Halifaxlad
Established Member
As some might not know around 60 million is to be spent on A59 between Skipton & Harrogate and separately WYCA have outlined aspirations in their Rail Strategy to improve rail connectivity between Bradford & Harrogate. The obvious answer as also aspired by a certain rail group is via Otley & Pool. Now a previous study declared it is possible to reinstate a line to Otley and even through it subject to modifications to the bypass, this just leaves the bit between the East of Otley and the existing Harrogate Line. Ive been looking at the options which Ive also drawn with my crayons!
A summary of each one is below, please don't forget I was simply optionering and that I don't support forcing people to leave their homes!
Option 1) Old route, would require demolition of a lot of houses.
(Not my favorite)
Option 2) Old route, around the back of the houses and through what is now a woodland
(Not my favourite)
Option 3) Old route, in between houses to the North of the old alignment. Would require about 2/3 houses to be demolished and Old Pool Bank road to be upgraded in order to cut New Pool Bank road in two. (Not my favourite) Although would remove a lot of traffic from Pool!
Option 4) New alignment cutting through the paper mill site, the existing football pitch by the river. (Not my favorite)
Option 5) A whole new alignment crossing the river Wharf once to the West of Pool, running close to the A58 between the farms before joining the Harrogate line just before Weeton! This would be my personal favorite, minimum destruction, no houses to be demolished or playing fields.

For about 4.2 miles of new line, we could have direct services between Skipton, Bradford & Harrogate!
Also Ikley to Harrogate if a chord approximately 1km was put in at that end of the line!
A summary of each one is below, please don't forget I was simply optionering and that I don't support forcing people to leave their homes!
Option 1) Old route, would require demolition of a lot of houses.
(Not my favorite)
Option 2) Old route, around the back of the houses and through what is now a woodland
(Not my favourite)
Option 3) Old route, in between houses to the North of the old alignment. Would require about 2/3 houses to be demolished and Old Pool Bank road to be upgraded in order to cut New Pool Bank road in two. (Not my favourite) Although would remove a lot of traffic from Pool!
Option 4) New alignment cutting through the paper mill site, the existing football pitch by the river. (Not my favorite)
Option 5) A whole new alignment crossing the river Wharf once to the West of Pool, running close to the A58 between the farms before joining the Harrogate line just before Weeton! This would be my personal favorite, minimum destruction, no houses to be demolished or playing fields.

For about 4.2 miles of new line, we could have direct services between Skipton, Bradford & Harrogate!
Also Ikley to Harrogate if a chord approximately 1km was put in at that end of the line!
