With the class having done route learning in the Doncaster area earlier this month, how long before they appear on the southern part of the ECML ie the area under Peterborough and Kings Cross PSBs control or even in the area under Cambridge PSB?

Or will they be destined never to make a appearance?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

matt

Forum Staff
Staff Member
Global Moderator
Joined
30 Jun 2005
Messages
8,874
Location
Rugby
With the class having done route learning in the Doncaster area earlier this month, how long before they appear on the southern part of the ECML ie the area under Peterborough and Kings Cross PSBs control or even in the area under Cambridge PSB?

Or will they be destined never to make a appearance?

Does Freightliner have any workings in these areas?
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,562
Location
Somewhere
I'd say that as more come over you will eventually see them on other routes. As it stands for the time being though, only one is allocated to intermodal and that is busy with the 30 wagon 4L69/4M93 services.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
There's a FL crew cabin on platform 3 at Peterborough isn't there?
 

87019Chris

Member
Joined
21 Jun 2010
Messages
339
Location
Brad(t)ford
70007 should be working out of southampton so there are no workings on east coast intermodal services along with 70001 on service as above
 

D6975

Established Member
Joined
26 Nov 2009
Messages
3,053
Location
Bristol
A new chord is being put in at Ipswich so that liners don't have to run round to head towards Ely.
Once the new chord is put in, sending other FL services out of Felixstowe via Ely and Peterborough rather than via London becomes more attractive, so an increase could be on the cards.
Unless the cuts have changed things of course....
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,774
Might it be brought forward again now the A14 upgrade has been shafted? Something needs done to get the bloody lorries off that road! Cambridge to Huntigdon they are apparently 1/4of the vehicles on the road but are involved in 1/3 of the accidents.

Ideally (hah) the line would get wired up- would be good for the freight as well as for passengers. But that's unlikely to happen anytime soon.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
The last I heard, the chord has been put back to 2013/14

That's definitely when NR's August press release said it would complete, but I don't think it's actually a delay, was there ever an earlier confirmed date? Back in March 09 NR were mentioning the proposed Bacon Factory curve, and that its TWA Order was yet to be applied for.

IPSWICH-RAIL-UPGRADE-EXPANDED-FOLLOWING-HUGE-PUBLIC-SUPPORT
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,562
Location
Somewhere
I seem to recall hearing or reading somewhere the chord opening was supposed to be done before the Olympics started. Not sure if it was just hear say, rumours of just a pipe dream.

Saying that, Ipswich yard was ment to be remodelled so perhaps the 2012 time frame was for that?

In all honesty I'm not quite sure how much of a benifit this chord will bring. OK so it will negate the need for run round moves but the trains often wait in the yard for a suitable path either down the branch or down the main.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,308
I seem to recall hearing or reading somewhere the chord opening was supposed to be done before the Olympics started. Not sure if it was just hear say, rumours of just a pipe dream.

I think it is mainly down to wishful thinking by the Olympics people, wanting to minimise freight through Stratford. I think what probably happened is people presumed that the whole freight corridor gauge clearance project from Felixstowe to Nuneaton is one job to be finished soon, and the curve isn't really required for the main aim, it's a further project added on afterwards to increase line capacity in the Ipswich area.
 