No doubt most of the staff will, by now, just automatically assume that it will remain forever more.
![]()
Spoken, I assume, as a person who works in the industry and knows the majority of staff?
No doubt most of the staff will, by now, just automatically assume that it will remain forever more.
![]()
You sound jealous? I wouldn't pray for the downfall of anyone's livelihood.You're right, it's often mentioned [I wonder why.....].
Still, not to worry, the railway blinkers have served many very well over the years. No doubt most of the staff will, by now, just automatically assume that it will remain forever more.
![]()
A welcome voice of informed reason!I will break the trend but I'm afraid as a time served train guard I think it's a daft dispute. Guards have been working trains with multiple portions alone for a very long time indeed. It is not ideal from a customer service or revenue protection standpoint but that's on the company not the union. OK, in past times things were rather more relaxed about jumping out of the train on to the lineside and clambering up into another portion if need be.
However there are various undesirable outcomes for the guards.
Multiple train managers are expensive. You are suddenly running an outer suburban service alongside Thameslink with twice the manning cost. Remap the service to Thameslink and it could easily be driver only. Even if it remained with EMR all you'd need to make the train DCO would be dispatch staff over a full shift. Use some 700s which might be spare if Thameslink services are reduced permanently and suddenly you have an effective answer to the Corby service merging into their network and getting away from the current issues using and maintaining the 360s.
If you give other grades safety training you could be training your replacements. Again - move dispatch to the driver/platform staff and you've still got safety trained revenue protection or customer hosts working on board costing less than train managers and able to move around freely.
Accept that the bird has flown with these trains and get on with it.
It isn't quite the same story as the 170s as the routes they operate are rather different in character but the principle remains for me - I find this to be an entirely contrived dispute and a waste of everybody's time and effort.
A welcome voice of informed reason!

You won’t get any deal from the ROSCO. They’ve signed a long term lease with Angel for the 360s. If you decide you want to go for the 350/2s instead, they are Porterbrook’s, so no way are Angel going to accept unilateral lease termination. You’d be paying for two fleets.I suspect it is a bit of a non event as they won’t need 12 car trains for a while. Shame that was all that was available at the time.
Anyone know if they did decide to swap to 350s how much extra training would be needed?
I suspect the ROSCO won’t give a good deal here, so it is probably too expensive.
Angel own the 360sI suspect it is a bit of a non event as they won’t need 12 car trains for a while. Shame that was all that was available at the time.
Anyone know if they did decide to swap to 350s how much extra training would be needed?
I suspect the ROSCO won’t give a good deal here, so it is probably too expensive.
Hence Angel won't want to see the 360 leave EMR...
I suspect it is a bit of a non event as they won’t need 12 car trains for a while.
It will very much be an event if they come out on strike (for an issue tha isn’t happening).
Not sure the length of the lease , but won't the 810's replace them in 2023.How long is their lease on 360s?
Corby is due to remain 360 operated, the 810s replace 180s and 222s on Nottingham/Sheffield services.Not sure the length of the lease , but won't the 810's replace them in 2023.
Ah I see. Thanks for that.Corby is due to remain 360 operated, the 810s replace 180s and 222s on Nottingham/Sheffield services.
How difficult would fitting gangways to the end of 360s be? Are they not essentially 350s without them? Not only would this surely resolve the dispute issue, but be a better experience for both staff and passengers.
but be a better experience for both staff and passengers
The 458s had gangways from new, though.I suppose the SWT Junipers were chopped about to change them into faux-Desiros, but that would be costly.
That's true. Perhaps a design which can retract when using a leading cab could be used. But as Bletchleyite said, its all cost which I'm sure the operators could do without.Not for the drivers!
The 460s that were converted to 458531-536 with gangways didn’t, though.The 458s had gangways from new, though.
Probably cost so much it would be cheaper to ride a strike out!This is all entering the £millions mark where it's probably cheaper to put 2 TMs on the few 12 cars you'd run!
To most readers of that paper this must seem totally mad! "No other alternative?"The union says EMR has imposed new working arrangements on the multi-unit 12-carriage trains which it believes are unsafe, with only one train manager working on them – although EMR said it “does not operate any 12-carriage trains”.
The union said it has “no other alternative than to escalate the dispute and call strike action in the form of not working 12-car trains alone and strike action across a number of Sundays”.
No intention at the moment, but that doesn't mean never if passengers numbers ever recover to a point they are needed. After all the new platform 4 at Wellingborough was built to accommodate 12 car 360s to match all the other stations on the route and there's an OFF indicator that can't be seen by anyone other than the guard in the rear portion of a 12 car train.If indeed EMR have no intention of operating 12 car trains in service they can't have explained that very well. I'd be interested to see the briefing sent out with the RMT ballot paper and the voting returns calling for such action.
No intention at the moment, but that doesn't mean never if passengers numbers ever recover to a point they are needed. After all the new platform 4 at Wellingborough was built to accommodate 12 car 360s to match all the other stations on the route and there's an OFF indicator that can't be seen by anyone other than the guard in the rear portion of a 12 car train.
Well there are 21 units and it requires 14 of them to run every service as 8 car. Given that most days poor reliability means even that can't be achieved leading to one or two diagrams being 4 car, perhaps the scenario of a 12 car train might remain a myth for a long time anyway.Indeed, but you could leave the debate until then. Or if as is likely in the "new world" there are only say 2 12-car workings each way per day, then it's probably cheaper just to agree to it.