bum that is Newark Castle level crossing. The question is whether the benefits to both road and rail traffic in Newark would be enough to justify the expense.
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,676
Leamington to Worcester plus Bromsgrove to Droitwich. Would enable alternate cross city trains to continue from Bromsgrove to Worcester, plus allow electric traction up Old Hill bank. If Coventry to Leamington included too then much more flexibility in routing. It would allow Hereford services to run fast Worcester to Birmingham if a regular clockface stopping electric service ran between these two cities.
The line from Stourbridge to Worcester should be upgraded to 90mph running at the same time, allowing 10 mins off Worcs to Snow Hill timings.
Need to bend the laws of physics to get 10 minutes for that. Its about 22 miles with most of it 75mph already. You would be lucky to get 5 even if you sorted out Droitwich etc...
 

peteb

Established Member
Joined
30 Mar 2011
Messages
1,695
Need to bend the laws of physics to get 10 minutes for that. Its about 22 miles with most of it 75mph already. You would be lucky to get 5 even if you sorted out Droitwich etc...
Well, maybe down to 23 minutes? An average stopper takes 31/32 minutes for 22 miles now. Level crossings an issue, also Kiddy viaduct has 60 restriction which should go. Allowing for faster acceleration and deceleration of electric traction plus 90 max from Worcester Tunnel to Droitwich would save 2/3 minutes. 90 from Droitwich junction to Kiddy would save 3 minutes and again from Kiddy to Stourbridge Junction 2/3 mins shaved off. The trackbed is broad gauge so canting curves and realignment is not impossible. As a comparison non stop diverted voyagers do it in 20 mins restricted to 75mph eg the Totnes to New St which has just gone through......
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
19,676
Well, maybe down to 23 minutes? An average stopper takes 31/32 minutes for 22 miles now. Level crossings an issue, also Kiddy viaduct has 60 restriction which should go. Allowing for faster acceleration and deceleration of electric traction plus 90 max from Worcester Tunnel to Droitwich would save 2/3 minutes. 90 from Droitwich junction to Kiddy would save 3 minutes and again from Kiddy to Stourbridge Junction 2/3 mins shaved off. The trackbed is broad gauge so canting curves and realignment is not impossible. As a comparison non stop diverted voyagers do it in 20 mins restricted to 75mph eg the Totnes to New St which has just gone through......
All of this would cost a fortune, especially if you start asking why Kiddy viaduct is 60. Shrub Hill to Droitwich is 5½ miles even with instantaneous acceleration you cannot do that in less than 3 minutes 40 seconds. 90 is 4 minutes 24 seconds. Droitwich to Kiddy is 9½ miles and 75 all the way on the down, get that to 90 and it saves just over a minute. Kiddy to Stourbridge is 3½ miles, so 30 seconds saving at 90 over 75. There aren't the gains you think there are, basic maths tells you that.
 

BerkshireRails

On Moderation
Joined
4 Apr 2021
Messages
889
Location
United Kingdom
They may not be the sexy ones but they are the ones where there's still a lot of scope. But there are also quite a lot of cases where re-alignment would help — look at the gains from the re-modelling of Derby and Reading, and even from the small changes totally within the existing formation at Leicester. As for larger re-alignments, what about doing the Carstairs job properly, building a new curve at Westerleigh, etc, to get rid of very low restrictions in the middle of otherwise high-speed sections. Most of the "quick wins" on the London lines probably have indeed been picked off already, but there's still scope for action on the principal cross-country routes (it would be intersting to re-visit the route-upgrade plans that were the part of the Operation Princess grand scheme never delivered).
Except for the southern region lines.
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
18,523
Location
Northampton
I think the Brighton Mainline and the Southwestern Mainline should become 125mph with OLE.
Why the Brighton Line? you're not going to get above existing linespeed until you're on the Quarry lines which is halfway to Brighton so you'd save a handful of seconds, especially after stopping at Gatwick and Haywards Heath. 100mph and conversion to OLE would be nice but is very much not a priority.
Similarly with the SWML, there's very few places going to 125mph would help. OLE would make sense for the SWML west of Basingstoke but the cost of conversion would be difficult to justify when commuter lines in Birmingham, Manchester and Leeds aren't electrified at all. That's before the issue of getting past the train in front that's stopping ahead of you.
What about the North Downs Line?
The gains are really marginal for what is very much a secondary line. In an ideal world extending the 3rd rail to Shalford and using battery units so they just have to manage Reigate-Shalford and Ash Vale-Wokingham off the juice would make the most sense.
 

snowball

Established Member
Joined
4 Mar 2013
Messages
8,144
Location
Leeds
The flat crossing on the ECML is a bottleneck and it obviously needs to be slower than other sections of the route but I don't know how you divert the Lincoln - Nottingham line (under? over? finding a new place to cross the ECML?) given the A46 and the River Trent - it's such a tight corridor that I don't know how we solve the problem (much as I'd love to - it's clearly an issue - it'd be a big help on Lincoln - Nottingham services as well as simplifying things along the ECML)
Obviously you would divert the Lincoln-Nottingham line over the ECML. Under would be inviting inundation. See my post #40 in this thread, and the link there to another thread. According to people there with knowledge of previous investigations, a diversion alongside the present line, on the NW side, would be possible, despite the current road proposals which would occupy the SE side of the line. You would be doing it for reasons of capacity on the ECML, not speed.
 