YorksLad12
Established Member
Penistone-Sheffield is around 46 minutes but the single track probably puts paid to that idea. But an hourly service on that route could take over the existing stopping service from Barnsley to Sheffield. Passenger survey required: to people from Darton travel to Leeds, Wakefield, Sheffield or some station in between? If not the in-between stations the current stops could be replaced with stops on the semi-fasts.It's a frustrating one - I wouldn't want to risk one unit doing an hourly Sheffield - Barnsley stopper (given lack of recovery time), but it'd be a huge waste to use a second unit just to fill that hourly service (and there's no room at Sheffield to occupy a platform for that long either!) - I'll accept that this is a weak link in my plan for a half hourly Sheffield - Leeds - Knottingley service.
I know that there are lines where we have to use resources poorly, like the two DMUs needed to cover Huddersfield - Bradford since one unit cannot manage the thirty six miles of the round trip within one hour, but I'd want to reduce such cases where possible. Maybe an alternative usage would be to run a half hourly Sheffield - Penistone service with hourly extension to Huddersfield (i.e. extending to Penistone rather than having the unit sitting around for long periods at Sheffield)? I don't know - it's just awkwardly too far/ long for one unit to do "just" Sheffield - Barnsley (all stops) though
Ultimately, if you want to speed up services between Leeds and Sheffield take the route via Westgate. Ultimately ultimately, wait 20 years for HS2