RobShipway
Established Member
- Joined
- 20 Sep 2009
- Messages
- 3,337
A few TOC's need trains where they could be replacing both EMU's and DMU's. Many have gone for the bi-mode or tri-mode option such as the class 8xx, 755 or 756. Or have gone with trains being traditionally powered, that can be converted at a later stage if needed.
For for some routes, you may be able to put in OHLE but in some areas where you have obstacles such as tunnels, it may not be so easy to place OHLE through the said tunnel. This is where I like the idea of the class 756 units. They have a pantograph to use overhead where available and diesel plus battery packs where OHLE is not available. The 756's can just run on the battery packs through a tunnel, so all that needs to happen with the Infrastructure is that the OHLE is placed both before and after the tunnel entrances.
Now, you may ask why am I asking about Quad mode. Well, I can see the likes of the a similar design of flirt train like the class 756 replacing the class 171's with Southern on the London Bridge - Uckfield and Eastbourne - Ashford services.
The next question would be why not add this question to the Uckfield thread, well the question is about whether you could build a tri-mode 756 as is being built for TFW and have it also be able to use 3rd rail?
For for some routes, you may be able to put in OHLE but in some areas where you have obstacles such as tunnels, it may not be so easy to place OHLE through the said tunnel. This is where I like the idea of the class 756 units. They have a pantograph to use overhead where available and diesel plus battery packs where OHLE is not available. The 756's can just run on the battery packs through a tunnel, so all that needs to happen with the Infrastructure is that the OHLE is placed both before and after the tunnel entrances.
Now, you may ask why am I asking about Quad mode. Well, I can see the likes of the a similar design of flirt train like the class 756 replacing the class 171's with Southern on the London Bridge - Uckfield and Eastbourne - Ashford services.
The next question would be why not add this question to the Uckfield thread, well the question is about whether you could build a tri-mode 756 as is being built for TFW and have it also be able to use 3rd rail?