• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Busiest terminal platform (departures per hour)

Status
Not open for further replies.

Pumbaa

Established Member
Joined
19 Feb 2008
Messages
5,022
But that isn't actually a terminating service, it usually go's through to Hadfield.

Similar to Bradford Interchange, terminal platforms with hardly any terminating services....

I meant Hadfield :oops:
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Nym

Established Member
Joined
2 Mar 2007
Messages
9,785
Location
Somewhere, not in London
Manc Airport?

They've started stacking services behind eachother, the train at the county end of the platform is cleaned and prepared between piccadilly and the airport, and the one behind it on site, but I've seen them turning them round in 3 minutes at MIA, I know there are now 3 platforms, but platform 1 (the new one) is generally used by the electrics, so sees 3/hour, so I'd say 4/hr on each of the other ones, remembering aswell most of these are technically intercity turnrounds.

Off Peak:
Newcastle 1tph
Middlesbrough 1tph
Cleethorpes 1tph (Long turnround)
Blackpool North 1tph
Lancaster (Barrow / Scotland) 1tph
Southport 1tph
Liverpool L St via Chat Moss 1tph
Manchester Picc 2tph
Wilmslow / Crewe 1tph
and possibly Chester via Chat Moss 1tph (Soon to come?)

Or one of the eastern platforms at piccadilly in the peak, turning round for the rose hill, sheffeild, TPE North, and Glossop Lines...
 
Last edited:

Invincibles

Member
Joined
12 Jul 2009
Messages
511
Location
Suzhou, Jiangsu, China
My first thought was Manchester Airport.

However 1,2 and to some extent 3 to handle a lot of services and can also be stacked a lot of the time. Not sure what the figures are but Platform 2 always strikes me as being the busiest of the lot.
 

tbtc

Veteran Member
Joined
16 Dec 2008
Messages
18,057
Location
Reston City Centre
Manchester Airport has to be in with a shout, especially as it's complicated by different long-distance trains having different turnarounds

The reason for this thread is that I had an idea which involved Cannon Street in London dealing with eighteen arrivals/ departures per hour on a strict "interval" service (three clock face ten minute services) and I didn't know whether a seven platform station would be suitable.
 

507 001

Established Member
Joined
3 Dec 2008
Messages
2,176
Location
Huyton
When Chester goes half hourly on the wirral line that'll be 4 p/h onto one platform

Chester is already half hourly?

I think you mean quarter-hourly?
Besides, Kirkby and Ormskirk already do 4TPH onto one platform.

Liverpool Central wirral line deals with a train every 5 mins, and the northern line platforms cant be far off that either.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,292
Liverpool central isn't a terminating platform though
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
Liverpool central isn't a terminating platform though

It is for eight services an hour offpeak, Northern Line platforms.

Not a contender though, four an hour per platform is nothing compared with some.
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
10,292
It is for eight services an hour offpeak, Northern Line platforms.

Not a contender though, four an hour per platform is nothing compared with some.

He said Wirral line though
 

ukrob

Established Member
Joined
15 Jan 2009
Messages
1,810
He said Wirral line though

I wasn't replying to the person who was talking about the Wirral Line, I was just adding to the discussion. He wasn't talking about Liverpool Central at all as it happens.
 

MikeWh

Established Member
Associate Staff
Senior Fares Advisor
Joined
15 Jun 2010
Messages
8,571
Location
Crayford
West Croydon? 6tph and three platforms, but don't know how they are spread between platforms.

The overground trains arrive on the sutton bound platform, move empty to a middle siding just outside the station, then re-enter the main London bound platform when they're ready. Thus the station isn't actually a terminus for them. The bay platform turns round Southern trains but there aren't as many of them now the Overground has taken some of their paths.
 

Nym

Established Member
Joined
2 Mar 2007
Messages
9,785
Location
Somewhere, not in London
Due to being bored this morning and not having much else to do, turnround times for Man Airport

Working round the clockface with actual arrival times from experience, these tend to vary greatly from the actual timetable...

xx:00 Lancaster (Barrow/Scotland) arrives at xx-1:47 to xx-1:50 onto platform 2a
xx:03 Southport arrives and is stacked infront of the NCL train to be mentioned on 3b, comes in immediatly behind the Lancaster
xx:05 Newcastle arrives off Middlesbrough just before the Lancaster and parks in 3a
xx:11 Manchester Piccadilly Stopper off Crewe/Wilmslow uses 1b and stacks infront of the same service in the opersite direction for crewe, usually arrives 3min previously, if late, this is somtimes directed onto 2a
xx:17 Wilmslow/Crewe, comes in at xx:05-09 and gets stuck in platform 1a by the xx:11 to Piccadilly
xx:29 to Blackpool North arrives at xx:20-23 usually 3b unless it's been extended to 6 coaches then it can be slotted onto 2b same deal as the other TPE N and TPE NW services, usually parking infront of the...
xx:35 to Middlesbrough arriving at xx:17-20 having to wait for the xx:17 MAN to leave
xx:41 to Liverpool Lime St. arrives ahead of the Middlesbrough at xx:14-17ish uses 2a
xx:46 to Piccadilly Stopper, can use either 1b (parking infront of the cleethorpes service that used to call all stations) or 3a, depending on what time it gets pathed into the airport
xx:55 Cleethorpes runs infront of the stopper down the airport line and behind it out, has about a 35min turnround, usually arriving after the WML/CWE service vacates Pt.1a arriving approx xx:18-25

and back to the top ;)

Adds up to 10tph, with the most on platform 1, as the BPN service is shared pretty equally between 2b and 3b, depending on whats happening with the Liverpool L St Service
 