The closing ceremony of the 2008 Olympic Games in Beijing involved a "stereotypical" London bus as part of the handover of the Games to London. At first sight, it appeared pretty much a stock first generation Enviro 400, although with blacked out windows, no upper deck obstacle deflectors and some odd panel gaps. It had the look of a prototype.

Handover-1.jpg


The upper deck then opened up in sections revealing an astroturf-clad interior and some ingenious stage platforms and performers including Leona Lewis and David Beckham were lifted out from the bus with hydraulic rams.

Handover-5.JPG


The production company Stage One produced a detailed white paper on how they did it with lots of images.

https://www.stageone.co.uk/wp-conte...Handover-2008-Beijing-London-Case-Study-C.pdf

THE BUS
The bus was to contain 200kW of hydraulic force,
60kW of lighting plus the necessary sound provision
for the performers whilst retaining the ability to be
driven around the Stadium at a speed of about 5mph.
A nine tonne Alexander Dennis Enviro 400 bus was
delivered to us in ‘kit’ form, comprising of a chassis
with wheels and an engine, with the rest of the
bodywork in a series of pallets.

Whatever processes we subjected the bus to within
the nine week build period, it was imperative that
it retained its original identity and iconic look and,
unusually, that all power and show control was
carried out from within the bus itself. In order to
create the power to do this, the original Cummins
six-cylinder diesel engine was disconnected and
used instead to drive a hydraulic pump, powering
two hydraulic hub motors.

So my question is, what happened to this bus? Does it still exist, in a production company warehouse or even museum or private collection somewhere? Were the chassis, nearly new engine and components salvaged either for rebuild or for parts? Clearly very little of the body would ever be suitable for service and by that point the pre-face-lift design was close to being out of production.
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

gka472l

Member
Joined
29 Apr 2016
Messages
671
Location
Merseyside
I presumed it was scrapped, going from this pic on Flickr


HTH
 
Last edited by a moderator:

Busaholic

Veteran Member
Joined
7 Jun 2014
Messages
14,671
It wasn't a 'proper' bus was it? It might have had the capability to run under its own 'steam'(!) for a short period at not much more than walking pace, but making it fit for any sort of passenger service would have cost the earth, and not able to be done with existing systems, so why would anyone bother?
 

Gag Halfrunt

Member
Joined
23 Jul 2019
Messages
1,006
Presumably someone was planning to do something with it, because it was shipped back to the UK instead of being scrapped in China. Perhaps the London organising committee expected to use it again in the 2012 opening ceremony but changed their minds.
 

Royston Vasey

Established Member
Joined
14 May 2008
Messages
3,001
Location
Cambridge
It wasn't a 'proper' bus was it? It might have had the capability to run under its own 'steam'(!) for a short period at not much more than walking pace, but making it fit for any sort of passenger service would have cost the earth, and not able to be done with existing systems, so why would anyone bother?
Standard E400 chassis and kit but thereafter heavily modified and the drive provided by hydraulics. Interesting piece of engineering really!

== Doublepost prevention - post automatically merged: ==

Presumably someone was planning to do something with it, because it was shipped back to the UK instead of being scrapped in China. Perhaps the London organising committee expected to use it again in the 2012 opening ceremony but changed their minds.
I looked for references of it being used at 2012 opening but there was only a psychedelic Pearce and Crump type vehicle which happened to be on ebay last September for a couple of thousand pounds!

== Doublepost prevention - post automatically merged: ==

I presumed it was scrapped, going from this pic on Flickr


HTH
That is fairly conclusive! Thank you!

There's potentially a very low mileage Cummins engine in there for the scrappie to move on, but I guess the value was long since written down.
 
Last edited:

Gag Halfrunt

Member
Joined
23 Jul 2019
Messages
1,006
I looked for references of it being used at 2012 opening but there was only a psychedelic Pearce and Crump type vehicle which happened to be on ebay last September for a couple of thousand pounds!
The scrapyard photo was taken in 2010.
 

Gloster

Veteran Member
Joined
4 Sep 2020
Messages
13,050
Location
Up the creek
As it said London-Beijing-London on the side, somebody may have been aware of the potential bad publicity if they left it to be scrapped in Beijing.
 

Busaholic

Veteran Member
Joined
7 Jun 2014
Messages
14,671
As it said London-Beijing-London on the side, somebody may have been aware of the potential bad publicity if they left it to be scrapped in Beijing.
Don't forget, London weren't expected to win!
 

Mikey C

Established Member
Joined
11 Feb 2013
Messages
8,281
Slightly disappointing it was scrapped so soon afterwards, though while special, it probably wasn't special enough for someone to want to preserve it.
 