zwk500
Veteran Member
And when it does get going, it'll probably need splitting into at least 5 separate threadsIt's why I love this Forum always dealing with the important matters!
But, in an attempt at a defence, to be fair there isn't that much to go on until the white paper itself appears apart from the broad strokes from the media stories which, to a great extent, had been trailed a while in advance (I'm not sure I've read anything 'new' so far!).
Personally what I'm most interested in (apart from staffing levels at whatever NR becomes) is whether the new concession structure allows more flexible timetabling & Engineering access as this new body will have a 'bigger picture' and potentially the authority to implement it.
