adrock1976
Established Member
Thinking about when HS2 reaches Crewe, I have briefly thought about a possible Taktplan service pattern for North Wales, Chester, and Shrewsbury areas. My suggestion is below.
London Euston - Chester (Traditional InterCity) calling Milton Keynes Central, Rugby, Stafford, Crewe, and Chester every 60 minutes. Extended to Holyhead every 2 hours calling Fflint, Prestatyn, Rhyl, Colwyn Bay, Llandudno Junction, Bangor (Gwynedd), and Holyhead.
London Euston - Shrewsbury (Tradtional InterCity) calling Watford Junction, Milton Keynes Central, Rugby, Coventry, Birmingham International, Birmingham New Street, Sandwell & Dudley, Wolverhampton, Telford Central, Wellington Telford West, and Shrewsbury every 60 minutes.
Birmingham New Street (or International if unable to dedicate Platform 4c to this for the layover) - Chester (Regional) calling Smethwick Galton Bridge, Dudley Port (for Midland Metro), Wolverhampton, Telford Central, Wellington Telford West, Shrewsbury, and all stations to Chester via Wrexham General every 60 minutes (portion for Aberystwyth could couple/uncouple every 60 minutes or every 2 hours at Shrewsbury).
Liverpool Lime Street - Llandudno via Halton Curve calling all stations every 60 minutes (including Mickle Trafford if ever reopened).
Liverpool Lime Street - Cardiff Central via Halton Curve, Wrexham, and Craven Arms calling all stations every 60 minutes (including Mickle Trafford if ever reopened).
Manchester Piccadilly Main Shed - Swansea/Abertawe (Regional Express/upgraded to Traditional InterCity?) via Craven Arms, calling Stockport (if not routed via Styal), Wilmslow, Crewe, Shrewsbury, Ludlow, Leominster, Hereford, Abergavenny, Cwmbran, Newport (Gwent), Cardiff Central, Bridgend/Pen-y-Bont, Port Talbot Parkway, Neath/Castle-nedd, and Swansea/Abertawe every 60 minutes. Could run non-stop Shrewsbury - Hereford if not too controversial, as the Liverpool will cover the intermediate stations.
Manchester Victoria - Caernarfon via Warrington Bank Quay, calling Newton-le-Willows, Earlestown, Warrington Bank Quay, Helsby (for Merseyrail, if extended from Ellesmere Port), Chester, Fflint, Prestatyn, Rhyl, Colwyn Bay, Llandudno Junction, Bangor (Gwynedd), and Caernarfon every 60 minutes.
Crewe - Holyhead calling Chester, Llandudno Junction, and all stations to Holyhead every 60 minutes.
Llandudno - Amlwch via Llandudno Junction calling all stations every 60 minutes (stations after diverging beyond Llanfair PG possibly Pentre Berw for Gaerwen (Holyhead Road), Llangefni (High Street), Llanerchymedd (Holyhead Road), and Amlwch (Salem Street Car Park).
Llandudno - Blaenau Ffestiniog calling all stations every 2 hours.
Birkenhead North - Wrexham Central via Borderlands every 30 minutes.
The above would provide a combined frequency along the following common sections of route:
Liverpool Lime Street and Chester via Halton Curve every 30 minutes
Chester and Shrewsbury via Wrexham every 30 minutes
Shrewsbury and Birmingham New Street (or International) every 30 minutes (excluding the West Midlands all stations local)
Shrewsbury and Cardiff 2tph (not an even 30 minute frequency if the Manchester runs non stop to Hereford)
Crewe and Chester every 30 minutes
Chester and Holyhead 2tph
Chester and Llandudno Junction 3 or 4tph
Llandudno Junction and Llanfair PG every 30 minutes
The only reopenings of lines in North Wales I have heard of are the lines to Amlwch, and Bangor - Caernarfon. Unsure if there are any others (which may be unlikely).
Any other suggestions on a post-HS2 service pattern?
London Euston - Chester (Traditional InterCity) calling Milton Keynes Central, Rugby, Stafford, Crewe, and Chester every 60 minutes. Extended to Holyhead every 2 hours calling Fflint, Prestatyn, Rhyl, Colwyn Bay, Llandudno Junction, Bangor (Gwynedd), and Holyhead.
London Euston - Shrewsbury (Tradtional InterCity) calling Watford Junction, Milton Keynes Central, Rugby, Coventry, Birmingham International, Birmingham New Street, Sandwell & Dudley, Wolverhampton, Telford Central, Wellington Telford West, and Shrewsbury every 60 minutes.
Birmingham New Street (or International if unable to dedicate Platform 4c to this for the layover) - Chester (Regional) calling Smethwick Galton Bridge, Dudley Port (for Midland Metro), Wolverhampton, Telford Central, Wellington Telford West, Shrewsbury, and all stations to Chester via Wrexham General every 60 minutes (portion for Aberystwyth could couple/uncouple every 60 minutes or every 2 hours at Shrewsbury).
Liverpool Lime Street - Llandudno via Halton Curve calling all stations every 60 minutes (including Mickle Trafford if ever reopened).
Liverpool Lime Street - Cardiff Central via Halton Curve, Wrexham, and Craven Arms calling all stations every 60 minutes (including Mickle Trafford if ever reopened).
Manchester Piccadilly Main Shed - Swansea/Abertawe (Regional Express/upgraded to Traditional InterCity?) via Craven Arms, calling Stockport (if not routed via Styal), Wilmslow, Crewe, Shrewsbury, Ludlow, Leominster, Hereford, Abergavenny, Cwmbran, Newport (Gwent), Cardiff Central, Bridgend/Pen-y-Bont, Port Talbot Parkway, Neath/Castle-nedd, and Swansea/Abertawe every 60 minutes. Could run non-stop Shrewsbury - Hereford if not too controversial, as the Liverpool will cover the intermediate stations.
Manchester Victoria - Caernarfon via Warrington Bank Quay, calling Newton-le-Willows, Earlestown, Warrington Bank Quay, Helsby (for Merseyrail, if extended from Ellesmere Port), Chester, Fflint, Prestatyn, Rhyl, Colwyn Bay, Llandudno Junction, Bangor (Gwynedd), and Caernarfon every 60 minutes.
Crewe - Holyhead calling Chester, Llandudno Junction, and all stations to Holyhead every 60 minutes.
Llandudno - Amlwch via Llandudno Junction calling all stations every 60 minutes (stations after diverging beyond Llanfair PG possibly Pentre Berw for Gaerwen (Holyhead Road), Llangefni (High Street), Llanerchymedd (Holyhead Road), and Amlwch (Salem Street Car Park).
Llandudno - Blaenau Ffestiniog calling all stations every 2 hours.
Birkenhead North - Wrexham Central via Borderlands every 30 minutes.
The above would provide a combined frequency along the following common sections of route:
Liverpool Lime Street and Chester via Halton Curve every 30 minutes
Chester and Shrewsbury via Wrexham every 30 minutes
Shrewsbury and Birmingham New Street (or International) every 30 minutes (excluding the West Midlands all stations local)
Shrewsbury and Cardiff 2tph (not an even 30 minute frequency if the Manchester runs non stop to Hereford)
Crewe and Chester every 30 minutes
Chester and Holyhead 2tph
Chester and Llandudno Junction 3 or 4tph
Llandudno Junction and Llanfair PG every 30 minutes
The only reopenings of lines in North Wales I have heard of are the lines to Amlwch, and Bangor - Caernarfon. Unsure if there are any others (which may be unlikely).
Any other suggestions on a post-HS2 service pattern?