• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Could Eurostar trains be shortened?

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Is it possible to shorten the trains? Mainly talking about e300. And if so, would that reduce costs?

Not commercially rational. AIUI Eurostar pay per path to use the tunnel, so makes sense to maximise the number of passengers you carry per train.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
OK so going back on myself a little, I've been thinking (and researching) some more. Apologies if this has already been discussed, but I've been reading about a Thayls and Eurostar merger. What are the chances of this actually happening, and if so, how will this impact services run?
 

RT4038

Established Member
Joined
22 Feb 2014
Messages
5,457
OK so going back on myself a little, I've been thinking (and researching) some more. Apologies if this has already been discussed, but I've been reading about a Thayls and Eurostar merger. What are the chances of this actually happening, and if so, how will this impact services run?
Very little impact on services I would expect. There will be some administrative and procurement savings I should think. Possibly some standardisation of product? Greater likelihood of E* trains interworking on Thalys routes?
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
Greater likelihood of E* trains interworking on Thalys routes?
That's the part I'm most curious about. If I was running the company, from a cost perspective, it would make more sense getting people to interchange with Thalys at some point instead of just going straight there by E*, but I don't know how best that could be done. An earlier discussion I had, pointed out that Lille, despite being the perfect spot to interchange, doesn't have the capacity to do so.
 

D6130

Established Member
Joined
12 Jan 2021
Messages
9,083
Location
West Yorkshire/Tuscany
If I was running the company, from a cost perspective, it would make more sense getting people to interchange with Thalys at some point instead of just going straight there by E*, but I don't know how best that could be done. An earlier discussion I had, pointed out that Lille, despite being the perfect spot to interchange, doesn't have the capacity to do so.
That may look good from a cost perspective, but having to change at Lille would completely disincentivise the vast majority of Eurostar passengers, for whom the seamless through journey from capital to capital is the main attraction. In addition, the necessity to undergo passport and security formalities at Lille during a change of trains in the London-bound direction, instead of prior to commencing the journey in Brussels or Paris, would be a double disincentive....not to mention totally impractical with the limited space and facilities available at Lille Europe.
 

RT4038

Established Member
Joined
22 Feb 2014
Messages
5,457
That's the part I'm most curious about. If I was running the company, from a cost perspective, it would make more sense getting people to interchange with Thalys at some point instead of just going straight there by E*, but I don't know how best that could be done. An earlier discussion I had, pointed out that Lille, despite being the perfect spot to interchange, doesn't have the capacity to do so.
No, that is not what I mean. I do not expect the main E* services to change at all, or any exchange of passengers en-route etc, any more than is done now.
If there are not sufficient passengers to fill the London-Paris or London-Brussels services then the frequency would be reduced to ensure the trains are economically filled.

It is however possible that E* rolling stock may sometimes be used on (what is currently) purely Thalys services (i.e. Paris-Brussels-Amsterdam in particular). It will not happen the other way round.
 

MattRat

On Moderation
Joined
26 May 2021
Messages
2,128
Location
Liverpool
No, that is not what I mean. I do not expect the main E* services to change at all, or any exchange of passengers en-route etc, any more than is done now.
If there are not sufficient passengers to fill the London-Paris or London-Brussels services then the frequency would be reduced to ensure the trains are economically filled.

It is however possible that E* rolling stock may sometimes be used on (what is currently) purely Thalys services (i.e. Paris-Brussels-Amsterdam in particular). It will not happen the other way round.
But would ticketing be easier? Say they cut services from London to just Paris and Brussels, but you want to go to Amsterdam, would an interchange be easier as it is all under one roof so to speak?

Also what are the chances they'd cut total stock. The 373s would be pretty redundant at that point, for example. Although, the channel tunnel regulation, might not allow Thalys sets, so who knows what they'd actually cut.
 

RT4038

Established Member
Joined
22 Feb 2014
Messages
5,457
But would ticketing be easier? Say they cut services from London to just Paris and Brussels, but you want to go to Amsterdam, would an interchange be easier as it is all under one roof so to speak?

Also what are the chances they'd cut total stock. The 373s would be pretty redundant at that point, for example. Although, the channel tunnel regulation, might not allow Thalys sets, so who knows what they'd actually cut.
I think that Eurostar have offered Eurostar + Thalys tickets (London-Rotterdam/Amsterdam/Aachen/Cologne) for some time now, so I am unsure how the ticketing could get any easier in that regard?

There is already precedent of E* leasing out surplus rolling stock to other operators (both in the UK and France), so if anyone [who was not a competitor!] brandished hard cash I am sure E* would take the opportunity. Might even sell if it becomes clear that traffic is not going to recover within a reasonable time frame.
 

StephenHunter

Established Member
Joined
22 Jul 2017
Messages
2,919
Location
London
But would ticketing be easier? Say they cut services from London to just Paris and Brussels, but you want to go to Amsterdam, would an interchange be easier as it is all under one roof so to speak?

Also what are the chances they'd cut total stock. The 373s would be pretty redundant at that point, for example. Although, the channel tunnel regulation, might not allow Thalys sets, so who knows what they'd actually cut.
Hasn't the fire regulation changed?
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,493
Location
london
Eurostar need 400m trains for efficency of there paths but i really wonder if running these as 2x200m units may work better, could allow more frequent Amsterdam services with just the front 200m section extending on many Brussels services and could also allow a few combined Paris/Brussles services with a split at Lille, only pay for one HS1 path at times of the day with lower demand
 

RT4038

Established Member
Joined
22 Feb 2014
Messages
5,457
Eurostar need 400m trains for efficency of there paths but i really wonder if running these as 2x200m units may work better, could allow more frequent Amsterdam services with just the front 200m section extending on many Brussels services and could also allow a few combined Paris/Brussles services with a split at Lille, only pay for one HS1 path at times of the day with lower demand
Sounds likes they would spend any savings on reconfiguring the existing rolling stock (or buying new ones) ? Is it really worth it, when they could just run fewer services for the duration?
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,493
Location
london
Sounds likes they would spend any savings on reconfiguring the existing rolling stock (or buying new ones) ? Is it really worth it, when they could just run fewer services for the duration?
i was more suggesting when they originally ordered the e320's any maybe for any fruture orders of rolling stock, even if most of the time they stayed coupled a dual set is far more flexable then a single ling unit, see how DB switched from very long ICE 1's to 2 200m ICE 2/3's
 

RT4038

Established Member
Joined
22 Feb 2014
Messages
5,457
i was more suggesting when they originally ordered the e320's any maybe for any fruture orders of rolling stock, even if most of the time they stayed coupled a dual set is far more flexable then a single ling unit, see how DB switched from very long ICE 1's to 2 200m ICE 2/3's
I think that the time for changing the original order of e320s has long passed, and any future orders of rolling stock are unlikely to be for 30+ years, by which time the passenger demand will have moved on from the current position.
 

Aictos

Established Member
Joined
28 Apr 2009
Messages
10,403
I have a question, what advantages is there for Eurostar to shorten their sets bearing in mind that a 20 car Class 373 was partly replaced by the 16 car Class 374 which takes over 200 extra seats then the former.

So what benefits is there to shorten them even more?
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Eurostar need 400m trains for efficency of there paths but i really wonder if running these as 2x200m units may work better, could allow more frequent Amsterdam services with just the front 200m section extending on many Brussels services and could also allow a few combined Paris/Brussles services with a split at Lille, only pay for one HS1 path at times of the day with lower demand

I get the impression that Amsterdam is a strong market and justifies the whole train.

Plus the 400m capacity gives space for intra-Schengen passengers to use the train (e.g Brussels Amsterdam)

I could see Eurostar moving to most Brussels services running through to Amsterdam.
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,493
Location
london
I get the impression that Amsterdam is a strong market and justifies the whole train.

Plus the 400m capacity gives space for intra-Schengen passengers to use the train (e.g Brussels Amsterdam)

I could see Eurostar moving to most Brussels services running through to Amsterdam.
does make me wonder what the plan will be for platforms 1&2 if the majority of services move to platform 3 to become thru services?
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,847
400m trains are no longer required.
Given that the original E* sets were around 390m in length including power cars and the NoL sets (which did operate through the tunnel) were substantially shorter, I’m not sure where this 400m thing has come from?
 

Ianno87

Veteran Member
Joined
3 May 2015
Messages
15,214
Given that the original E* sets were around 390m in length including power cars and the NoL sets (which did operate through the tunnel) were substantially shorter, I’m not sure where this 400m thing has come from?

I should have said "400m" (the requirement may have been 375m or something like that)
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,847
I should have said "400m" (the requirement may have been 375m or something like that)
It’s been more widely quoted as a requirement in the past, so not aimed at you! Doesn’t explain the NoL sets, either.
 

popeter45

Established Member
Joined
7 Dec 2019
Messages
1,493
Location
london
I should have said "400m" (the requirement may have been 375m or something like that)
yea 375m is the distance between the escape tunnels in the channel tunnel but i belive rules now are either that isnt a concern now or you can run shorter if you have a plan in place to avoid stopping at an area without them
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
34,283
Given that the original E* sets were around 390m in length including power cars and the NoL sets (which did operate through the tunnel) were substantially shorter, I’m not sure where this 400m thing has come from?
It was a requirement to always have an emergency escape passageway alongside the train, so trains had to be at least the length between successive escape doors. Although met by the original Eurostar 373s, it was never met by the NoL sets, or the freight shuttles. It was removed from the operating requirements quite a few years ago specifically to allow shorter trains all round, when the route was opened to other operators. I think the requirement to split a train and drive the portions out in opposite directions was removed at the same time.
 

mmh

Established Member
Joined
13 Aug 2016
Messages
4,286
It was a requirement to always have an emergency escape passageway alongside the train, so trains had to be at least the length between successive escape doors. Although met by the original Eurostar 373s, it was never met by the NoL sets, or the freight shuttles. It was removed from the operating requirements quite a few years ago specifically to allow shorter trains all round, when the route was opened to other operators. I think the requirement to split a train and drive the portions out in opposite directions was removed at the same time.

And of course the class 319 never met any of these!
 

S-Car-Go

Member
Joined
19 Mar 2019
Messages
253
The 373s/e300s wouldn't get shortened, but I wonder if the 374s/e320s could be shortened & modified to 8 cars, and coupled together. They are technically 4 powered EMUs coupled into a 16 car set anyway.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,847
They are technically 4 powered EMUs coupled into a 16 car set anyway.
From a technical point of view they are the equivalent of a pair of DB Class 407 ICE sets coupled but with the middle cabs removed.
 

adamedwards

Member
Joined
4 Apr 2016
Messages
796
Could Hitachi build an 800 series 200m long train that meets the tunnel regs to enable a rival service to run? Could cost be reduced by running the service from Stratford as a cheaper terminal and to get it open? I'm imagining a standard class only no frills service aimed at the easyjet end of the market.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,847
Could Hitachi build an 800 series 200m long train that meets the tunnel regs to enable a rival service to run? Could cost be reduced by running the service from Stratford as a cheaper terminal and to get it open? I'm imagining a standard class only no frills service aimed at the easyjet end of the market.
Why would you buy from Detachi? Better to go to Siemens, who have a train design already running through the tunnel.
 
Status
Not open for further replies.

Top