However, I'm not even convinced it would be the highest priority if 'demand plummets'.
If "demand plummets", I'm not sure where HS2<>GWML demand magically appears from!
However, I'm not even convinced it would be the highest priority if 'demand plummets'.
Can you pinpoint on a map where you think this chord could be built, where there is a suitable place for a connection off HS2, even as a fantasy idea. I'm just intrigued as to the idea as I don't think it is possible (and certainly not in anyone's plans). HS2 is in a tunnel from Old Oak Common to West Ruislip - I guess you could try coming down the line of the M25 but that is a major piece of construction.
However, I'm not even convinced it would be the highest priority if 'demand plummets'.
London tunnels | High Speed 2
www.hs2.org.uk
Only to an extent, you still have to deal with the conflicts in the throat.The suggestion of still rejigging Euston is that there are a number of platforms that won't take 12.350 or 11.390, so it'd be much easier to operate the station if they could.
Would need a considerable amount of 4 tracking of HS2 to not be detrimental to capacity. Not sure what benefit it would have either.Sorry I forgot to also mention via East to West Rail!
Steeple Clayton is the area where both will cross, so somewhere around theyre!
They couldn’t justify a Heathrow branch off HS2 because there wasn’t enough demand to divert trains there. Most of the GWML destinations will be quicker by XC existing routes, even Birmingham to Reading via HS2 is marginal on time. If demand plummets surely there’ll be less justification for any branch?They're is not much point in that!
Yes I am suggesting if demand plummets and frees up capacity that a chord between HS2 to connect it with the GWML should be considered/built!
Only to an extent, you still have to deal with the conflicts in the throat.
Why would you need 12 car commuting if commuting demand vanishes?
If 2025 needs 12 car paltform lengthening to just about provide enough capacity, then by 2035 we're back to full capacity and needing a third pair.
That's why my suggestion was on the basis of if demand on HS2 plummets and frees up paths! (If)Would need a considerable amount of 4 tracking of HS2 to not be detrimental to capacity. Not sure what benefit it would have either.
And that's a big assumption, that traffic will declineThat's making a big assumption, namely that there will be traffic growth. There's a good chance improving tech and changing work patterns will cause increasing decline.
And that's a big assumption, that traffic will decline![]()
Exactly. The "home working revolution" has been talked about for years, and now that we've had the opportunity to try it out, it's clear that it will never be a 100% replacement for office working.Most probable outcome is a lower baseline of demand, followed by growth from that.
That's making a big assumption, namely that there will be traffic growth. There's a good chance improving tech and changing work patterns will cause increasing decline.
Exactly. The "home working revolution" has been talked about for years, and now that we've had the opportunity to try it out, it's clear that it will never be a 100% replacement for office working.
In September rail was at 40% of precovid. If that's the new baseline, then based on the increase seen over the last 20 years we'll be back upto Jan 2020 levels by 2040. September road traffic was back upto (and even higher) than pre-covid levels. People still want to travel.
True, but what is clear is that it will be a replacement for going in the office every day, which has the potential to close to halve commuter traffic.
The notion of there being a reduced demand in the medium to long term is nonsense. People want to be closer together and as soon as we are through the pandemic, there will be a huge surge in people going here, there and everywhere. I doubt my other half and I are too different from the rest of society, but already we have several planned trips, which is more than we normally would. I expect to be in the office 50% of my time, but that means travelling on public transport is the most financially viable option rather than running a second car.
The railway will be vitally important in getting the country back on it’s feet and it can’t wallow in an assumption that demand will be low, therefore services must be reduced. HS2 and NPR will be needed and to curtail it would be a mammoth mistake.
After a year of bring cooped up, people are going to want to travel. And will. And they'll enjoy it, and want to do it more. Realise how great it is to see family and friends in the pub and put the world to rights. How much better it is to grab a coffee in the break out area rather than via Teams call. And so forth.
We'll learn to live and love again.
After a year of bring cooped up, people are going to want to travel. And will. And they'll enjoy it, and want to do it more. Realise how great it is to see family and friends in the pub and put the world to rights. How much better it is to grab a coffee in the break out area rather than via Teams call. And so forth.
We'll learn to live and love again.
I recon the NPR should focus on the Leeds to Manchester line 1st. Then Connect that to HS2 ( as then you can run York/Leeds-airport services a lot easier which is the 2nd most popular route though Manchester I bet) Then Build out to York and finally to Liverpool which is not that bad or cramp as MAN-LDS.
1: Build HS2 Phase 1 and 2a in full
2: Build NPR in full, as well as short routes to Liverpool and Manchester HS2 branches (on the NPR route)
3: Upgrade the northern ECML (YRK - EDB) and northern WCML (CRE to GLC/EDB)
4: Build all remaining parts of HS2 Phase 2b
5: Build high speed route avoiding all traffic and large curves in Northumberland and Scotland*
* This would go on segregated track and go underground from where a lot of houses start to pop up getting towards Edinburgh and Glasgow (from each side). Would be used by HS2 and NPR plus maybe some selected 140mph express services.
Correct - The majority of these would be on the NPR route as well (Crewe/Liverpool to Manchester)I assume by short branches to Liverpool & Manchester, you’re referring to the proposal via Warrington to Liverpool and the Crewe-Manc HS2 branch leg?
Correct - The majority of these would be on the NPR route as well (Crewe/Liverpool to Manchester)
Pretty much.Oh ok, so if I understand, you’re saying in point 2 to build HS2 phase 2b western branch plus a new line to Liverpool and a new line across (or under) the Pennines.
Hopefully NPR will be built in full, but I suspect that there will be several intermediate stages. For example, before HS1 and HS2 phase 2b was/is built, Eurostar and HS2 services appear on the existing main lines, until the new lines are operational. NPR might be the same, with Trans Pennine Route upgrade filling that void.Pretty much.
Everything NPR plus most of the (in my view) helpful chords and branches to have the best benefits as early as possible.