• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Could Eurostar trains be shortened?

Status
Not open for further replies.

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
And of course the class 319 never met any of these!

I imagine as a one-off run with a suitable risk assessment and contingency planning done and few/no other trains about in the tunnel.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

HarryL

Member
Joined
14 Sep 2020
Messages
264
Location
Leeds
Could Hitachi build an 800 series 200m long train that meets the tunnel regs to enable a rival service to run? Could cost be reduced by running the service from Stratford as a cheaper terminal and to get it open? I'm imagining a standard class only no frills service aimed at the easyjet end of the market.
It'd be hypothetically possible, but whether it would ever happen is another story. Competition to the Eurostar doesn't seem to ever take off, of course DB got the closest to doing it with the ICE train in St Pancras and the multiple subsequent concepts that all got shelved and Eurostar eventually gobbled up the original route plan.

An SNCF Ouigo-style service would be interesting but Ouigo runs at a loss if I recall correctly and with the UK government unwilling to spend any money saving Eurostar as it is, I can't imagine they would want to invest in this idea either.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,849
Which are designed to replace LH sets on IC routes - unless I've not been keeping up :)
It’s a bit more complex than that, I think. They appear to be being used on the Berlin-Ruhr services that split in place of ICE2 sets. I assume these then replace LHCS.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
35,861
Could Hitachi build an 800 series 200m long train that meets the tunnel regs to enable a rival service to run? Could cost be reduced by running the service from Stratford as a cheaper terminal and to get it open? I'm imagining a standard class only no frills service aimed at the easyjet end of the market.

Very difficult to run a service to terminate at Stratford. The unit has to run empty to (almost) St Pancras to reverse. And whoever did it would be paying for the not insignificant total cost of the border control / customs at Stratford.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
21,969
Location
Airedale
It’s a bit more complex than that, I think. They appear to be being used on the Berlin-Ruhr services that split in place of ICE2 sets. I assume these then replace LHCS.
Thanks. W****a has them as 230km/h which is below HSL speed.
 
Status
Not open for further replies.

Top