This project is now underway at BM. 2419 was the prototype, and 2418 is being done nowOh ok I just put that they had been done, becuase by the time they re-enter service, if ever, then they will be done anyways.![]()
Totally? So they will send all the modified units back and (presumably) to scrap?Heard a rumour from a generally reliable source that as a result of problems with the retractioned units during testing, and COVID meaning less demand for peak extras, SWR are now going to abandon the project.
No word on what the future plans for the units are yet.Totally? So they will send all the modified units back and (presumably) to scrap?
If it was me I'd try to get some use out of the ones that have been done (don't let my username make you think I have any biasNo word on what the future plans for the units are yet.
If it was me I'd try to get some use out of the ones that have been done (don't let my username make you think I have any bias), but I can understand sort of if they decide not to, still would be a huge waste although hindsight is a wonderful thing.
Heard a rumour from a generally reliable source that as a result of problems with the retractioned units during testing, and COVID meaning less demand for peak extras, SWR are now going to abandon the project.
Indeed, if only they hadn't just allowed the scrapping of the unused and unrefurbished motor coaches too...
I think people sometimes forget how old the Mark 3 design is now. Although these are fairly new as Mark 3 EMUs go, they're over 30 years old and have been stored out of use in less than ideal conditions for fairly lengthy periods. They're made of steel, and steel rusts. A lot of Mark 3s are suffering from very serious corrosion problems these days, and solving that issue is complex and expensive.Those were the motor coaches in the worst physical condition with severe corrosion.
To be honest without knowing the source I'm a little skeptical of that rumour. From what I've heard it won't save them any money to cancel the project now, and they were still testing them recently after agreeing the recent ERMA extension with DfT.
I am bias though![]()
I wonder if there is any connection with the new SWR MD starting yesterday, though like most things I'd imagine the DfT have a controlling say.
To be honest without knowing the source I'm a little skeptical of that rumour. From what I've heard it won't save them any money to cancel the project now, and they were still testing them recently after agreeing the recent ERMA extension with DfT.
It eliminates a micro-fleet with all the problems they create, and immediately eliminates the need to train crews on operating them.It won’t save money on the project, or the leases, but will save money on not operating or maintaing them.
It won’t save money on the project, or the leases, but will save money on not operating or maintaing them.
== Doublepost prevention - post automatically merged: ==
Unlikely to the point of impossible.
It would be stupid to scrap them at this stage. I guess it depends on whether they can be successfully kept in storage until the long term picture becomes clearer. Is providing 2+2 rolling stock on Pompey services a cast-iron franchise commitment that can't be wriggled out of?Agree really, was just clutching at straws.
Tbh, I doubt a final decision has been made.
While no one really expects a return to sardines every day in the peaks anytime soon, I'm not sure anyone really knows exactly know this will all play out and what the rebound will be.
If pax numbers for peaks return strongly in next couple of years then they may need extra capacity on mainline services and would be attractive for reluctant returnees too.
Who knows the truth....
It would be stupid to scrap them at this stage. I guess it depends on whether they can be successfully kept in storage until the long term picture becomes clearer. Is providing 2+2 rolling stock on Pompey services a cast-iron franchise commitment that can't be wriggled out of?
Numerous problems they were too -It eliminates a micro-fleet with all the problems they create, and immediately eliminates the need to train crews on operating them.
Not the first time I've heard this. "Very unlikely" to return is what I was told a few weeks back.Heard a rumour from a generally reliable source that as a result of problems with the retractioned units during testing, and COVID meaning less demand for peak extras, SWR are now going to abandon the project.
My expectation is that the project will continue to progress until it is officially confirmed that it has been abandoned - although potentially a pause could be introduced pending a 'final' decision. So as no confirmation has been announced yet (as far as is known), activities are likely to continue. But I can't help feeling that the project's not going to survive, even if it makes it through this time, partly for the reasons listed above by DorkingMain, which I suggest make the project's business case marginal at best when compared to sourcing other units (while interest rates are low, etc), and also because I don't expect there to be the demand that requires strengthening the fleet.Seems strange that if they are to abandon the project, why are they still doing testing between Weymouth & Wareham at night,
5Z00 2229 Bournemouth Depot to Weymouth is en route with 8 455 (5861/5911) with 2419 parked in the Jersey sidings at Weymouth
for testing tonight ?
People are very welcome to speculate ... providing this takes place in the Speculative Ideas section!Cue desperate attempts to find alternative uses for them...Woodhead again, anyone?
This discussion is for the Covid sectionWith a significant proportion of commuters expected to continue to work flexibly on a permanent basis - ie travelling to/from their workplaces less than five days per week, and with flexible timings (eg WFH until post am peak, then travel into office, etc), I would be surprised if peak travel volumes returned to pre-covid levels in the next few years. Other points supporting this are intentions announced my major employers to reduce office space, government departments being relocated away from London (eg to Wolverhampton), and jobs moving to the EU (particularly in the finance sector). Of course London will continue to be a huge draw both for employers and employees, but I think it's highly likely that the pattern of work and work travel that predominated pre-pandemic has gone for good. This isn't down to covid per se - if it was then things might be expected to return to as they had been, but rather the pandemic has hugely accelerated changes to working practices that were already underway before the pandemic hit.

Hallo and welcomeI'm struggling to load the pictures so don't know if I could get some advice for that.

whether it was ever cast iron