zwk500
Veteran Member
I explained in Post #25 how you get a completely conflict free station that only requires moderate rebuilding of the Up side.But what I in particular like about switching York to Northallerton from being paired by speed rather than by direction is that it would also allow the accessibility issue to be sorted out at Thirsk without moving/building a brand new station!
Immediately north of York it reduces to 2-tracks, then from Skelton Jn there's a couple of miles or so of 4-track with the slows on the west of the fasts, before the Up Slow transitions at Skelton Bridge Jn. I don't see why paired by use with the slows on the east side gives any advantage at all. You solve a non-existant problem at Northallerton and create a much bigger problem at Skelton Bridge Jn.
Not quite: York station is paired by route. Trains from Leeds use the higher-numbered platforms and trains from Doncaster use the lower-numbered side (where available). Freight running via Sherburn will tend to use either side depending on how their path works and what they do at Colton Jn. And the York avoiding line is only accessible from the Leeds lines, so trains going to York Yard or being kept out of the station need to be on the Down/West side at Skelton Bridge or Colton North Jn.Also York is already ideal as the fast services already serve the left hand side of the station.
On a side note, which side is left and right in your posts? Left and Right are dependent on the POV being defined first. Could I ask for clarity please can you use East/West or Up/Down, in this context?

