Failed Unit
Established Member
Just to avoid clogging up this thread.
www.railforums.co.uk
Demand may be small but how do you solve this one? On the WCML north of Carlisle we only have Lockerbie (Carstairs is off the mainline). On the east we have a number of stations north of Newcastle.
The problem is even if the trains were flighted say.
0000 Edinburgh fast
0003 Edinburgh 1 stop
0006 Edinburgh all stops.
I suspect the following hours fast will catch up with the previous hours all slots. Above of course isn’t real as we have 3tph north of Newcastle already. Freight and they can’t flight them in this way because of the 2 track railway from Northallerton.
The Chathill service gets looped and passed, but if the IC service is late it is waiting in said loop for a long time. If it was continued to Edinburgh the delays would snowball.
Is the local service possible. To me straighten out Morpeth with a new line so the local service can be past while it calls. Maybe even 2 local services with bays built at Berwick. Likelyhood of the business case passing 0. But why should that stop us having fun.
Various consultations on the May 2022 East Coast Mainline timetable
Darlington appears to be one of the stations missing out, as the fastest LNER services are reverting back to missing out Darlington (currently only one LNER train per day doesn’t call, and Darlington’s fastest trains to London only call at York), so many journey times to London are increasing. I...
Demand may be small but how do you solve this one? On the WCML north of Carlisle we only have Lockerbie (Carstairs is off the mainline). On the east we have a number of stations north of Newcastle.
The problem is even if the trains were flighted say.
0000 Edinburgh fast
0003 Edinburgh 1 stop
0006 Edinburgh all stops.
I suspect the following hours fast will catch up with the previous hours all slots. Above of course isn’t real as we have 3tph north of Newcastle already. Freight and they can’t flight them in this way because of the 2 track railway from Northallerton.
The Chathill service gets looped and passed, but if the IC service is late it is waiting in said loop for a long time. If it was continued to Edinburgh the delays would snowball.
Is the local service possible. To me straighten out Morpeth with a new line so the local service can be past while it calls. Maybe even 2 local services with bays built at Berwick. Likelyhood of the business case passing 0. But why should that stop us having fun.
)