• Our new ticketing site is now live! Using either this or the original site (both powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Panoramic cars for scenic lines...

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
5,702
Location
Hope Valley
All those Pacers had nice big panoramic windows, but no-one ever enthused over those.
Lancaster-Leeds and Preston-Leeds has some of the best scenery in the country and the Pacer windows displayed it well - but no-one ever noticed
The views in the Hope Valley from Pacers were great. (But it was time for them to go and I really only liked the original 'bus' seats.)
 

Neptune

Established Member
Joined
29 May 2018
Messages
2,626
Location
Yorkshire
If it wasn't for them being "cheap as f***", as it were, the Class 397 bodyshell would be pretty much that - just do a 110mph variant with the gangwayed cab from the 730 rather than the pointy nose and add some form of generation facility and third rail pickup. The windows are massive, the pillars narrow, there's a slight taper so you do get a view upwards and the seats are aligned to the windows in Standard (in 1st you'd need to play with it a bit but it's not impossible).

I've talked for years of wanting to see a "Class 344" - the 397 is pretty close.
I suspect CAF would use one of their own gangwayed cabs rather than begging Bombardier to use one of theirs and then mess around getting it to fit.
 

MackTen

Member
Joined
23 Jan 2021
Messages
47
Location
North East
Setting out a clear business case is obviously the standout barrier here.

What you need is someone like the A1 Trust. Set a small but clear and achievable goal, market the hell out if it, get the finance behind you, build your train, and then reap the filthy lucre.

Network Rail are, AFAIK, obliged to let anyone who can safely run a train, and actually has a train, fair access to the network. There must be plenty of available paths up there in sunny Scolan, to schedule a twice daily out and back from a reasonably convenient launch point.

It would have to be a charter train, it would have to be steam hauled, if not all the way, then the prettiest section, and it would have to use brand new coaching stock, and it would obviously only run from April to October. It would most likely only run Friday to Sunday in the quieter months, but the sky would be the limit in say, August.

Place an order with a reputable builder, for say ten standard coaches, with perhaps two catering vehicles, and you should have enough to cover for maintenance and breakdowns. Any manufacturer worth their salt, would take that business. Biggest single cost would be the glass most likely.

Over the lifetime of the coaches, you could easily set a pricing structure that would cover operating costs and paying down the capital investment. And there's plenty of ways to make additional money here, since you're the only people in the UK with a glass roofed train.

A twice daily service would mean you most likely create an entire tourist ecosystem of it's own, at each stop along your Nile valley of tourism.

And if the only way you can ride behind the next new steam train that comes out of Darlington, is to pay for a ride on the greenhouse express, well, people gonna pay, and pay good money too.

As usual, it would seem to me the biggest likely obstacle, would be the stuffed shirts at the Ministry. And the weather, given climate change for Scotland apparently means more rain. Good thing we are all doing our recycling, right?
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
The views in the Hope Valley from Pacers were great. (But it was time for them to go and I really only liked the original 'bus' seats.)

It was rare enough to get the opportunity to set next to a window on one on the Hope valley, as I recall.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,879
Setting out a clear business case is obviously the standout barrier here.

What you need is someone like the A1 Trust. Set a small but clear and achievable goal, market the hell out if it, get the finance behind you, build your train, and then reap the filthy lucre.

Network Rail are, AFAIK, obliged to let anyone who can safely run a train, and actually has a train, fair access to the network. There must be plenty of available paths up there in sunny Scolan, to schedule a twice daily out and back from a reasonably convenient launch point.

It would have to be a charter train, it would have to be steam hauled, if not all the way, then the prettiest section, and it would have to use brand new coaching stock, and it would obviously only run from April to October. It would most likely only run Friday to Sunday in the quieter months, but the sky would be the limit in say, August.

Place an order with a reputable builder, for say ten standard coaches, with perhaps two catering vehicles, and you should have enough to cover for maintenance and breakdowns. Any manufacturer worth their salt, would take that business. Biggest single cost would be the glass most likely.
Is this serious? Do you have any idea as to the cost of new rolling stock, let alone a one-off design? And you want to use that train for 7 months per year, of which 3 months will only be three days per week.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,762
Location
"Marston Vale mafia"
Is this serious? Do you have any idea as to the cost of new rolling stock, let alone a one-off design? And you want to use that train for 7 months per year, of which 3 months will only be three days per week.

If someone wanted to do that they'd be best off buying up some Mk4s, presumably for something near scrap value, and rearranging the seats to match the windows. They're not exactly small and the tapered bodyside helps you see up as well as out.

I'm quite looking forward to a ride along the North Wales Coast in them to be honest, even if they do ride worse than a Pacer at 125.
 

MackTen

Member
Joined
23 Jan 2021
Messages
47
Location
North East
Is this serious? Do you have any idea as to the cost of new rolling stock, let alone a one-off design? And you want to use that train for 7 months per year, of which 3 months will only be three days per week.

Is it any more expensive than building a brand new steam locomotive? For stock that will have a service life of at least thirty years, if not longer?

I've got an engineering background, and in bespoke manufacturing to boot, so yes, I do know exactly of what I speak when it comes to the costs of design engineering.

We live in an age where it is already possible to negotiate a huge discount for placing an order simply for two bespoke steam engine boilers, as opposed to one, so yes, you better believe an order for multiple coaches all of the same design, will take a big chunk off the coast of design and manufacture.

Which is not going to be all that great anyway, given there's not much there that's new here. Would be greatly surprised if the biggest ticket item there, wasn't the glass itself (as opposed to say, the work needed for certification of a new vehicle).
 

43096

On Moderation
Joined
23 Nov 2015
Messages
18,879
Is it any more expensive than building a brand new steam locomotive? For stock that will have a service life of at least thirty years, if not longer?

I've got an engineering background, and in bespoke manufacturing to boot, so yes, I do know exactly of what I speak when it comes to the costs of design engineering.

We live in an age where it is already possible to negotiate a huge discount for placing an order simply for two bespoke steam engine boilers, as opposed to one, so yes, you better believe an order for multiple coaches all of the same design, will take a big chunk off the coast of design and manufacture.

Which is not going to be all that great anyway, given there's not much there that's new here.
Well if you're convinced it's a go-er, and you have all that experience, why not go and prove me wrong then?

Would be greatly surprised if the biggest ticket item there, wasn't the glass itself (as opposed to say, the work needed for certification of a new vehicle).
:lol::lol::lol::lol:
 

MackTen

Member
Joined
23 Jan 2021
Messages
47
Location
North East
All excellent arguments against the tabled motion.

Has anyone got any substantive objections to my thoughts? Some vague numbers perhaps. Something that shows, in summary balance sheet form, that the nominal ticket price and other revenue streams of the Greenhouse Express Ltd. would be prohibitively expensive, based on a realistic estimate of what a manufacturer would charge for a rake of twelve glass roofed coaches with a design life of thirty years.
 

E100

Member
Joined
29 Apr 2018
Messages
188
In summary, there's clearly two camps. One which prefers a loco hauled option and one that prefers and enhanced multiple unit. I personally fall into the latter. To me it makes more sense to have all year round stock that runs day in day out on standard services and why not just make it standard stock with a [first class] supplement for a particular coach / seats that offer a particularly good view.

That's not to say though that there isn't a market for the loco hauled stock as well for charters as per. If employed across the network with a focus on the scenic routes, it could well help to bolster the demand for charters as the viability of keeping a large number of Mk1's/2's in mainline service over the next couple of decades. Regular services could be very well received by the international tourist industry during high season which is a part of the market only the Jacobite appears to have captured so far.
 

Llandudno

Established Member
Joined
25 Dec 2014
Messages
2,752
Location
Matlock
If someone wanted to do that they'd be best off buying up some Mk4s, presumably for something near scrap value, and rearranging the seats to match the windows. They're not exactly small and the tapered bodyside helps you see up as well as out.

I'm quite looking forward to a ride along the North Wales Coast in them to be honest, even if they do ride worse than a Pacer at 125.
Yes, looking forward to the Mk4’s on the north Wales coast.

I wonder if TfW will bother marketing which services will be operated by these sets, perhaps suggesting some ideas for leisure day trips?

It seemed to work on the summer excursions on the Settle-Carlisle line, although the north Wales coast line is not as scenic, there is a better choice of destinations for spending a few hours before returning home.

Mind you knowing TfW a clapped out 150 attached to a 153 will turn up!
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,861
Yes, looking forward to the Mk4’s on the north Wales coast.

I wonder if TfW will bother marketing which services will be operated by these sets, perhaps suggesting some ideas for leisure day trips?
Given that the sets include a kitchen/buffet car I expect the relevant services will have a knife and fork icon in the timetable instead of the normal trolley icon. I was going to say that you could also look for the 1st class icon, but I suspect TfW intend to use first-class-fitted 197s on the other Holyhead-Cardiff services (although I still hope somebody in a position to do something about it will realise the 197s are a bad idea in time to put a stop to wholesale fleet replacement).
 

Llandudno

Established Member
Joined
25 Dec 2014
Messages
2,752
Location
Matlock
Given that the sets include a kitchen/buffet car I expect the relevant services will have a knife and fork icon in the timetable instead of the normal trolley icon. I was going to say that you could also look for the 1st class icon, but I suspect TfW intend to use first-class-fitted 197s on the other Holyhead-Cardiff services (although I still hope somebody in a position to do something about it will realise the 197s are a bad idea in time to put a stop to wholesale fleet replacement).
I guess those ‘in the know’ will be aware that certain symbols in the timetable will give an indication of which trains will have Mk4 sets.

But to generate additional revenue and possibly help fill off peak trains then these trains need to be marketed differently to encourage discretionary leisure journeys.

I don’t know what the proposed timings will be like but could you promote something like special day returns to Blaenau Ffestiniog, the Chester to Llandudno Junction section operated by a Mk4 then obviously the ubiquitous 150 along the Conwy Valley?
 

6Gman

Established Member
Joined
1 May 2012
Messages
9,227
I'll throw in one other element for the equation.

Abstraction.

What if all the glasshouse carriage inserted into a 156 (other options are available) does is attract people who would have travelled anyway? Or, to be strictly accurate, how much of the glasshouse revenue is additional rather than displaced?
 

MackTen

Member
Joined
23 Jan 2021
Messages
47
Location
North East
My thoughts were more along the lines of, how mad would the tabloid press be at having a "two tier" railway?

PAY EXTRA FOR A VIEW? HANG THE CAPITALIST PIG DOGS.

Sad that these things have to be considered, but they do.

I think it has to be a charter train, simply for the economics to work.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
113,762
Location
"Marston Vale mafia"
I'll throw in one other element for the equation.

Abstraction.

What if all the glasshouse carriage inserted into a 156 (other options are available) does is attract people who would have travelled anyway? Or, to be strictly accurate, how much of the glasshouse revenue is additional rather than displaced?

If the "glasshouse carriage" was First Class, as would be my proposal, then that would be your answer.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
44,414
Location
Yorks
I'm not sure I'd like the idea of a "glasshouse carriage", presumably with attendant sargaent major to shout at the passengers incessantly.
 

Rhydgaled

Established Member
Joined
25 Nov 2010
Messages
4,861
I guess those ‘in the know’ will be aware that certain symbols in the timetable will give an indication of which trains will have Mk4 sets.

But to generate additional revenue and possibly help fill off peak trains then these trains need to be marketed differently to encourage discretionary leisure journeys.

I don’t know what the proposed timings will be like but could you promote something like special day returns to Blaenau Ffestiniog, the Chester to Llandudno Junction section operated by a Mk4 then obviously the ubiquitous 150 along the Conwy Valley?
The sets currently have only 2.5 carriages of standard class capacity (plus a whole coach of first and half a coach of kitchen) so there's not likely to be much spare standard class capacity to fill. Any special marketing will need to be heavily targeted towards first class I expect.

My thoughts were more along the lines of, how mad would the tabloid press be at having a "two tier" railway?

PAY EXTRA FOR A VIEW? HANG THE CAPITALIST PIG DOGS.

Sad that these things have to be considered, but they do.

I think it has to be a charter train, simply for the economics to work.
Not the press reaction, but a less shouty version is how I think about this; I think we should be trying to make the journey pleasant for all pax. That means no first class (or, if there is, then it should be just the same as standard but with 2+1 instead of 2+2 seating and complimentary non-alcoholic drinks) and ALL passengers having decent legroom, a comfortable seat and an unobstructed view. You don't gain the extra revenue to justify a bespoke carriage with a glass roof, but you would massively reduce the risk of passengers thinking 'that was an unpleasant experience, next time I'm going by car' compared to an ironing board with no legroom placed behind a window pillar. Take the best features of classes 158/175/442/444 and put them on routes like the highlands, Cambrian and Settle-Carlisle and I reckon you wouldn't be far off an experience that passengers would recomend to their friends.
 
Status
Not open for further replies.

Top