"So apart from HS1 (rescued from collapse, and opened on time and budget), WCML (rescued from Railtrack bungling), Leeds station upgrade, removing commuting slam-door stock, restarting Crossrail (after being canned by the Tories), massive investment in London Underground, getting HST replacement underway, rebuilding Reading station, the London Overground, restarting large-scale electrification, and starting HS2, WHAT DID LABOUR EVER DO FOR THE RAILWAYS?"
Can't help but admire this bold attempt at exonerating Railtrack. What next, the Star Wars prequels?
Refer back to
@edwin_m's reply.
Let's deal with those in turn:
HS1 - the project didn't get under way until 1996 when the Channel Tunnel Rail Link Act became law. So within 2 years the project was in distress - not sure Labour can lay claim to rescuing a project which was in distress after 2 years, half of it under their tenure.
Removing slam door commuter stock - except that before 1997, the commuter services from Paddington, Marylebone, Euston, St Pancras, Kings Cross and Moorgate were all sliding door, most of the services from Liverpool Street and Fenchurch Street (some peak workings weren't) were also sliding door, as well as a good number on the Southern covered by Class 455, 456, 465, 466, 508. Outside of London slam door stock had been disappearing with the introduction of Class 323, second-gen DMUs (150,155,156,158,159) and various others.
Crossrail - OK, I'll give you that, but it had previously been floated in the 1990s and didn't have a viable business case.
HST replacement - any government would have done that, given the fleet was 25 years old by the year 2000 - in fact Labour didn't even publish the tender for it until 2007 (by which time the HST fleet was over 30 years old).
Restarting electrification - yes, OK , they announced it....... in 2009, one year before the election and having been in power for 14 years.
On London Underground - the biggest investment was in the S stock - again, replacing 40+ year old units, any government would have done that - it was in effect basic maintenance.
HS2 - again not done until 2009 - having been in power for 14 years. And that was only the preliminary 'assessment'.